NCR Interoperability Program NCR Broadband Wireless Network Design August 25, 2005.

Slides:



Advertisements
Similar presentations
1 New Mexico E-911 Network Project New Mexico E-911 Program.
Advertisements

1 © 2009 APQC. ALL RIGHTS RESERVED. Measurement Assessment Tool to Connect Questions to Measures u Based on “Tree Diagram” format u Can start at different.
Proposal / Request For Proposal Proposal / Request For Proposal Initiation Control Planning Close-down Execution.
Terminal Quality Management Overview 2010
Introduction to Integrated Library Systems
Top-Down Network Design Chapter Fourteen Documenting Your Network Design Copyright 2010 Cisco Press & Priscilla Oppenheimer.
Network Design and Implementation
Sharing Our Stories, Improving Our Service, Declaring Our Relevance Reviewing Assessment Data Creating an Assessment Rubric Passonneau & Lewin Northumbria.
Bringing Math Students into the Formative Assessment Equation: Tools and Strategies for the Middle Grades © Education Development Center, Inc. Moving Toward.
2015 FLAP GRANT APPLICATION
Amanda The Development of a Team. Amanda - Background Amanda is a client/server data management application –Houses all land information data –Houses.
IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2004.
MTF Rail Development Forum
Health Informatics Series
December 1, 2011 A presentation by USFpedals.org A project of Environmental Studies students in “Humans & Environmental Change” (ENVA 109) University of.
Documenting Network Design
What is Project Management? How does it affect how you do your job?
Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China April, 2008.
Agenda Teams Responsibilities Timeline Homework and next steps.
EE x12 Technical Reports Writing Lecture 7
What is SMEcollaborate Primarily developed for Small and Medium Companies who wish to collaborate together. It is a:- A resource center for collaborating.
Software Quality Assurance Lecture #2 By: Faraz Ahmed.
Chapter 14 Information System Development
New Tools in an Old Company PMI Honolulu Chapter Meeting June 20, 2007.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Introduction to the Data Exchange Hub (DEH) Project July 15, 2005.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Columbus Custom Carpentry: A Compensation Case Study
VERMONT COMMUNICATIONS (VCOMM) March 2, 2006.
PRESENTATION ON Time and Motion Study BY:- KANIKA SOOD 108K18 AASHI AGARWAL 108K22.
NETE Computer Network Analysis and DesignSlide 1 Documenting Network Design NETE-4635 Computer Network Analysis and Design.
National Capital Region Interoperability Program National Capital Region Interoperability Program (NCRIP) RPWG/ESF Chair Quarterly Report October 31, 2005.
____ __ ____ _____ ____ ______ _____ _____ ____ _____ _____ _____ ____ _____ Click to edit Master text styles Second level Third level Fourth level Fifth.
© 2009 Cisco Systems, Inc. All rights reserved. ROUTE v1.0—1-1 Planning Routing Services Creating an Implementation Plan and Documenting the Implementation.
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
John Maciejewski INPO I am John Maciejewski
Systems Development Life Cycle
NG 911 Committee JULY Committee Members Jason BarbourJohnston County E-911, Board Member Terry BledsoeCatawba County Eric CrammerWilkes Telephone,
California State Lands Commission Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Mineral Resources.
Option for an Enhanced SPP Regional Project Review Process Presentation to the Regional State Committee January 24, 2011 Lisa M. Barton SVP American Electric.
How To Sell Cisco Wireless Networking Fundamentals (WIFUND)
DUNE-LBNF Configuration Management Jeff Dolph, LBNF interim Systems Engineer BNL.
Chapter 12 The Network Development Life Cycle
Managing programs that promote personal effectiveness.
Mobile Broadband Strategy Update RadComms 2014 Chris Hose Executive Manager, Spectrum Planning and Engineering.
Issue 1 - Quarter 1 (2001) Welcome to the first newsletter regarding “MASTS”. You may have heard the name before but basically it is a project to procure.
Sustainability Principles for Land Use and Mobility Approved by City Council – January 2007.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
A Software Engineering Model Based Curriculum Development Approach Leon Pan University of the Fraser Valley.
Project Budget Review _ Control Developed by: Daniel J. Renna 3/16/20161.
Paul Alexander1 DS3 Deliverable Status 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS3 Deliverables Review.
Coquina Coast Seawater Desalination Project TERMS Base Contract TasksBase Contract Tasks – Must be completed – Negotiated and included in the Base Allowance.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Patrick Murray Identifying the Financial Contribution of Funded Projects.
ITEC 275 Computer Networks – Switching, Routing, and WANs
Role of The Software Development Plan (SDP)
Enterprise Wireless Solutions
Systems Design.
Campus Master Plan.
PROGRAM OVERVIEW We have put you into multi-country teams to foster:
Top-Down Network Design Chapter Fourteen Documenting Your Network Design Copyright 2010 Cisco Press & Priscilla Oppenheimer.
Engineering Design Process
SE Tasks for a Concept Development Project
SNMP Usage Recommendations
قاعدة الترتيب الأساسية ( مبدأ العد ) التباديل التوافيق
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
New Plant Configuration Management Development and Implementation Process John Maciejewski INPO June 29, 2009 EN MRM Standardization Model.
Risk Management NDS Forum June 23rd 2010.
Presentation transcript:

NCR Interoperability Program NCR Broadband Wireless Network Design August 25, 2005

NCR Interoperability Program 2 ESF-2 NCR Data Interoperability Program Organization Chart

NCR Interoperability Program 3 Network Design Project Scope Spectrum Assessment –Availability –Cost Technology Assessment –Compare Technologies performance/cost –Recommend Technology/Spectrum Option Network Preliminary Design –Targeted Sites and configuration. Description of Service provided. –Implementation Plan (Schedule, Resources, Cost) –RFP to vendors

NCR Interoperability Program 4 RF Engineering Tool GIS Data Bases –Terrain (DEM) –Land Usage Data (Morphology) –Building Data Location Identification (School, Fire Station) Geo-coded data

NCR Interoperability Program 5 Why..? We need this data to –Correctly predict the network RF performance –Get a true requirement of number of sites –Accurately design and cost the network

NCR Interoperability Program 6 Next Step When can you provide the data? We will provide the details of the format that we would prefer for the data