Electric Transmission Planning Local Area Planning Update Presentation to TRANSAC January 24, 2013.

Slides:



Advertisements
Similar presentations
Industry Brainstorm on increasing Export Capacity From Alberta to B.C. January, 2006.
Advertisements

Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Goshen Area Bus Reconfiguration
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
1 Local Area Planning Update to TRANSAC – December 16, 2014.
Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
California Energy Commission Workshop Nuclear Power Plant Issues
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
1 Local Area Planning Update to TRANSAC – September 18, 2014.
Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
Rocky Mountain Area Transmission Study RMATS Economics Reference Cases Economic Comparisons Distribution of Economic Gains and Losses RMATS Steering Committee.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
2013 Alternative Transmission Development Robert H. Easton March 17, 2004 RMATS Stakeholder Meeting.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
1 Local Area Planning Update to TRANSAC – March 11, 2015.
1 Local Area Planning Update to TRANSAC – Sept 16, 2015 Mitigation Update, Uncertainty Scenarios, VAR Margin Study.
Gaelectric North America Northwest Power and Conservation Council Missoula Meeting January 12, 2011.
VRT Study Update José Conto ERCOT System Planning.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC May 6, 2004 Transmission Services Ken Donohoo, Manager of System Planning Dan Woodfin,
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
Freeport Area Master Plan Project -
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
Local Area Planning Update to TRANSAC – December 21, 2016
Local Area Planning Update to TRANSAC – September 15, 2016
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Local Area Planning Update to TRANSAC – June 29, 2017
Local Area Planning Update to TRANSAC – March 15, 2017
Local Area Planning Update – TRANSAC
Local Area Planning Update to TRANSAC – September 26, 2018
Review of Distribution Network Protection
TONBRIDGE POWER GREEN LINE
Balancing Authority Area Transmission Service Cost Estimates
Presentation transcript:

Electric Transmission Planning Local Area Planning Update Presentation to TRANSAC January 24, 2013

Electric Transmission Planning2 Previously Reported Contingency Updates State of the System Update  Loss of the Burke A or B 115 kV lines overloads the remaining Burke line. Reconductoring is currently in process and scheduled to be finished Fall Note, this project was completed in 2012, and the lines are now fully rated to match NWE line ratings in Montana.  Mill Creek 161 kV bus outage presents low voltage, overloads and widespread outage risks to the Butte/Helena/Bozeman areas. Mitigation is planned for Note, mitigation for this problem was partially completed in late 2012 with the addition of the South Butte 230/161 kV auto transformer addition. Full mitigation now planned for completion in 2014.

Electric Transmission Planning3 Other Previously reported Category C events include:  Loss of portions of Billings Steam Plant 230kV bus may cause minor overloads on the Broadview-Alkali Creek 230 kV line or the Rimrock 161 kV phase shifter in the Billings area. These overloads can be easily mitigated with phase shifter adjustment.  A loss of the East Gallatin 161 kV bus puts Bozeman at risk and could result in significant loss of the Bozeman 50 kV system due to another transformer overload, and resulting cascades. State of the System Update N-2 Study Results are Completed for 2012 & 2013 models.

Electric Transmission Planning4 Additional 2012 N-2 (Category C) Outage Results State of the System Update  Loss of the Mill Creek 100 kV Bus could overload the Anaconda and Drummond 100/50 kV autobanks. Mitigation is already planned (convert the Anaconda – Drummond 50 kV line to 100 kV).  The Colstrip – Sarpy Auto 115 kV line can overload for certain double contingency outages. The line rating is now limited by in-line wave traps; planned communications upgrades mitigates the problem.  The Hardin – Crossover 230 kV line can overload for certain double contingency outages. This line is de- rated due to ratings on WAPA owned CT’s at Crossover; mitigation discussions underway.  Loss of the Ennis 161 kV bus can create voltage and thermal problems in the Big Sky area. Mitigation is underway.

