Hydraulic Slump. Equipment Slump cone & pan 5/8” x 24” long bull-nose rod Concrete scoop 12” ruler Bucket & sponge.

Slides:



Advertisements
Similar presentations
DAY ONE - STEP ONE - Preparation Pure Crete is added to a water truck with a spray bar located at the rear of the truck at a ratio of one gallon to 2000.
Advertisements

Portland Cement and Concrete
Reinforced Concrete Design
Concrete Man made stone. constituents u mixture of aggregate and paste u paste30 to 40% u portland cement7% to 15% by Vol. u water 14% to 21% by Vol.
Lecture 2 Design of Concrete Mixes and Properties of Fresh Concrete Dr Magnus Currie ENG-1010: Reinforced Concrete Design.
EXAMPLE QUESTIONS According to their sizes, aggregates are divided into 2 main groups, write down the names of these groups and give one example for each.
AGGREGATES There are two types of aggregates Coarse Aggregates
WORKSHEET 4 CONCRETE. Q1 a) what are the two main properties that concrete must have? (i) strength b) how do we achieve them? by using an acceptable water.
Dr. Sophia Hassiotis.  Laboratory set up  Personal Protective equipment  Directions for mixing  Slump test  Cylinder casting  Cleaning up your station.
Laboratory 1 - Calculating the Ideal Gas Constant Purpose: To use a sample of butane gas, C 4 H 10, to experimentally determine the value of the universal.
Learning Objectives Relevance of fresh concrete properties
Introduction: Standard Test Method for Density (unit weight), Yield, and Air Content (Gravimetric) of Concrete –Apparatus –Sample –Procedure ACI Certification.
Prepared by Marcia C. Belcher Construction Engineering Technology
Civil Engineering Materials
Proportioning of Concrete Mixtures
Batching, Mixing, Transporting, and Handling Concrete
Mix Design Review.
Batching, Mixing, Transporting, and Handling Concrete
Quality Control Testing
Admixtures.
Severud Associates Consulting Engineers PC Museum of the American Indian Washington, D.C. Yale University Ingalls Hockey Rink New Haven, CT Eventi Hotel.
Concrete Mix Design Technician School
Topic : MIX DESIGN OF CONCRETE Properties of concrete Submitted To: DR. AYUB ELAHI Submitted By: SOHAIB NASEER 2K9-scet-29/CIVIL M.ZAEEM FAKHAR 2K9-scet-03/CIVIL.
Chapter 12 Concrete Construction Part 2 1CE 417, King Saud University.
Concrete Construction
READYMIX INDUSTRY There are two main components in asphalt concrete: 1) the asphalt cement, or glue, and 2) the aggregates.
Placing Quality Concrete
Band Saw Safety Rules. Safety Rule #1 Keep all guards in place. Keep all guards in place.
Manufacturing Technology Safety: Band Saw. Safety Rule #1  Keep all guards in place.
Intro to Concrete 18.0 & 19.0 Class notes.
ADMIXTURES Department of Civil Engineering,
Plain Concrete I. *Definition 1. Concrete: a hard, strong construction material consisting of a hardened or set mixture with such aggregates as sand, gravel,
Concrete Unit 24 Carpentry and Building Construction.
The Cathedral of Our Lady of the Angels. Los Angeles, California Rafael Moneo.
ACI Concrete Mix Design
2. Suliman AYEADH Al-Otaibi Howaidi Mutlaq Al-Shaibani
UNIT: CONCRETE/MASONARY
Design of Concrete Structure I Dr. Ali Tayeh First Semester 2009 Dr. Ali Tayeh First Semester 2009.
Concrete Technology Ch8: Proportioning Concrete Mixes Lecture 14 Eng: Eyad Haddad.
Chemical Admixtures In Concrete. What Are They? Ingredients other than: Ingredients other than: –Cement –Water –Aggregates Added before or during mixing.
Eng. Malek Abuwarda Lecture 12 P1P1 Construction Methods Lecture 12 Production of Aggregate and Concrete.
Cement: TYPE I, Specific Gravity=3.15 Coarse Aggregate: (BSG)SSD= 2.70
Today’s Class Review of Chapter 8.1 Membrane Properties (small quiz). Lab: Transport across a semi-permeable membrane Passive transport: OSMOSIS Lab Conclusion:
Concrete Field Sampling
Concrete Mix Design ACI Variation 5% Variation for Adjusting Mixes n Determine what is to be added or reduced n If it is sand, stone, or cement compute.
1 Determination of Slump of Hydraulic Cement Concrete Determination of Slump of Hydraulic Cement Concrete (ASTM Designation: C 143) Mohammed Abdullah Al.
Concrete Concrete Cement Sand Gravel Water.
CEMENT CONCRETE MIX DESIGN
Concrete mixers.
CVL 2407 Faculty of Applied Engineering and Urban Planning Civil Engineering Department 2 nd Semester 2013/2014 Dr. Eng. Mustafa Maher Al-tayeb.
Submitted By- Amandeep Singh Roll No
GURU NANAK DEV ENGINEERING COLLEGE, LUDHIANA Submitted to RESPECTED.C.S. SINGLA SIR (GNDEC) Submitted by Submitted by: Salman Khan Univ. Roll No
UNIT: CONCRETE/MASONARY Concrete Proportions Modified by Georgia Agricultural Education Curriculum Office July, 2002.
Mixing and Pouring Concrete. Proper mixing has been accomplished when: A.Every particle of sand and stone is coated with the cement paste. B.The sand.
( PTY) LTD Company Reg No.: 1947/024677/07. Slump Test (PTY) LTD SLUMP TEST Page 2.
CVL 2407 Faculty of Applied Engineering and Urban Planning Civil Engineering Department 2 nd Semester 2013/2014 Dr. Eng. Mustafa Maher Al-tayeb.
Concrete Lesson 1: Components of Concrete
Concrete Man made stone.
Chemical Admixtures In Concrete
Concrete Strength Testing
Using Superplasticizer in Masonry Grout
SLUMP TEST.
WORKABILITY TESTS OF CONCRETE
ADMIXTURES???? Materials added to the concrete besides cement, water and aggregate. To improve the properties of the concrete required. Admixtures can.
Chemical Admixtures In Concrete
What is CONCRETE SLUMP TEST –
Admixtures.
Building Good Boxes ACPA Spring Short Course School
Rapid Setting Cement Based Mortars Using Nano Materials
Nagarjuna college of engineering and technology
Presentation transcript:

