Tomasz Ladzinski, Didier Vaxelaire. Current Access Configuration 18/06/2015T.Ladzinski GS/ASE2.

Slides:



Advertisements
Similar presentations
Barriers for Access to Accelerator Enclosures Barriers for Rigging the Westinghouse Rotor and Stator Photo of the Week E. Lessard Collider-Accelerator.
Advertisements

Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
14 June 2007VELOEddy Jans 0 Recent VELO-installation++ activities June 14, 2007 Potmeter calibration Bake-out Cabling & Commissioning.
Arc-Killer SV-25 – DF-2 + Range Arc-Killer SV-25 - DF-2 + Range.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
August 4, 2009Radiation Safety Committee Operational Radiation Safety Program for the NEH A.A. Prinz, J.C. Liu and J. Vollaire.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
Thomas Baron - IT Gregory Godineau - GS Conference rooms service Issues with physical keys Requirements Solution Pilot and Deployment Alternatives.
TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
Primary Ion Beams in the North Area: Design of the Safety Interlock Information for SPS-OP 14/2/2014 D.Manglunki presenting the work of T. Hakulinen, F.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
TS Workshop, Archamps 4 May 2004 SAFETY AND ACCESS CONTROL Where do we stand ? P. Ninin & the Access project team TS/CSE,
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
Stéphane Gabourin on behalf of TE/MPE-EP MPP Linac4 – 9 th July 2015 BIS installation in Linac4 For 50 MeV operation.
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
Lock change and lock box photo requirements All rights to this document are reserved by North Georgia Services. Following this procedure will ensure that.
Extraction and beamline progress B.Goddard TE/ABT.
TE-MPE-TM 27/06/2012, TE-MPE-MS section SPS RENOVATION Final design and status 1 R.Mompo, P.Dahlen, Y.Bastian, I.Romera, M.Zerlauth.
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
SPS YETS 2015/2016 Planning meeting (No.3) 07/10/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Muon Department Meeting Jerry Annala Staged Commissioning of Muon Campus 17 December 2015.
HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
SPS Personnel Protection System Renovation Project
BE-ICS activities for LIU Project
SPS LS1 Planning meeting (N019) 04/09/13
Beam Interlock System SPS CIBU Connection Review
BE-ICS Activities during the LS2 Period (15 min)
CENF – Personnel Protection System Preliminary Study
CENF – Personnel Protection System Preliminary Study
Endcap shielding senarios:
BE-ICS activities for LIU Project
EN-HE SPS works during EYETS
SPS EN-CV Planning LS (initial draft)
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
EN-HE L2 – PS – PSB – TT2 works during YETS
TE-MSC activities in SPS during YETS
Status with crucial LSS5 kicker transmission line cables
YETS 2017 TE-CRG-OP overview of tasks to perform during the first month _GF YETS2017_CRG-OP.
BE-ICS work for SPS Safety Systems
Linac 4 Devices Controls and Monitoring Status
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Remote Handling Workshop Introduction

BRAN: LS2-plans TREX M. Palm, E. Bravin, BE-BI-PM.
BA6. BA6 Sprinkler Station Structure Sprinkler Station Structure The metal sheet has been added for being able to install the.
SPS Injection BIS - Draft requirements

Presentation transcript:

Tomasz Ladzinski, Didier Vaxelaire

Current Access Configuration 18/06/2015T.Ladzinski GS/ASE2

Foreseen Changes if access to ECA5 possible with beam circulating in the SPS ring (RP OK) 2016/17: Identify all doors separating ECA5 from ECX5: pull cables and add extra instrumentation to acquire signals interlock in Chain 1 by the BA5 PLC & CL these doors shall be considered end-of-zone (only for evacuation) Remove the ECA5 PLC & CL from the interlock Chain 1 Keep the door YDPZ01.LIFT with existing mechanical lock or install SUSY badge reader (?) 2017/18: Install a non-interlocked access point in front of the lift -> pilot installation for the LS2 PPS works else 2016/17: no modifications planned 2017/18: install a non-interlocked access point in front of the lift -> pilot installation for the LS2 PPS works LS2: Move the interlock barrier to the new access point 18/06/2015T.Ladzinski GS/ASE3