Earth Day Award Nomination ConocoPhillips Reese Canyon Drill Site Grand Staircase-Escalante National Monument.

Slides:



Advertisements
Similar presentations
Part 3 Land and Water Use. RANGELANDS Uncultivated land dominated by native plants: grasses, grass-like plants, or shrubs. All land that is not farmland,
Advertisements

Wetland restoration after a mega-storm Jyneen Thatcher, Wetland Scientist Washington Conservation District Paul Bockenstedt, Ecologist Stantec.
Management of cheatgrass fuel loading in the shrub-steppe Steven O. Link, PhD (Botany) Native Plant Landscaping and Restoration LLC 4604 E. Robin Ct. West.
Waterfall Fire Interpretive Trail: Science, Community, and K-12 outreach guide Western Nevada College Desert Research Institute NSF-EPSCoR Climate Change.
At the Jewett Lignite Mine. the re-establishment of the stream system that existed prior to disturbance… the re-establishment of the stream system that.
MINING. Overview StepsDescriptionEnvironmental Effects MiningRemoving mineral resources from the ground Mine wastes – acids and toxins Displacement of.
Native Habitat Restoration In The Lower Rio Grande Valley, Texas Anthony D. Falk *Masters candidate, Texas A&M University Kingsville, Caesar Kleberg Wildlife.
Work Breakdown Structure.
Jordan – Vickery Walkway TJ MedlockNeil Wilson. Existing site background Once was lively and stable Drought and financial issues Surround trees providing.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Environmental Plantings This presentation is an overview of Environmental Plantings and the Reforestation Modelling Tool Source: Department of Industry,
Lignite Mining and Reclamation Process Joe Friedlander The Coteau Properties Co.
Final Reclamation Part 5 U.S. Department of the Interior Bureau of Land Management May 2006.
FIVE CREEKS RANGELAND RESTORATION PROJECT FALL 2008 Burns District, BLM.
Modeling Ecological and Economic Benefits of Post-Fire Revegetation in the Great Basin Becky Niell.
Some Major Problems In Managing Watersheds Of The Border Region Dr. M. Karl Wood, Director Water Resources Research Institute New Mexico State University.
Watersheds and Fire Where conditions are not too dry or too wet and where accumulated carbon from photosynthesis will not oxidize slowly or rot, fire cycles.
Chapter 29 Landscaping.
U. S. Department of the Interior Bureau of Land Management Division of Fluid Minerals, 1.
Kern River Natural Gas Line Expansion: A Case Study in Overcoming Adversity on a Mountainous Lineal Reclamation Project David Chenoweth, Joe Schneider.
Prosperity Through Unity Research Project Healing the Land – An Elders Prospective.
Determining Reference Conditions for Southwestern Ponderosa Pine Forests.
CFLRP MONITORING Pike & San Isabel National Forests & Cimarron & Comanche National Grasslands 2013 FIELD TRIP September 13, 2013 Front Range Round Table.
Maintaining Your Rain Garden. You can do better than this!
AirTAP Fall Forum 2014 Airside Vegetation Strategies.
The Uncompahgre Partnership Healthy Lands for Healthy Communities.
Seed Production & Inventory Adventures Grand Junction, CO Colorado Plateau Native Plant Program.
EVALUATION TOPIC Coal Exploration Sites – Offsite Impacts and Reclamation Success.
Tree invasion on reclaimed anthracite surface mines in Pennsylvania: Reevaluating inhibition Klemow, K.M., R. Klemish, M. Petras, R. Ali, J. Keller, R.
SCEK Fund Forum Reclamation & Impact Management.
Best Management Practice Information Sheets Updated: August 30, 2004 Contact: U.S. Department of the Interior Bureau.
Limitations to post-fire seedling establishment Jeremy James and Tony Svejcar.
Walker River Basin Project Agriculture, Restoration, and Plant/Soil/Water Interactions Tasks 4 & 5 Summary2008.
Horsley Witten Group, Inc. Public Workshop Vegetation Management and Maintenance January 19, 2011 Rhode Island Stormwater Design and Installation Standards.
Authors - Kim Goodwin, Project Specialist Roger Sheley, Associate Professor Janet Clark, Director, Center for Invasive Plant Management Department Editor.
On – Site Training Overview LAND USE PLANNING FOR PRIORITY SPECIES AND VEGETATION March 11, 2010.
MO’OMOMI NATIVE PLANTS U.S. Fish and Wildlife Service Pacific American Foundation Hui Malama o Mo’omomi.
PIPELINE RECLAMATION REQUIREMENTS Interim reclamation: Achieve healthy biologically active topsoil, control erosion, and restore habitat. Final reclamation:
Look at the following pictures and think about things that must be considered Pre Harvesting of Trees and Post Harvesting of Trees.
 Invasive Species ◦ Autumn Olive (Eleagnus umbellata)  Monoculture ◦ Loss of Biodiversity ◦ Loss of Habitat  Choking out local growth.
Earth Day Award Nomination by Utah School and Institutional Trust Lands Administration and the Division of Wildlife Resources.
ECOLOGICAL SUCCESSION New Beginnings. Bellringer  How does bare rock become a dense forest?
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
George Peacock, Team Leader Grazing Lands Technology Development Team Central National Technology Support Center 2010 Southern Regional Cooperative Soil.
Nonfarm Erosion Control
2016 Project Implementation, Maintenance, & Monitoring Daniel Oppenheimer Tamarisk Coalition.
Grand Canyon National Park U.S. Department of the Interior National Park Service Inner Canyon Vegetation Program What do we do? Monitor and remove exotic.
Land Stewardship Program 10 Year Strategic Plan. Manages District natural areas, protect lands and mitigation banks through: Enhancement Enhancement Restoration.
Natural Tree Regeneration after Wildfire in Oregon: Pros and Cons Presented by: Tara Jennings.
Introduction to BMPs U.S. Department of the Interior Bureau of Land Management May 2006.
Recreating the eucalypt regeneration niche in degraded bush remnants in production landscapes Tanya Bailey PhD candidate School of Plant Science UTAS Supervisors:Dr.
Forests & Forestry Unit FIRE!!!. Objectives Explain the purpose of prescribed fire Describe the different types of forest fires Identify sources of forest.
Where Have All the Prairies Gone? Survey of Texas Prairies: Phase II.
SAGE GROUSE INITIATIVE OREGON IMPLEMENTATION STRATEGY USDA – NRCS – Oregon.
USING STEWARDSHIP AUTHORITY TO ADVANCE RESTORATION Mae Lee Hafer Regional Stewardship Coordinator Collaborative Restoration.
1 Earth Day Award Presentation Utah Division of Wildlife Resources & ConocoPhillips Pinyon-Juniper Treatment Project.
Matt Rinella, USDA-Agricultural Research Service, Miles City, Montana and Erin Espeland, USDA-Agricultural Research Service, Sidney, Montana Long-Term.
MASON GULCH LANDSCAPE MANAGEMENT PLAN PUBLIC MEETING August 4, 2016.
Vegetable Crop Production
Mason Gulch landscape Management plan Public meeting
Management of cheatgrass fuel loading in the shrub-steppe
Pollinator Protection in Region 4
The Gila River Restoration at Apache Grove
Lawn Establishment and Care
Prairie Restorations, Inc.
Fire in Juniper Invaded Sagebrush Steppe
how do I know when I’m done?
2018 Excellence in reclamation award
Vocabulary Chapter 4: Lesson 1
Rehabilitation on North Stradbroke Island
Presentation transcript:

