Merchant / Captive Power Post Electricity Act 2003 By Sh. M.D. Mundhra Malana Power Company Limited LNJ Bhilwara Group 15 th October 2003 CII – PTC Conference.

Slides:



Advertisements
Similar presentations
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Advertisements

Gender Perspectives in Introduction to Tariffs Gender Module #5 ITU Workshops on Sustainability in Telecommunication Through Gender & Social Equality.
TRADABLE PERMITS IN WATERWAY TRANSPORT JIM FAWCETT ECONOMIST GALVESTON DISTRICT.
Public Private Partnership Investment and Construction Armando R. Araujo Cairo 2003.
Competition Effects of the Renewable Energy Policy Reform in Flanders: Is the Flemish market for Green Electricity Certificates working properly? Annemie.
1 Capacity mechanisms - IFIEC position June 12 th 2012.
 As per the Hon’ble Supreme Court Order in WP:562/2009, State of Karnataka has prepared a scheme for allotment of category ‘C’ Mines and has submitted.
O POWER TRADING o OPEN ACCESS o CAPTIVE GENERATION BHANU BHUSHAN Director (Operations ) Power Grid Corporation of India Ltd.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
REC Mechanism: Opportunity for Investment in Wind Power Dr. Govind Bhagwatikar Siemens Limited: Wind Power Renewable Energy 2012 Wind Conference Pune,
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
ARR/TARIFF PROPOSALS OF DISCOMS FOR FY Suggestions/objections by K.Raghu 01/03/2005.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
STRATEGIC VALUE OF GEOTHERMAL ELECTRICITY AND THE IMPACT OF ITS PRICING Anang Yahmadi PT PLN (Persero) – Directorate of Construction and New/Renewable.
The Brazilian Energy Market ANEEL/FERC/MoPSC/UtahPSC Workshop Brasília, August 9 th, 2005 ANEEL/FERC/MoPSC/UtahPSC Workshop Brasília, August 9 th, 2005.
Regional Transmission Organizations: The Future of Transmission? Dave Edwards 4/17/2004.
Dr. Yüksel MALKOÇ TWEA Vice President. Turkey’s current financial outlook, Demand growth and supply development, Wind potential and capacity development,
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Organization of the electricity supply industry © 2012 D. Kirschen & University of Washington 0.
RENEWABLE ENERGY HAS BEACHED IN BARBADOS INTEGRATING A HIGH SHARE OF RENEWABLE GENERATION IN THE BARBADOS GRID WILLIAM HINDS CHIEF ENERGY CONSERVATION.
Incentive Regulation Topics Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
Load shedding in Pakistan Reasons & Remedies February 9, 2009 By Muhammad Ziauddin.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Electricity Reforms in Bangladesh
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 9 Renewable Energy Module 9: REGULATORY MEASURES AND POLICY OPTIONS TO ENCOURAGE DEVELOPMENT.
 Energy Conclave 2006 Energy and Sustainable Development July 2006.
Comparative Legal and Regulatory Framework of Nepal and India relating to Hydropower Development Advocate Amar Jibi Ghimire.
ENERGY MIX IN SENEGAL WHICH ONE TO CHOOSE? General Directorate APUA CONGRESS. LUANDA 2014 Safiétou DIALLO Technical Adviser.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
CHITALE & CHITALE PARTNERS 1 POLICY FRAMEWORK FOR TRANSMISSION & DISTRIBUTION IN POWER SECTOR ADVOCATES & LEGAL CONSULTANTS ONGCONGC.
The Future of Energy Markets in India: Structure and its Regulation Anoop Singh Dept. of Industrial and Management Engineering, Indian Institute of Technology.
Commercial Matters Dublin Waste to Energy Project.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
CAPTIVE POWER POLICY. Section 44 of the Electricity(Supply) Act, 1948 gave birth to Captive Generation.  Any other person to establish or to acquire.
Philip Lloyd, CPUT Rob Jeffrey, Econometrix.  Eskom must grow if our economy is to grow  Many decisions about Eskom’s operations in recent years have.
Weyerhaeuser CHP Project NWPPC CHP Roundtable June 24, 2003.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Competition in the Indian electricity sector The experience so far Shahid Hasan Fellow, Energy Reforms Group The Energy and Resources Institute New Delhi,
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
1 A Presentation on Regulatory Regime for Renewable Energy Projects in Andhra Pradesh.
Opportunities for Competitive Energy Services IEA DSM Task XVI Experts Meeting, Deventer, Netherland, 8-9 October, 2007 Abhishek Nath Bureau of Energy.
MERIT ORDER OPERATION AND GRID DISCIPLINE S.P.KUMAR MANAGER(IT), SRLDC,BANGALORE.
Power Trading The Indian electricity sector has grown manifold since independence making India the third largest producer of electricity in Asia. The installed.
Electricity Regulatory Commissions in India: Resources, Transparency and Public Participation Shantanu Dixit Prayas, Pune, India
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
BritNed Investing in interconnection capacity Damian Bach France-UK-Ireland Stakeholder Group meeting 4 th July 2008, Sellindge, Kent.
Industrial Policy Faculty – Lovely School Of Business LPU.
Third-Party Solar Financing Options in New Hampshire 1.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Electricity pricing Tariffs.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
Discussion on Multi Year Tariff By Vivek Sharma & Manisha Kabra.
MINEM – April Undersecretariat of Renewable Energy Ministry of Energy and Mines - MINEM Republic of Argentina RENEWABLE ENERGY IN ARGENTINA New Regulatory.
Electricity Power Market: Competitive and Non-competitive Markets Ito Diejomaoh.
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
STATE ENERGY REGULATORY COMMISSION (SERC) Prof. Konstantin Shushulov Chairman Budapest, Hungary May 19, th Annual Meeting of the Energy Regulators.
Prism Cement Ltd. ….Niche focused play. Investment rationale Prism is a niche player in central / north region where strong demand is witnessed Operates.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Electricity & Regulatory Overview of Korea
Damitha Kumarasinghe Director General
EU’s CO2 Emissions Trading Scheme – Benchmarks for Free Allocation from 2013 Onwards 9 September 2010 Hans Bergman DG Climate Action European Commission.
Financing of Solar power plants
Long-term Capacity Market
Presentation transcript:

