This project is co-financed by the European Union and the Republic of Turkey 1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Bucharest – 18/9/2013. Procurement procedure of the awarding contracts by the Beneficiaries / Partners shall be in compliance with the procedural procurement.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
INDUCTION TRAINING SEIO
Tender Adjudication and Contract Monitoring. Introduction IMPORTANT Each tender is unique. Please ensure to read the tender document carefully.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Marcy Mealy Procurement Specialist CDBG Program
This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY Introduction.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
1 EFCA - 21th March 2002 Raul Mateus Paula. 2 This presentation underlines: The key objectives of the Relex Reform The division of the responsibilities.
PROCEDURES FOR SELECTING THE CONTRACTOR
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
EuropeAid How can a private entity benefit from EC Service Contracts ? Jean-Louis VILLE Head of Unit « Finances, Contracts and Audit » Neighbourhood.
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
2.A. Budgeting and Payment Procedures for All other Types of Contracts
This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel.
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
Training Programme on Procurement for End Recipients
1 PUBLIC PROCUREMENT AND USE OF FIDIC CONTRACTS IN LATVIA Procurement Monitoring Bureau 2013.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
1 PRESENTATION ON TENDERING REQUIREMENTS Presented by Kenya National Highways Authority (KeNHA) Team.
1 Bulgaria – Serbia IPA Cross-border Programme CCI No 2007CB16IPO006 CENTRE FOR EXCHANGE OF INFORMATION ON CROSS-BORDER ECONOMIC COOPERATION "The project.
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
Construction Contracts and Project Delivery Methods
This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
This project is co-financed by the European Union and the Republic of Turkey 1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal.
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
Public Procurement Procedure – Bidding Documents
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
CONSTRUCTION CONTRACTS DOCUEMENTS
This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY Bölgesel Rekabet.
IPA Funds Monitoring and Evaluation December Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
REPORTING, BUDGET, ELIGIBLE COSTS. Main steps of the financial management of the project.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Reporting requirements - contractual and financial issues NGO Kick-off meeting Lorenzina Bruno, Senior Financial Officer Manuel Montero Ramírez, Project.
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
EU - China 11 Guidelines for Applicants rules for applications European Union Delegation to China & Mongolia Beijing Information Session 14 th November.
FIDIC Tendering Procedures
Tender Evaluation and Award Process
Preparation of a tender and tender documents
Content of Tender Dossier - Instructions to Tenderers - Tenders
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Content of Tender Dossier Instructions to Tenderers
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Pre-Contract Phase -
Administration of a FIDIC Contract - Financial Management
Evaluation Grids Evaluation Grids.
Contract Award Procedures
Drafting the Guidelines for applicants
International Open Procedure (1) – PRAG 4.3
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Particular Conditions of Contract & Appendix to Tender