Hydraulic Slump

Equipment Slump cone & pan 5/8” x 24” long bull-nose rod Concrete scoop 12” ruler Bucket & sponge

Preparation Using the sponge, moisten the pan and the inside wall of cone Stand on cone fins

Procedure Using the scoop, carefully place the concrete in the slump cone Fill the cone 1/3 full (by volume)

Procedure Using the rod, rod the concrete 25 strokes; do not strike the bottom Start around the perimeter with the rod slightly inclined and spiral in toward the center

Procedure Continue the procedure for the second and third layers Rod the layers just slightly into the preceding layer. Do not strike the side of the cone.

Procedure Overfill the cone on the last layer. If the level of the concrete drops below the top of the cone, stop rodding, add more concrete and resume the count

Procedure Strike off the excess concrete using the rod as a striker Use a sawing and rolling motion

Procedure Clean the concrete from around the base of the cone While holding the cone in place by the hand-holds, step off of fins and hold cone down with hands

Procedure Lift the cone in a single straight-up motion in 3 to 5 seconds Turn the cone upside down and place it next to the subsided concrete

Procedure Place the rod across the base of the inverted cone. Measure from the bottom of the rod to the displaced center of the concrete Record to the nearest ¼”

How Do We Manage This? The Problem: “Slump Is Always On The Move” “Target” or “Slump Not To Exceed” will be specified by the engineer in the specification.  Ie, 3” plus or minus 1”  Ie, not to exceed 4” Slump decreases with time at varying rates Dependent on many factors including: ◦cement content and characteristics ◦Temperature ◦admixtures that are used Slump loss is particularly a problem when concrete is being transported long distances or if placement is delayed.

Strength is Compromised Result Of Adding Water to the Truck:

Solutions: Some mixing water is held back at the plant and added at the job site as long as:  Addition of water does not exceed specified W/C ratio  Addition of water does not exceed specified slump RULE OF THUMB: One gallon of water per yard of concrete will increase slump one inch READ: “CONCRETE IN PRACTICE: JOBSITE ADDITION OF WATER”

Another Solution: Superplasticizers & Water Reducers Acceptance of superplasticizers allows us to maintain desired water-cement ratios or reduce them while maintaining workability for placement. Use of superplasticizers will also allow placement of concrete at slumps higher than the typical 3" with a lower water- cement ratio. MUST BE APPROVED BY ENGINEER

REMEMBER: Any modifications to the concrete at the jobsite MUST be measured and recorded for quality assurance purposes!