Merchant / Captive Power Post Electricity Act 2003 By Sh. M.D. Mundhra Malana Power Company Limited LNJ Bhilwara Group 15 th October 2003 CII – PTC Conference on “The Power Market Post Electricity Act 2003: Entities, Business Models and Implications”.

15th October LNJ Bhilwara Group in Power LNJ Bhilwara Group is a Rs Cr. diversified Group. The Group has both Captive Power Plants and Merchant Power Plants. Captive Power Capacity 15 MW Tawa HEP in MP – Captive for HEG. (For Graphite Electrode) 13 MW WHRS in CG - Captive for HEG. (For Sponge Iron) 25 MW Coal based in MP – Captive for HEG. (Under development) (Graphite Electrode Expansion) 33 MW DG Sets in Raj, MP - Captive for Textile Mills

15th October LNJ Bhilwara Group – Pioneers of Merchant Power Plants in India Merchant Power Plants 86 MW Malana HEP – India’s first and only operating Merchant Power Plant. Completed in record time of 30 months At a cost of Rs. 3.8 Crs. / MW. 192 MW Allain Duhangan HEP Also being developed as a Merchant Power Plant. Expected to be on stream by , well ahead of schedule.

15th October Merchant Power Plants – Generation Except Hydro – other modes of generation delicensed. For Hydro, CEA approval is required above a certain level. We suggest this limit to be Rs Crores (for 500 MW). The Act has increased Scope for merchant power plants without long term PPA. But, allotment of Hydro Projects in any case is required. Various forms of Competitive bidding based on ‘Royalty’, ‘Upfront Premium’, ‘Rate of Power’ have practically failed. Unsuitable for Hydro Projects as they are extremely ‘Location Specific’ and have Hydrology and Geology inherent risks. As a result, now allotment of Hydro Projects to the Private sector is practically at a standstill.

15th October Suggested procedure for Allotment of Hydro Power Projects (1) Time is Key in Hydro Power for developer, state and Nation. 1 year of early commissioning of 100 MW Hydro Project means Rs. 12 Crs of additional Royalty for royalty. Therefore, ‘Completion Time’ should be the criteria for allotment of Hydro Power Projects to the private sector. Developers to be shortlisted based on their technical, financial, managerial capability and past track record. They should be given 1 year for vetting Feasibility Reports (for good projects) or DPRs (if they are available). They should then Bid for ‘Time for completion of Project’. Developer with lowest time for completion to be awarded the project with set of incentives / disincentives.

15th October Suggested procedure for Allotment of Hydro Power Projects (2) Scheme of Incentives and Disincentives Project lease period – 40 years from quoted CoD. Incentive – 50% royalty waiver for early commissioning. Disincentive for delay – Penalty of 2.5% of annual design Rs. 2 per kWh (supported by bank guarantee). Allow Force Majeure and 1 year grace period. State to take over for delays > 2 yrs from agreed milestones.

