TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.

Slides:



Advertisements
Similar presentations
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Advertisements

CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Agenda : CLIC Civil Engineering and Services (CES) WG.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Update on the Laser Beam Line
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Extraction and beamline progress B.Goddard TE/ABT.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
Installation of the T600 at Fermilab CSN2, September 22,
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
Risto Nousiainen, CLIC workshop ” Technical Issues, Integration & Cost ” working group Progress on Study of Module Cooling Risto Nousiainen.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
DCal-ALICE integration and installation plan and status A. Tauro.
Two-beam module layout
Demineralised water cooling system
Civil Engineering for FCC-eh and LHeC
CLIC Handling Engineering Update
CBETA Technical Review
CLIC Civil Engineering Update
IT-4189 Supply and installation of a cryogenic distribution system
CLIC module working group
CLIC Civil Engineering & Infrastructure
Experimental hall design in Japanese site
Installation of an Instrument on a CERN machine
News from Integration WG
Tunnel Cross Section Studies
CLIC / ILC Collaboration for CFS works
FCC Civil Engineering update
FCC-ee MDI Civil Engineering update
FCC Tunnel and Shaft Cross Sections
A very first look at siting issues
Civil Engineering for FCC-eh IR
Pierre-Alexandre Thonet
COOLING & VENTILATION INFRASTRUCTURE
ILC CFS AD&I Daresbury Lab Summary
RDR Baseline Layouts for Interaction Region
Presentation transcript:

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware and Integration CLIC Civil Engineering Layouts & Tunnel Cross Section John Osborne TS-CE Acknowledgements : C.Wyss, J-L Baldy, N.Baddams

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 2

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 3 Dewatering tunnel for possible water inflows in Limestone Rock required CERN Prevessin Site

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 4 20mrad

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 5

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 6

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 7

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 8 UTRB Caverns to be deleted ?

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 9

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 10

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 11

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 12 Possible Modifications to be studied on General Layouts : –Delete UTRB Caverns –Reduced Number of sectors to 24 (from 26) per side –Increase drive beam sector length to 868m (from 810m)

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 13 Tunnel Cross Section –Thanks to C.Wyss for carrying out this study up to now. In particular CLIC Technical Note : – CLIC-Tech-Note-003 dated 20 August 2007

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 14 The tunnel diameter has been initially dimensioned for the following items : –The CLIC machine, with their drive and main beam machine components. – The 2.4 GeV and 9 GeV transfer lines for the drive and main beams, respectively –An Installation corridor for the transportation of machine modules for installing and/or replacement.

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 15 Machine Services (1) : –Supply and return manifolds for demineralised water cooling. –Raw water supply and return. –Drainage pipe embedded in concrete invert for any water seepage –Compressed air for PETS on/off mechanism –Nitrogen distribution, if any –One or two 40mm duct(s) for optical fibre links –Two or three 500mm wide cable trays for dc power cables.

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 16 Machine Services (2) : –A free section of at least 70cm width by 200cm for personnel passage between a module and the tunnel wall. –One 500mm wide cable tray for low power and signal cables for the RF system –One 500mm wide cable tray for beam instrumentation, survey and vacuum systems –One 300mm wide cable tray for the power cables of the transfer lines

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 17 Machine Services (3) : –One 200mm wide cable tray for the cables of the vacuum and beam instrumention systems of the transfer lines –The Low-Voltage (400V) distribution –5 Cables for Medium Voltage (36KV). These cables will bring power from Prevessin Site central Area to other sites –Secure Low Voltage Electricity –Power for the transport vehicles –No mono-rail type transport included for the moment

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 18 Tunnel Services : –Normal Lighting –Leaky feeder for mobile telephones –Public address system

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 19 Safety Systems : –Panels with emergency lighting, emergency stops, red telephones –Evacuation push-buttons (break glass type) and sirens –Emergency radio communication for fire brigade –Radiation monitors –Oxygen deficiency monitors?

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 20 Alignment and Tunnel tolerances –Space has been recently allocated for alignment systems –A radial allowance for construction tolerances has been included (10cm)

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 21

TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 22 Further in-depth studies needed to better define tunnel cross section, in particular for : –Demineralised Water (ΔT to be better understood) and maximum flow to avoid vibration problems. –Ventilation System to comply with current Safety requirements for emergency situations. –(see talk by J. Inigo-Golfin) –Next iteration deadline with updated parameters ?