NECPUC SYMPOSIUM Concurrent B Natural Gas Conditions Facing New England Mark R. Babula ISO New England Inc. Supervisor - Power Supply & Reliability June.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

Assessment of Peaking Gas Service for New Englands Quick Start Generators Planning Advisory Committee March 3, 2005 Herbert Rakebrand III Herbert Rakebrand.
Utility Programs – What Has Been Learned and Where Are We Going U.S. Demand Response Coordinating Committee National Town Meeting on Demand Response June.
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
© 2004 Dominion Dominion Proposal January 24, 2005.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
Setting a New Course for Electricity in Ontario Presented to the WNA Annual Symposium by Milton Caplan 2004 September 8.
Leaders in the design, implementation and operation of markets for electricity, gas and water. Portfolio Generation Investment Under Uncertainty Michael.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Rich Paglia Vice President
FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Canada Committed to a Nuclear Future Presented to the 15 th Pacific Basin Nuclear Conference by Milton Caplan President, MZConsulting Inc October.
© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
Making Clean Local Energy Accessible Now December 16, 2013 Flattening the Duck Dynamic Grid Solutions for Integrating Renewables.
© 2008 ICF International. All rights reserved. NYSERDA Much Colder Than Normal Weather Combination Case Results December 2009 Contacts: Kevin R. Petak.
1 July 15, 2007Alcoa Energy Regulatory Affairs NARUC / FERC Demand Response Collaborative Perspectives of a Large End Use Participant of NYISO Programs.
NERC’s Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
North American Energy Standards Board (NAESB) Electric and Gas Industry Coordination in New England: Cold Weather Conditions Houston, Texas February 9,
Energy supply forecast Presentation to Connecticut’s Energy Future Conference by Bridgett Neely, London Economics International LLC December 2, 2004 Hartford,
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
© 2008 ICF International. All rights reserved. NYSERDA Much Colder Than Normal Weather Case Results November 2009 Contacts: Kevin R. Petak (
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Stan Chapman SVP, Marketing & Customer Services Oct 8, 2013.
National Petroleum Council Study Balancing Natural Gas Policy: Fueling the Demands of a Growing Economy September 2003.
George A. Godding, Jr. Director, Management and Communications Office of Market Oversight and Investigations Comments are the speakers and do not necessarily.
Electric Energy Issues and the Region Connecticut Business and Industry Association Stamford, Connecticut December 2, 2004 Kevin Kirby Vice President,
Winter Past, Winter Future Role of LNG in New England Prepared for: New Hampshire Energy Summit Concord, NH October 5, Joe Dalton Director, Government.
New Hampshire Energy Summit Rich Paglia President, Maritimes & Northeast Pipeline Vice President, Marketing New England Pipeline Expansion Update.
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
Reasons for Pursuing DG in Ontario Presented by: Mark Wolnik Markham Energy Corp -Director March 5, 2003.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Aliso Canyon Reliability Briefing to the Porter Ranch Community Advisory Committee Edward Randolph, Energy Division Director, California Public Utilities.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
1 Market Evolution Program Day Ahead Market Project Regulatory Affairs Standing Committee Meeting May 14, 2003.
NOVEMBER 18, 2014 / MILFORD, MA Mark Babula PRINCIPAL ENGINEER – SYSTEM PLANNING Project Update Eastern Interconnection Planning Collaborative’s (EIPC)
Connecting the Dots in New England: NEPOOL’s IMAPP Initiative
Aligning the Gas and Electric Markets: EDF Solutions
Natural Gas Infrastructure Assessment
Affordable Energy Production from Renewable Fuel
Demand Response in the 7th Power Plan
The New England Restructuring Roundtable
Presentation to the MA Electric Restructuring Roundtable
Michael I. Henderson ISO New England Inc.
December 9, 2005 Allison DiGrande, External Affairs Department, ISO/NE
Cold Snap Task Force Update
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
New England Resource Adequacy
New England Gas Overview
Regional Natural Gas Supply & Deliverability
Market Design in New England
Is New England Over-Reliant On Natural Gas?
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Comments on New England Regional State Committee*
New England Roundtable Gas Supply & Electricity Rates in New England
Presentation transcript:

NECPUC SYMPOSIUM Concurrent B Natural Gas Conditions Facing New England Mark R. Babula ISO New England Inc. Supervisor - Power Supply & Reliability June 17, 2002

ISO New England Inc.2 Changing Landscapes In the very near future, the majority of New Englands electric generating fleet will be fueled by a single fuel source - natural gas January ISO-NE publishes its Phase I Gas Study Significant feedback from natural gas sector initiates a need to look further at gas infrastructure proposals February ISO-NE publishes its Phase II Gas Study