Request for Proposal & Proposal
Management Verifications & Sampling Methods
2012 Annual Call Steps of the evaluation of proposals, role of the experts TEN-T Experts Briefing, March 2013.
Presentation transcript:

This project is co-financed by the European Union and the Republic of Turkey 1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance on Institutional Building for the Implementation of RCOP in Turkey

This project is co-financed by the European Union and the Republic of Turkey 2 Procurement of works IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey 3 Single tender (< or equal to 10,000 Euro) Competitive Negotiated procedure (>10,000Euro < 300,000 Euro) Local open tender (> or equal to 300,000 Euro and < 5,000,000 Euro) International open tender (> 5,000,000 Euro) Budget v/s Procedure IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Single Tender Minimum of one company required Letter of invitation and tender dossier sent Evaluation to follow the procedure for open works tenders 4 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Competitive Negotiated Procedure No procurement notice needs to be published Minimum of three contractors to be consulted Letter of invitation and tender dossier sent A minimum of three technically compliant offers must be received Evaluation to follow the procedure for open works tenders 5 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Local Open Procedure Procurement forecast & notice published only in beneficiary country. EC publishes reference on the Internet with address from which interested companies can obtain further information Tender dossiers either picked up at CA or sent to interested tenderers A fee can be charged to cover the cost of the preparation of the tender dossier Often the tender dossier, particularly the Technical Specifications, will be prepared by an external expert Clarification or site meetings may be foreseen Variant solutions may be taken into account if permitted by the Contracting Authority, and are: Submitted by tenderer with the least expensive compliant offer, and They meet the required technical specifications Bids formally evaluated (minimum of 3 voting members required) 6 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey International Open procedure Procurement forecast & notice to be published on the Internet, in the Official Journal of the European Communities and in the media Tender dossiers either picked up at CA or sent to interested tenderers A fee can be charged to cover the cost of the preparation of the tender dossier Often the tender dossier, particularly the Technical Specifications, will be prepared by an external expert Clarification or site meetings may be foreseen Variant solutions may be taken into account if permitted by the Contracting Authority, and are: o Submitted by tenderer with the least expensive compliant offer, and o They meet the required technical specifications Bids formally evaluated (minimum of 5 voting members required) In exceptional and justified cases, and with the approval of the EC, a restricted tender procedure may be used. 7 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Negotiated Procedure In certain circumstances, and with EC approval, a negotiated procedure may be used, notably:  Where there is an urgency incompatible with the appropriate tendering/contracting timetable  For unforeseen additional works becoming necessary to be carried out by existing contractor  Where such works cannot be separated from main contract  Where such works can be separated but are absolutely necessary  Aggregate cost of contracts awarded for additional works cannot exceed 50% of original contract  Where a tender has been unsuccessful 8 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Works Tender Dossier Volume 1 Section 1 :instructions to tenderers Section 2 :Tender Form and Appendix to the tender Section 3 :tender guarantee form Section 4 :questionnaire Section 5 :Administrative Compliance Grid and Evaluation grid Volume 2 Section 1 :contract form Section 2 :general conditions for works contracts FIDIC Section 3 :particular conditions Section 4 :specimen performance guarantee Section 5 :specimen prefinancing payment guarantee Section 6 :specimen retention guarantee Section 7: tax and customs arrangements Volume 3 Technical specifications Volume 4 Financial Interpretative Note Financial offer lump sum contracts / financial offer unit price contracts Volume 5 Design documents, including drawings 9 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey FIDIC Federation Internationale des Ingenieurs-Conseils 10 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey What is FIDIC? Federation of Consulting Engineers Council Founded in 1913 (Based in Switzerland) Mission is to promote Engineering Expertise and fair procurement Extensive bookshop (cash on delivery) Represents member organisations in 68 countries Web site is 11 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey FIDIC Books 12 Short Form Construction EPC Turnkey Plant and Design Build IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Which Book ? 