Tingxuan Liu Risk Management in Software engineering.

Slides:



Advertisements
Similar presentations
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Advertisements

Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section B 1.
Control and Accounting Information Systems
Note: See the text itself for full citations. Information Technology Project Management, Seventh Edition.
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
Project Management.
Risk Analysis & Management. Phases Initial Risk Assessment Risk Analysis Risk Management and Mitigation.
Chapter 7: Managing Risk
Risk Management Chapter 7.
Projmgmt-1/33 DePaul University Project Management I - Risk Management Instructor: David A. Lash.
Project Risk Management
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Project management.
Chapter 8 Risk Analysis Management of Computer System Performance.
Project Based Risk Management Defusing a potential ticking time bomb
CIS 375 Bruce R. Maxim UM-Dearborn
Project Risk Management Risk Mitigation. Risk Management  The prime objective of risk management is to minimize the impact and probability of the occurrence.
8 Managing Risk Teaching Strategies
CSE Senior Design I Risk Management Instructor: Mike O’Dell This presentations was derived from the textbook used for this class: McConnell, Steve, Rapid.
ELECTRONIC SYSTEMS ENGINEERING TECHNOLOGY TEXAS A&M UNIVERSITY Innovating tomorrow’s products and systems today Dr. Joseph A. Morgan, D.E., P.E.
Chapter 25 Risk Management
Software Project Management Lecture # 8. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Project Risk Management Supplement. The Importance of Project Risk Management  Project risk management is the art and science of identifying, assigning,
HIT241 - RISK MANAGEMENT Introduction
Software Project Management Lecture # 8. Outline Earned Value Analysis (Chapter 24) Topics from Chapter 25.
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Risk management process
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Information System Design IT60105 Lecture 21 Staff Organization, Risk Management and Software Configuration Management.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 11: Project Risk Management
IT Project Management, Third Edition Chapter 11 1 Chapter 6: Project Risk Management.
Risk Analysis and Management. Reactive Risk Management Project team reacts to risks when they occur. More commonly, the software team does nothing about.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Risk management.
Risk Analysis & Management
What is it? A risk is a potential problem — it might happen, it might not. But, regardless of the outcome, it’s a really good idea to identify it. Assess.
Object-Oriented Software Engineering
Chapter 15: Risk Management
1 The Concept of Risk A risk is defined as a variable that can take a value that endangers or eliminates success for a project. In plain terms, a risk.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
1 Risk Management 2 n IEEE defines risk as: “the likelihood of an event, hazard, threat or situation occurring and its undesirable consequences” [Std.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Introducing Project Management Update December 2011.
Software Engineering B.Tech IT/II Sem-II Term: Unit-7 PPT SLIDES Text Books:1.Software Engineering, A practitioner’s approach Roger s. Pressman.
Project Risk Management Planning Stage
Project & Risk Management
CSC 480 Software Engineering Lecture 5 September 3, 2004.
karRKb;RKghaniP½yrbs;KMerag Project Risks Management
RISK MANAGEMENT YULVI. Introduction Time Quality Cost Project Constraints Success Introduction.
Information Technology Project Management Managing IT Project Risk.
Software Project Management Lecture # 9. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
Chapter 13 Risk Management. Chapter Objectives 1.Define risk and risk management 2.Outline key risk issues and types of risk 3.Identify concrete methods.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Ashima Wadhwa.  Probably the most time-consuming project management activity.  Continuous activity from initial concept through to system delivery.
Risk Management in Software Development Projects Roberto Torres Ph.D. 11/6/01.
Risk Mitigation Submitted By, S. Anitha Devi, M.E-CSE.
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
Project Based Risk Management Defusing a potential ticking time bomb
ESET 419 Engineering Technology Capstone I
8 Managing Risk (Premium).
Software Engineering B.Tech Ii csE Sem-II
Recognization and management of RISK in educational projects
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Management. Management What is a risk? A risk is simply a probability that some adverse circumstance will actually occur.
Assessing and Managing Risk
Project Management Group
Risk Management.
Risk Management Part I Dr. Zahi Yaseen Contact Us
Presentation transcript:

Tingxuan Liu Risk Management in Software engineering

Risk management Risk management is the identification, assessment, and prioritization of risks(wiki) Risk management is a series of steps whose objectives are to identify, address, and eliminate software risk items before they become either threats to successful software operation or a major source of expensive rework

Risk Management Cycle

Risk Identification responsible for the recognition of potential losses and their causes. The purpose of risk identification is to discover all factors that could lead to project failure Generic risks are the potential risks to every software project Product- specific risks can only be identified by those with a clear understanding of the technology, the people, and the environment of the specific product. Project risks are those that affect the project schedule or the resources dedicated to the project. Product risks are those that affect the quality or performance of the software being developed. Finally, business risks are those that threaten the viability of the software, such as building an excellent product no one wants or building a product that no longer fits into the overall business strategy of the company.

Risk Analysis Assess the probability of a loss occurring. Establish and utilize a scale that reflects the perceived likelihood of a risk. Assess the impact of the loss if the loss were to occur. Rank is prioritize Risk is the description of the risk itself Probability is the likelihood of the risk occurring Impact is the magnitude of the loss if the risk were to occur Rank last week and the number of weeks follow the change Action documents what the team is doing to manage the risk

Risk Prioritization Risk Exposure(RE)=P * C P=probability of occurrence for a risk C is the impact of the loss to the product should the risk occur

Risk Planning Information buying. Perceived risk can be reduced by obtaining more information through investigation. Contingency plans. A contingency plan is a plan that describes what to do if certain risks materialize. By planning ahead with such a plan, you are prepared and have a strategy in place do deal with the issue. Risk reduction. The reduction of the risk action Risk acceptance. Sometimes the organization consciously chooses to live with the consequences of the risk and the results of the potential loss.

Risk Mitigation Related to risk planning, through risk mitigation, the team develops strategies to reduce the possibility or the loss impact of a risk. Risk avoidance. When a lose-lose strategy is likely, the team can opt to eliminate the risk. Risk protection. The organization can buy insurance to cover any financial loss should the risk become a reality. Alternately, a team can employ fault-tolerance strategies, such as parallel processors, to provide reliability insurance.

Risk Monitoring monitor the progress of the product and the resolution of the risk items, taking corrective action when necessary. This monitoring can be done as part of the team project management activities or via explicit risk management activities. Often teams regularly monitor their Top 10 risks. Risks need to be revisited at regular intervals for the team to reevaluate each risk to determine when new circumstances caused its probability and/or impact to change. As time passes and more is learned about the project, the information gained over time may alter the risk profile considerably.

Risk management cycle