15th October Merchant Power Plants – Selling Options Directly to Industrial Consumers Subject to payment of surcharge - No Regulator’s approval required. To Discoms w/o surcharge – Needs Regulator’s approval To Traders for further sales to Discoms or consumers Merchant Power Plants - Sales

15th October How to encourage Direct Sale to Industrial Consumers? Indal’s Kochi unit got closed despite offer of Rs / kWh from PTC at Kerala Inter-state Point, due to excessive ‘Surcharge’ (42 paise) and intra-state wheeling charge (35 paise) and Transmission losses charged by KSEB. Therefore To promote Direct Sale to Industrial Consumers: Surcharge must be eliminated within 5 years. Within these 5 yrs. – Surcharge to be capped at 50% of the difference between: Existing Tariff, Tariff negotiated between consumers and generators plus all wheeling charges. Unless the above is implemented, Third Party Sales will not see the ‘Light of the day’. Without the above, Merchant Power Plants will be difficult proposition.

15th October Surcharge and Captive Power Plants Industries have two options for meeting their requirements of power: To put captive power plant – with no surcharge. This would normally not allow economies of scale. To buy power from Merchant Power Plants at market rates: But decision to set up a captive power plant or go in for PPA with Merchant Power Plant, will be difficult without knowing the amount of Surcharge and definitive time frame for its elimination and as a result: Investments made in haste in captive power plants may go waste, Some states like AP, Karnataka are introducing taxes on captive generation. This would further complicate the decision making process. In fact in most countries, industries get power at subsidized rates. So keeping surcharge will make industries uncompetitive.

15th October Merchant Power Plant – Sale to Discoms (1) Tariff to be approved by Regulators. Various Discussion Papers floated indicate retaining the ‘Cost-Plus’ Pricing system. Cost- Plus pricing rewards inefficiency. To reward efficiency, instead of deciding cost project-wise, we suggest a band of power prices to be announced annually by the Regulators: Minimum Price to be based on optimum costing in a particular sector.

15th October Merchant Power Plant – Sale to Discoms (2) Maximum Price to be based on actual cost of projects completed during last 3 years. This should include: RoE during construction period for power projects. (Otherwise for a typical Hydel Project having 6 years construction period, 16 % RoE will translate to only 9 % ROE). Regulators approval should be required if price does not fall in this band of prices. The above will increase availability and subsequently market forces will take over.This will give boost to efficient entrepreneurs to put up merchant power plants.

15th October Merchant Power Plants and Trading Merchant power Plants will also get a boost by promotion of Trading. For facilitating more Players in the market, we suggest: Licensing fee not greater than Rs Lacs per annum. Single Trading license for the entire country – Trading licenses not to be restricted to geographical areas. No Trading license for Generators as they are already familiar with nuances of Selling / Trading of Power. This will allow merchant power plants to supply directly to consumers by meeting their seasonal demands by Trading.

15th October Under supply / Over supply of power Some mechanism needed to price the over supply/under supply. ABT in its present form – ineffective as it was originally not meant to be a rate mechanism, because even at most desirable Frequency of 50 Hz, rate is Rs. 1.4 / kWh. This has resulted in conversion of scheduled demand into unscheduled demand. Needs revision to ensure proper pricing of unscheduled generation / consumption. We propose the following rates for unscheduled power: NowSuggested At 50.5 Hz Frequency: Rs / kWh Rs / kWh At 50.0 Hz Frequency: Rs / kWh Rs / kWh At 49.0 Hz Frequency: Rs / kWh Rs / kWh A Chart is depicted in the following slide.

15th October Chart showing present and suggested rates at different Grid Frequencies

15th October Merits of the proposed mechanism This will make banking easier. Captive Power stations can supply excess generation to the grid or draw during shortages. This unscheduled interchange can be treated as per the proposed Frequency based price mechanism. Traders can also benefit from this mechanism for shortfall / oversupply of power. This will also help in continuous supply of power to consumers. They can buy their scheduled requirements through PPAs and for additional requirements, they can use this mechanism.

15th October Captive Power – Other Issues Captive Power definition is broad and if followed, could be a key driver of growth. Possibility of varying interpretation by Legal / Regulatory Authorities. National Electricity Policy should remove all ambiguities in its interpretation. 5% equity investment of a consumer in a generating company should entitle him for captive benefit. One IPP can be a Captive for more than one industrial consumer. If the above is implemented, this could result in fruitful joint investments in power sector by IPPs and consumers to take advantage of Economies of Scale.

15th October THANK YOU