13 Is it a straightforward and simple project? Is there any risk on design or process? Are the market and the unprecedented risks high? Fixed price – turn key Restricted client contribution High market risks no yes DETAILED EXAMINATION Correct according to Client`s requisitions and then create a modified contract yes no yes no IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey FIDIC Red Book 14 The Client carries out all the engineering services and copes with the risks. The Consultant is responsible for the management and supervision. Checking and supervision of the design and Works, approval of those or rejection are Consultant's responsibilities The Contractor is paid per production and based on unit prices, risk of cost overrun is the risk of the Client. During the implementation of the Works detailed tests are performed. Usually tests are simpler during the Handover Period and Start-up. Disputes are caused are due to unexpected extra Works and increase of Cost. There is usually a cost overrun Consultant works as a daily Arbitrator. IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey FIDIC Yellow Book 15 The Contractor carries out all the detail engineering services. The Contract deals not with "HOW TO DO" but with "WHAT TO DO" The main document is the "Employers Requirements" and explains what performance and quality is expected. The Contractor takes most of the risks including the overrun in quantity and cost. The Client may hold the authority to approve the design. Management and supervision of the contract is carried out by the Consultant. Checking and supervision of the design and Works, approval of those or rejection are Consultant's responsibilities The Contractor is paid on a calendar basis at on some milestones. During the implementation of the Works simpler tests are performed. Usually tests are more complicated during the Handover Period and Start-up. Disputes are caused are due to different interpretation of the "Employer's Requirements" Consultant works as a daily Arbitrator. IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Fundamentals of Works Tender Dossiers Conditions of Contract (CC) – part of the Tender Dossier, respectively of the future contract that are addressing specific issues, required for the contract implementation. General C – are establishing a set of rules, generally valid in all EU financed contracts Special C – are modifying, amending, supplementing the General C, for including in the contract the specificities of a certain country, or of a certain project. 16 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Contract (Agreement) Tender Form with its appendix Particular Conditions of Contract General Conditions of Contract Technical Specifications The design (drawings etc.) BoQs after arithmethical corrections Any other document forming part of the contract Addenda shall have the order of precedence of teh document they are modifying 17 Order of precedence of Contract IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Particular Conditions of Contract  The Particular Conditions take priority over the General Conditions  Are the instrument for the Contracting Authority/ Beneficiary, for introducing the particular aspects of the local legislation, or of the project.  The General Conditions can be applied for any project, anywhere in the world, but will never be able to deal with the specific issues related to a specific project, nor to the legislation of a certain country 18 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey The PC should provide all relevant conditions that relate to the projects and the laws of the contract, which add, complement, or amend the General C In drafting the PC, one must pay particular attention to cross- reference with all other interconnected Clauses that may be affected. Make sure you don’t create ambiguities with other Clauses, or provisions of other documents Major exercise in cross referencing PC with: GC Technical Specifications Schedule/ Annexes (e.g. delivery schedule) 19 Particular Conditions of Contract IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Examples should be only used after verifying they are suitable for your specific case and adapted accordingly The guidance is to assist writers of the special conditions, by giving options for various sub-clauses where appropriate It is recommendable that suitably-qualified engineers (technical staff) to prepare documents and a review by a suitably-qualified legal advisers There is no specific Clause in the General C requiring additional data to be included in the PC, this is done only when and as much as necessary Any modification of existing Clauses, or insertion of a new Clause, must be made for a clear reason and only in conjunction with the other Clauses PC will only contain modified Clauses, without repeating the ones from GC that are not modified 20 Particular Conditions of Contract IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Applicable law and language Contractor’s obligations Performances/ Insurances Timetable/ Schedules Documents/ Drawings/ Specifications/ Manuals Patents and licences Variations of contracted quantities 21 Main aspects to be addressed in PC IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Quality levels Inspection/ Testing at the delivery, Testing after installation Acceptance Payments methods/ schedules Delivery – place, risks, related documents and procedures Warranty/ After-sales services Disputes resolution 22 Main aspects to be addressed in PC IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Bill of Quantities-BoQs The objectives of BoQs are; to provide sufficient information on the quantities of Works to be performed to enable Bids to be prepared efficiently and accurately when a Contract has been entered into, to provide a priced (BOQ) for use in the periodic evaluation of Works executed. In order to attain these objectives, Works should be itemized in the (BOQ) in sufficient detail to distinguish between the different classes of Works, or between Works of the same nature carried out in different locations or in other circumstances which may give rise to different considerations of cost. Consistent with these requirements, the layout and content of the (BOQ) should be as simple and brief as possible. 