Earth Day Award Nomination ConocoPhillips Reese Canyon Drill Site Grand Staircase-Escalante National Monument

Project History Overview  Exploration well drilled in 1997 when site was under State ownership  State accepted original reclamation efforts  Land ownership was transferred to Grand Staircase-Escalante National Monument in 1999  ConocoPhillips continued reclamation of the five acre site by seeding in 2002, monitoring in 2003, and replanting in 2004.

Location information  45 miles southeast of Escalante, UT  Located in remote area of the Kaiparowits Plateau  Area contains network of canyons with steep slopes and sandstone ledges  Surrounding vegetation is pinyon- juniper interspersed with sagebrush shrubland

Reese Canyon Setting

Original Reclamation Efforts – Phase 1 Site was regraded and seeded in 1997 with limited success Native, BLM approved seed mix was used Dark soils and south facing slopes presented challenges to restoration of the site

Phase 2 Reclamation  Maxim Technologies contracted in 2002 to reseed site with mix of native shrubs, forbs, and grasses  Site was mulched for moisture retention  Baseline vegetation studies implemented to track project success  Moderate success due to drought conditions

Phase 2 Reclamation

Phase 2 Reclamation – Vegetation Studies

Phase 3 Reclamation  ATC Associates contracted in 2004 to conduct further reclamation  Continued vegetation monitoring  Innovative strategies such as pocket planting implemented  Small and large woody debris added to site to retain soil moisture and slow erosion

Phase 3 Reclamation – Pocket Plantings Pocket plantings

Phase 3 Reclamation – Palmer penstemon

Phase 3 Reclamation

Phase 4 Reclamation – 2005 Activities  ConocoPhillips/ATC Associates will conduct a reconnaissance trip this spring to determine extent of any erosion  Erosion control structures will be implemented as needed  Russian thistle seedlings will be removed  Annual vegetation monitoring data will be collected

Award Justification  Continued commitment to reclamation of site regardless of state approval  Use of innovative techniques to achieve reclamation success  Establishment and seed production of native species on a site with poor growing conditions