LIBD on LBDSmeeting Viliam Senaj 04/02/2014. MKB test MKB vacuum level satisfactory for beginning of HV test: – B1: between 3.1x10 -7 and 5.7x10 -7 (new.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
LHC Beam Dumping system
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
MKD stack upgrade MKD generator meeting Viliam Senaj 23/06/2015.
LBDS commissioning – MKD tests Viliam Senaj, 11/12/2013.
Solid-state based 60 kV 15 kA switch for the SPS vertical beam dumping kicker magnet L. Ducimetière, P. Faure, V. Senaj.
Digital measurement system for the LHC klystron high voltage modulator D. Valuch, A. Mikkelsen, G. Ravida, O. Brunner.
Proposed LHC beam dumping kicker generator modifications for LS2 TE-TM Meeting Viliam Senaj 07/07/2015.
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.
STATUS 11/8/15 Itamar, Meny, Sacha, Yan. Envelope gluing : – All pieces has been produced – Yesterday, a robust pump has been installed – First gluing.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
3-CELL TEST RESULTS & 9-CELL PLAN Howie Pfeffer 11/13/13.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
How Is Sound Produced? Tweeters Use Corona Discharge to Produce Sound Corona is Produced by Dielectric Breakdown Of Air due to Extremely High Voltages.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Kicker generator and controls installation in ECA5? Etienne CARLIER
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
The ISIS Dual Harmonic Upgrade The Council for the Central Laboratory of the Research Councils Andy Seville Joint Accelerator WorkshopMarch 28th, 2006.
Spares for Critical Items Kickers W. Weterings SPS Consolidation Review Laurent Ducimetiere, Patrick Faure, Luis Miguel Coralejo Feliciano, Remy Noulibos,
MKD Reliability run Viliam Senaj TCM meeting 18/11/2014.
MKD dust related actions Viliam Senaj Technical Coordination Meeting 27/01/2015.
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
Sketching Basic Kicker System Parameters W. Bartmann, T. Fowler, B. Goddard, T. Kramer.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
MKI’s TCM Tests status Electronics and Controls 17/11/2014 by R.A.Barlow.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
1 ABTEF - 16/05/2014 Maintenance of safety-critical systems : LBDS - MKD / MKB on LHC.
YETS LHC 2015/16 - ABT Group TCM Francesco castronuovo.
IEEE NSS 2007 D.Kramer 1 Very High Radiation Detector for the LHC BLM System based on Secondary Electron Emission Daniel Kramer, Eva Barbara.
ESS | A Preliminary Feasibility Assessment of Power Converters and Magnets for Beam Raster System| | Carlos A. Martins, ESS Preliminary Feasibility.
Replacement of Obsolete/Old Hardware L. Ducimetière SPS Consolidation Review Luc Sermeus, Mike Barnes, Viliam Senaj, Thomas Kramer, Luis Feliciano, Vasco.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
Technology Department 2 April 2015A.Adraktas1 MKD 3D field calculations A. Adraktas Acknowledgments: V. Senaj MKD meeting, 2 April 2015.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
FHCT SEB cross-section measurements at H4IRRAD and consequences for MKD reliability Viliam Senaj LIBD meeting 24/01/2012.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
Injection issues overnight 10:50 Access  QPS & EPC  Vacuum leak SPS – magnet to be replaced Monday – cycling for FT and LHC only over the weekend 12:15.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Kévin Pepitone 1CLIC workshop, CERN, January 2016 Kevin PEPITONE, BE-RF LEETCHI: Drive Beam Electron Source.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
LBDS YETS activity report Viliam Senaj MKD meeting, 19/01/2016.
MKDV upgrade LIU-SPS ABT meeting V. Senaj, L. Ducimetiere, P. Faure November 4 th 2014.
Areal RF Station A. Vardanyan
RF acceleration and transverse damper systems
Fast retrigger path What threshold level we need for the fast trigger path?
Proposition of MKD & MKBH modification with the goal to reduce maximum voltage (and risk of erratic) Viliam Senaj, 05/05/2017.
LHC beam dump 7.56 TeV operation
Fast High Current Thyristor SEB test
LHC Beam Dumping System Reliability Run Summary
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
10 MHz amplifier status G. Favia
Viliam Senaj MKD meeting 23/05/2017
Overview of LBDS related tasks
PRINCIPLE OF TRANSFORMER  Mutual Induction principle  Two coils are inductively coupled  If current in one coil changes uniformly, the emf will induced.
Also on behalf of V. Senaj & L. Ducimetière
MKI Operational Experience and Future Plans
Wednesday 03/11 – The Plan Finish electron-cloud program:
Monday 24 October hours of 25ns MD
Tuesday 20 September 2011.
KFA10 status 20/05/2019 Currently:
Presentation transcript:

LIBD on LBDSmeeting Viliam Senaj 04/02/2014

MKB test MKB vacuum level satisfactory for beginning of HV test: – B1: between 3.1x10 -7 and 5.7x10 -7 (new tank) mbar – B2: between 1x10 -7 and 4.1x mbar (new tank 3x10 -7 ); today problem with 1 pump – probably HV connector on pump faulty – reparation ongoing Digital interlock levels reduced down to 1x10 -5 ; Still some problems of interlock status and vacuum levels seen by Wincc to be solved

MKD test Generators B&J /B2 : Slow control (EC) + HV test (FPS) – done Control on Gen A/B2 (missing current in main switches) – nothing unusual found: suspected high current sparking (~12 kA missing) Sparking activity of all generators on B2 will be remeasured and if needed measures taken (FPS) Installing of saturable ferrites on both beams under preparation: reduction of T_rise and dumping of the spark induced ringing between GTO stacks (FPS) Installing of the additional resistances between GTO cathode and gate with the goal to reduce mutual coupling between GTOs (FPS)

Dumping effect of saturable ferrite Perturbation on one stack simulating sparking – self-resonance between two stacks at ~ 2MHz with low dumping Same test with saturable ferrites on top of each stack: reduction of self-resonance frequency down to ~ 250 kHz at which the used ferrite has the highest losses. Higher scope sensitivity!

Effect of saturable coil on T_rise Gain of ~ 50 ns on T_rise with Uptu=3 kV