23 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey The Bill of Quantities should be divided generally into the following sections: a. Preamble; b. Work Items (grouped into parts); c. Daywork Schedule; and d. Summary. 24 Bill of Quantities-BoQs IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey The Preamble should indicate the inclusiveness of the unit prices, and should state the methods of measurement that have been adopted in the preparation of the Bill of Quantities and that are to be used for the measurement of any part of the Works. 25 BoQs Preamble IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey The items in the Bill of Quantities should be grouped into sections to distinguish between those parts of the Works that by nature, location, access, timing, or any other special characteristics may give rise to different methods of construction, phasing of the Works, or considerations of cost. General items common to all parts of the Works may be grouped as a separate section in the Bill of Quantities. When a family of Price Adjustment Formulae are used, they should relate to appropriate sections in the Bill of Quantities. 26 BoQs Work Items IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey The Bill of Quantities usually contains the following part Bills, which have been grouped according to the nature or timing of the work: Bill No. 1-General Items; Bill No. 2-Earthworks; Bill No. 3-Culverts and Bridges; Bill No. 4-etc., as required; Daywork Schedule; and Summary Bill of Quantities. 27 BoQs Work Items IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Daywork Schedule should be included if the probability of unforeseen work, outside the items included in the Bill of Quantities, is relatively high. To facilitate checking by the Employer of the realism of rates quoted by the bidders, the Daywork Schedule should normally comprise: list of the various classes of labor, materials, and Contractor’s Equipment for which basic Daywork rates or prices are to be inserted by the bidder, together with a statement of the conditions under which the Contractor will be paid for work executed on a Daywork basis; a percentage to be entered by the bidder against each basic Daywork Subtotal amount for labor, materials, and Plant representing the Contractor’s profit, overheads, supervision, and other charges. 28 BoQs Daywork schedule IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey The Summary should contain a tabulation of the separate parts of the Bill of Quantities carried forward, with provisional sums for Daywork, for physical (quantity) contingencies, and for price contingencies (upward price adjustment) where applicable. 29 BoQs Summary IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey A general provision for physical contingencies (quantity overruns) may be made by including a provisional sum in the Summary Bill of Quantities. The inclusion of such provisional sums often facilitates budgetary approval by avoiding the need to request periodic supplementary approvals as the future need arise. Where such provisional sums or contingency allowances are used, the Particular Conditions of Contract should state the manner in which they will be used, and under whose authority (usually the Engineer’s but here is the CA) 30 BoQs Provisional Sums IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Sample BoQ Bill 1 31 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Evaluation of Works Evaluations are held in phases: Receipt and registration of tenders Prepatory meeting Tender Opening Session (Public Open) Administrative Compliance Technical Evaluation Financial Evaluation Conclusion 32 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Evaluation Committee 5 members for contract < 5,000,000 Euro 2 non-voting + 3 voting 7 members for contract > 5,000,000 Euro 2 non-voting + 5 voting Reasonable command of English + technical & administrative capacity Impartiality and confidentiality (conflict of interest) 33 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Admin Check – To check tenders are complete and tender guarantee is submitted – EU representatives should be informed (ex-ante) – Opening checklist should be filled – Chairperson has to check the conflict of interest of the Evaluation Committee – Tender opening checklist & report has to be completed Administrative Compliance Grid: Documentation complete as required Nationality of the Tenderer Language Correct Committee may request clarifications within reasonable time Only compliant tenders go on to next phase 34 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Technical Evaluation Done Lot by Lot (if applicable) Be careful about criteria for tenderers tendering for multiple Lots Use the Evaluation Grid in the tender dossier Rules of origin Eligibility of sub-contractors Required Capacity (economic, financial, professional and technical) Only technically compliant offers go on to the next phase 35 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Financial Evaluation Check arithmetical errors Calculate discounts for multiple Lots Contract is awarded to the lowest compliant offer; within the available budget Evaluation of variant solution – only those submitted by the lowest compliant offer Problem of abnormally low offers 36 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Conclution Evaluation Committee recommends to: Award the contract to the tenderer which  complies with administrative and technical requirements  is the lowest offer within the maximum budget available Cancel the procedure 37 IPA Funds Programme Management sept. 2011

This project is co-financed by the European Union and the Republic of Turkey Questions? 38 IPA Funds Programme Management sept. 2011