Electric Transmission Planning5 Additional 2012 N-2 (Category C) Outage Results State of the System Update  Loss of the Missoula 4 – Hamilton Heights 161 kV transmission lines (common corridor) could cause segments of the Missoula 4 – Hamilton 69 kV A and B lines to overload. Mitigation is planned.  Loss of the Highwood – Judith Gap South 230 kV line in conjunction with the Rainbow – Stanford 100 kV line may result in low voltage in the Stanford area 69 kV system.  Loss of the Harlowton or Glengarry 100 kV buses results in low voltage in the local 50 kV systems.  Loss of the Canyon Ferry 100 kV lines from Great Falls to Helena may overload the Holter – Helena Valley 100 kV line. Voltages in the Helena area approach minimums.

Electric Transmission Planning6 Summary Results Cases: Thermal Issues Analysis of Future Cases  No thermal overloads were observed under normal system conditions.  Shutdown of Corette generating plant in 2015 would accelerate the need for additional system upgrades in the Billings area. Several contingencies in the Billings area heavily load the Billings Steamplant 230/100 kV autobanks, with overloads appearing in the ten year planning horizon. Another 230/100 kV autobank tie in the area will be needed.  The Baseline – Meridian 100 kV line may overload under contingency conditions within the five year planning horizon.  The Three Rivers 161/100 kV auto bank could overload for loss of the Three Rivers – Jackrabbit 161 kV line or other Category C contingencies within the ten year planning horizon.

Electric Transmission Planning7 Summary Results Cases: Thermal Issues Analysis of Future Cases  Several outages may overload the Trident Auto 100/50 kV transformer within the five year planning horizon. Mitigation plans are already under consideration.  Loss of the Mill Creek – South Butte 230 kV line in conjunction with either Mill Creek – ASIMI 161 kV lines may overload the remaining Mill Creek – ASIMI 161 kV line due to a current limited device within the five year planning horizon. Will be mitigated with rebuild of the Mill Creek 161 kV bus.  Loss of the Rattlesnake 100 kV bus may overload the Missoula 1 – Reserve St 100 kV line and heavily load the Reserve St and Missoula 4 161/100 kV auto banks within the 5 – 10 year planning horizon. Mitigation is planned.  No new thermal problems were observed in the Missoula, Helena, or Great Falls areas.

Electric Transmission Planning8 Summary Results Cases: Voltage Issues Analysis of Future Cases  Under normal system conditions, minor voltage problems were observed on certain area 50 and 69 kV systems, easily mitigated with tap changes or capacitors. No problems observed on BES elements.  Loss of the Painted Robe – Roundup 100 kV line may result in minor low voltage problems in the area 50 and 69 kV systems within the five year planning horizon.  Loss of the Highwood – Judith Gap South 230 kV line may result in minor low voltage problems in the Lewistown area 50 kV system.  Loss of the Broadview – Roundup 100 kV line may result in minor low voltage problems in the area 50 and 69 kV systems within the 15 year planning horizon.

Electric Transmission Planning9 Summary Results Cases: Voltage Issues Analysis of Future Cases  Loss of a Missoula 4 – Hamilton Heights 161 kV line may result in minor low voltage problems on the Hamilton area 69 kV A line within the 15 year planning horizon. Mitigation is planned.  Loss of the Shorey Road – Columbus Rapelje 230 kV line may result in minor low voltage problems in the Columbus area within the 15 year planning horizon. Mitigation is planned.  Loss of the Broadview 100 kV bus may result in low voltages on the Roundup area 50 and 69 kV systems within the five year planning horizon.  Loss of the Garrison 230 kV bus may result in widespread marginal to low voltages in Butte, Helena, and Bozeman areas in the 10 – 15 year planning horizon. This situation improved with loss of large industrial load in the Missoula area.

Electric Transmission Planning10 Summary Results Cases: Voltage Issues Analysis of Future Cases  Loss of the Laurel – Bridger 100 kV A and B lines results in low voltage in the Bridger area within the five year planning horizon.  Loss of the Judith Gap 100 kV bus may result in low voltages in the Benchland area 100 kV system within the five year planning horizon.

Electric Transmission Planning11 Stability Issues Analysis of Future Cases Stability (Dynamics) runs have not yet been performed on the base cases. These runs should be completed later this year. No major problems are anticipated.

Electric Transmission Planning12 Next St eps Verify New Problems Found. Prioritize Problems using Decision Rules Begin or Continue Mitigation Studies

Electric Transmission Planning13 Local Area Planning Update Questions?