June 17, 2002ISO New England Inc.3 What the ISO Gas Studies Were An assessment of New Englands existing and future natural gas pipeline infrastructure (deliverability) An assessment of electric and gas-side contingencies that may impact the operation of merchant generation Additional assessments of: –Pipeline operations under restricted conditions –Distrigas LNG –System restoration of electric power grid

June 17, 2002ISO New England Inc.4 What the ISO Gas Studies Were Not Not an assessment of natural gas supply & storage Not an assessment of natural gas commodity or transportation prices Not an assessment of natural gas prices on New Englands Electric Energy Clearing Prices (ECPs) Not an assessment of LDC operations/contracting issues Not an assessment of electric system resource adequacy or a fuel mix study

June 17, 2002ISO New England Inc.5 ISO-NE Gas Study Findings Gas-fired generation in New England will soar from 16% in 1999 to over 50% by 2004 (high % w/attrition) Insufficient gas pipeline delivery capacity to satisfy the winter peak day coincident demand from both LDCs and the electric power generation sector LDCs will always be served first due to contracting of primary firm transportation rights Deliveries to the electric generation sector is subordinated due to contracting of secondary non-firm transportation rights

June 17, 2002ISO New England Inc.6 ISO-NE Gas Study Findings One mans delivery shortfall is another mans fuel procurement strategy: the so-called generation-at-risk –Winter 2002/03 peak day = 3,100 MW (Reference Case) –Winter 2002/03 peak day = 3,950 MW (High Case) New England has no summer season gas deliverability issues (except for maintenance?) Improved supplies from Maritime Canada will help pipeline companies respond to gas-side contingencies

June 17, 2002ISO New England Inc.7 ISO-NE Gas Studies Findings Increased vaporization capability at Distrigas LNG is targeted for the new Sithe New Mystic plant - Distrigas availability becomes vital until the Boston/NEMA transmission upgrades materialize Additional fuel oil volumes of up to 25% of the regions daily delivery capabilities would be required to meet merchant generators backup fuel requirements in the winter (sustainability issues)

June 17, 2002ISO New England Inc.8 ISO-NE Gas Study - System Restoration NEPOOL System Restoration Working Group Question: What is the impact on New Englands natural gas infrastructure upon partial or full collapse of the bulk electric power grid? Assess impacts on gas-side operations (similar to Y2K) –Compressor stations: gas-fired versus electrical drives –Battery backup capabilities on critical equipment & sustainability issues –Revised system restoration procedures/plan and address black start capability issues

June 17, 2002ISO New England Inc.9 ISO-NE Gas Study Recommendations ISO-NE Should: –Identify merchant fuel transportation contracts –Safeguard choices for designation of operating reserves –Know which generators have on-site compression –Understand back-up fuel capabilities and investigate ability to switch on the fly –Gain access to the gas pipelines electronic bulletin boards for real-time operational data on gas system dynamics

June 17, 2002ISO New England Inc.10 Expanding Horizons - New York Gas Study Spring NYSERDA & NYISO joint venture project to evaluate the operation and interaction of gas & electric systems in New York state - 4 Study Objectives –Objective 1: Better understanding of the potential use of gas for power generation and the pipelines ability to deliver –Objective 2: Develop a model of pipelines serving Northeast & NY to determine lower/upper bounds of gas delivery capability –Objective 3: Examine the operation of the gas & electric systems under various contingencies –Objective 4: Technology transfer

June 17, 2002ISO New England Inc.11 Expanding Horizons - New York Gas Study NY Gas Study Technical Evaluation Panel Members: –Empire State Development –The Energy Association of New York State –New York Gas Group –NY Independent System Operator –NY State Dept of: Environmental Conservation, Public Service, Transportation & NYSERDA Chosen Vendor = Charles River Associates Project completion date - Fall 2002

June 17, 2002ISO New England Inc.12 Expanding Horizons - Multi-Regional Gas Study Multi-Regional Northeast Gas Study: –Encompassing the control areas of NE, NY, PJM & IMO –Steering Committee: ISO-NE, NYISO, PJM, IMO, NERC/NPCC –IMO = Project Manager –RFP issued in Spring 2002 –Vendor evaluation/selection by Steering Committee –Phase I - steady-state modeling of 4 regions –Phase II - multi-area contingency analysis & deliverables Project completion date - Summer 2003

June 17, 2002ISO New England Inc.13 Back to Home - Lets Address the Issues New England Gas Associations Advisory Committee on Power Generation –A new liaison to the electric sector –Committee membership represents companies providing the upstream transportation for nearly 100% of the natural gas consumed within New England ISO-NE is working with the NEGA ADCOM to attain: –Greater mutual education and understanding of both the electric and gas industries –Increased communications –Reliable and efficient operation of the regional energy system

June 17, 2002ISO New England Inc.14