1 If you are reading this, then you are successfully seeing the webinar video. Audio will be through the conference call phone line.

Slides:



Advertisements
Similar presentations
The Touchpad control panel …all equipment is controlled from here touch it with your finger to start laptop connectors: display, sound, network.
Advertisements

Agnes Varis Campus Center Auditorium Audio Visual Training.
Wave IIIb Program Officer Chat Today’s webinar will begin at 3 p.m. ET. You can participate and ask questions in two ways: Online: Receive audio through.
Pneumatic Road Tube Counters Version 3.0
1 Low Volume Road Traffic Counts Toggle Fullscreen mode with this button above For audio, call conference line: For.
1 Quality Assurance Boards Toggle Fullscreen mode with this button above Audio also available via phone: For assistance,
THE NEW FSA Florida Standards Assessment Dr. Karen Schafer Brevard Public Schools July, 2014.
The Greener Side of FDOE: What We’re Doing For You! 62 nd Annual FAPT Summer Conference Naples Beach Hotel and Golf Club, Naples, FL. July 5-9, 2009 Presented.
IA-DMM Measures and Results for Year 1. Cohort 1 as of 6/23.
Preventing Nonpoint Source Pollution
LTAP Advisory Committee September 19-20, 2007 Williamsport Lou Ferretti Stacey Cleary.
1 Toggle Fullscreen mode with this button above Audio also available via phone: For assistance, call: If.
STUDENT ASSISTANCE LIAISON ONLINE QUARTERLY REPORTING Guidance On Understanding and Completing the Quarterly Reporting Form.
Two Parts: 1. Senior year – finishing High school 2. Preparing for College.
PSU Outreach VLN Technical Training and Best Teaching Practices.
1 Toggle Fullscreen mode with this button above Audio also available via phone: For assistance, call: If.
FOR PROGRAMS AT THE 2016 ALA ANNUAL CONFERENCE IN ORLANDO JUNE 23-28, 2016 ACRL 2016 Program Planning.
PRELIMINARY INFORMATION (BUDGET-BUILDING STILL IN PROGRESS) WINSTON-SALEM/FORSYTH COUNTY SCHOOLS BUDGET 1.
1 Toggle Fullscreen mode with this button above Audio also available via phone: For assistance, call: If.
USAC/Schools and Library Web Site Tour. Web Site Tour – Morning Edition… Navigation on the site – Instructions – Forms – Reference Area – Tools Later.
1 Toggle Fullscreen mode with this button above If you are reading this, then you are successfully seeing the webinar video. Use.
 SCC October 22, Sign in Sheet & Welcome  Please specify if you have been to the SCC training  Last session is October 28 8 pm  Approval.
Road Network Evaluation Tools (RONET) Version 2.00 January, 2009 Rodrigo Archondo-Callao.
Catherine Metcalf | Dec U.S. Department of Education 2015 FSA Training Conference for Financial Aid Professionals The FSA ID – Resources for Assisting.
1 Audio also available via phone: For assistance, call: If you are reading this, then you are successfully.
PSU Outreach VLN Technical Training and Best Teaching Practices.
July 9, 2014 Welcome! Making the Most of WorldCat Discovery The webinar will begin shortly.
School Name O rientation School Year Presented by Mrs.
The PAEA/JAAPA Student Writing Competition: How to Submit and Succeed Thursday, September 30; 1:00 p.m., Eastern Moderator: Bettie Coplan, MPAS, PA-C Presenter:
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
The Career and Technical Education (CTE) Completer Follow-up 2016 Follow-Up of the 2015 CTE Graduates March 3, 2016.
1 Toggle Fullscreen mode with this button above Audio also available via phone: For assistance, call: If.
For Web Events hosted by The Center
Replenishment and Direct Deposit 4/18/2017 Starts at 9am
CD Education and Outreach
Delete this slide when finished
Annual Summary Details
DSA Administrative Webinar 5/19/16 Starts at 9am
Annual Summary Details
YouthBuild Webinar Series MIS Data Management Tools and Strategies
Project 4 Children’s Services Committee Update
Admin Manual Changes 4/13/2017 Starts at 9am
River Trail Middle School
You should here audio now via either phone or computer.
We will start in 5 minutes.
DGLVR Conservation District
Workshop and Training Overview
6/18/2018 Starts at 9am DGLVR Webinar Quarterly Report
1/23/2018 Starts at 10am DGLVR Webinar
Annual Summary Report Refresher 12/12/17 Starts at 10 am
Annual Summary Report Refresher 12/6/16 Starts at 2pm
6/18/2018 Starts at 9am DGLVR Webinar Payments Overview
Worksite Assessment Overview 1/31/2017 Starts at 9am
Generation 3 Televic Wireless Microphone Instructions
Annual Summary Report And GIS Q&A 1/7/2016 w Will start at 2 pm.
Dirt, Gravel, and Low-Volume Roads
3/7/2019 Starts at 9am DGLVR Webinar GIS Analysis for CDs
CDGRS Annual Summary Report
Session II – data analysis in Excel
Dirt and Gravel Road/Low Volume Road Program
CD Spending and 5-year agreement update
You should here audio now via either phone or computer.
Reporting, and Spending
The Career and Technical Education (CTE) Completer Follow-up
7/1/19 Starts at 9am GIS Changes Update DGLVR Webinar
Stream Crossing Replacement Policy
Dirt and Gravel Road/Low Volume Road Program
GIS Updates: Admin & Edu Tracker, Project Completion Date
Presentation transcript:

1 If you are reading this, then you are successfully seeing the webinar video. Audio will be through the conference call phone line above. LVR Regional Conference Calls July 22, AM: Eastern PA Counties 2PM: Western PA Counties Please call in to share information with Center/Program staff and each other Toggle Fullscreen mode with this button above

2 Please use phone audio. Mute computer speakers to prevent feedback. Please mute lines on your end until you wish to speak. Audio:

Low Volume Roads Purpose: Allow CDs to share LVR applications, projects, and policies. Brief update on various issues Example pics and projects Traffic count questions Frequent questions Anything else LVR related Audio:

Brief Update FY Allocations: – No major changes from last year. – Approved by SCC in May, available online. – Advances 6-8 weeks after State Budget Approval. QAQCs – 2015: 14 done, 8 scheduled – 2016: ~20 more planned – Preliminary results… Audio:

DGLVR Update QAQC Preliminary Findings: QAQC

Brief Update Trainings: – ESM: 7 done, likely 1-2 more this fall – Administrative Training: 5 done in 2015 One scheduled: September 28 th : Afternoon Session (day before workshop) – Workshop: September in Cranberry twp, Butler County. Audio:

Low Volume Roads Purpose: Allow CDs to share LVR applications, projects, and policies. Brief update on various issues Example pics and projects Traffic count questions Frequent questions Anything else LVR related Audio:

Jefferson (small completed project) Wyoming (small project starting soon) Schuylkill (one complete, two proposed projects) Lycoming (two proposed projects) Audio: LVR Call Example Projects Audio:

LVR Call Example Projects Audio: before Jefferson after Audio:

Jefferson (small completed project) Wyoming (small project starting soon) Schuylkill (one complete, two proposed projects) Lycoming (two proposed projects) Audio: LVR Call Example Projects

LVR Call Example Projects Audio:

LVR Call Example Projects Audio:

LVR Call Example Projects Audio:

LVR Call Example Projects Audio: ADT 90

Jefferson (small completed project) Wyoming (small project starting soon) Schuylkill (one complete, two proposed projects) Lycoming (two proposed projects) Audio: LVR Call Example Projects

before Schuylkill, Deer Lake Road after LVR Call Example Projects Audio:

LVR Call Example Projects Audio: before Schuylkill, Deer Lake Road after Audio:

LVR Call Example Projects Audio: Schuylkill Deer Lake (done) Reilly (in progress) New Philly (funded) Audio:

Jefferson (small completed project) Wyoming (small project starting soon) Schuylkill (one complete, two proposed projects) Lycoming (two proposed projects) Audio: LVR Call Example Projects

LVR Call Example Projects Audio: Lycoming Dudek Road -Original application Ulmer Road -Original application -Amended application

Low Volume Roads Purpose: Allow CDs to share LVR applications, projects, and policies. Brief update on various issues Example pics and projects Traffic count questions Frequent questions Anything else LVR related Audio:

Diamond “Traffic Tally 4” -Simple counts -Air Tube -5 year battery -~$400 Complete Instructions: Touch a magnet to the symbol above to show count. Reset count to zero by touching magnet to dot on right side of case while display is active. Repeat touch to select length of count LVR Call *not an endorsement, just sharing info from a CD Traffic Counts

Diamond “Road Runner 3” -More complex -Lane counts -Speed counts -Direction -Air Tube(s) -Can download data and create printout -~$700 LVR Call *not an endorsement, just sharing info from a CD Traffic Counts Audio:

LVR Call Traffic Counts Audio:

Traffic Counters – Experience to share so far Extrapolation Level 1 Level 2 – Any new local policies? One CD doing counts themselves, and only level 2 – Traffic Counters Recommendations? – Questions? LVR Call Traffic Counts Audio:

Low Volume Roads Purpose: Allow CDs to share LVR applications, projects, and policies. Brief update on various issues Example pics and projects Traffic count questions Frequent questions Anything else LVR related Audio:

I am unsure of the environmental impact of some of my LVR applications? IS there a minimum environmental impact to be eligible for funding? LVR Call Frequent Questions Audio:

Should I be funding Full Depth Reclamation? – Definitions Vary “Milling” or recycling asphalt Mechanical Stabilization Chemical Stabilization – Cost – Environmental Benefit??? – Be cautions, FDR is not a “one-size” tool for every site. Please Contact SCC/CDGRS with questions LVR Call Frequent Questions Audio:

Does the Stream Crossing Policy apply to both Dirt and Gravel and LVR Projects? – YES LVR Call Frequent Questions Audio:

Can we move funds between D&G and LVR? – No, at least not for now What funds can we use if we are turning a road from paved/T&C to unpaved? – Either or both LVR Call Frequent Questions Audio:

Where do storm sewers fit into the Program? – Like rip-rap, as last resort – Encourage disconnection to stream – Maintenance or existing storm sewers, like grading in unpaved roads, is routine maintenance and not the intent of this funding LVR Call Frequent Questions Audio:

We are getting a LVR applications from “new players” that don’t really understand the Program yet. How do we “reject” their applications without turning them off to future applications? LVR Call Frequent Questions Audio:

We are getting a LVR applications from “new players” that don’t really understand the Program yet. How do we “reject” their applications without turning them off to future applications? – REQUIRE a pre-application site visit. LVR Call Frequent Questions Audio:

Low Volume Roads Purpose: Allow CDs to share LVR applications, projects, and policies. Brief update on various issues Example pics and projects Traffic count questions Frequent questions Anything else LVR related Audio:

Brief Update Upcoming Webinars: GIS Update Webinar: July 24 th, 10AM Prevailing Wage Webinar: July 31 st, 10AM Audio:

LVR Other LVR Issues and Questions? Audio: