The life-cycle of a 3GPP Spec Abridged for family viewing.

Slides:



Advertisements
Similar presentations
Publication Module using back end interface. Institution Data Entry Add Documents. Edit/Delete Documents that are added but not yet sent to Institution.
Advertisements

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 4 1 All you always wanted to know about.
The MCC Specs database A guided tour. The Specifications panel …
1 3GPP TSGs SA Meeting #49, San Antonio, Texas, USA, September 2010 SP © 3GPP Organizational Partners Satisfaction survey results In.
JMM1 Editing a 3GPP spec - tips for experts Move to next slide.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 10 1 All you always wanted to know about.
7 Feb 2000JMM1 Editing a GSM spec - tips for experts.
All you always wanted to know about 3GPP … but were too afraid to ask.
PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
1 Module 9: Submit. Objectives 2 Welcome to the Cayuse424 Submit Training Module. In this module you will learn how to use Cayuse424 to:  Discern the.
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
GT Portal Version 2.0 Data Delivery December 2008.
How ETSI publishes 3GPP specifications. 15 October 2000JMM2 A 3GPP specification is based on the standard template (available from
USC’s Internet-based Time and Attendance Management System.
1 Secondary Fields Web Portal The following slides displays the revised Secondary Fields web portal, version
Welcome to….FairEntry Online
SE Document Document Control Software. SE Document SE Document is a Document Management Software System to help you meet all document control requirements.
Engineering Document Repository & Electronic Signature (E-Sign) Tutorial 1 DCG- Revision C 7/25/2014.
Submitting Book Chapters via Manuscript Central A Short Guide for Wiley-VCH Authors.
The change control cycle Or Where little 3GPP specifications come from …
The Institutional Documentation (IDOC) Service Improving the process for students in
VERSION 7 What’s to Come?. Workflow – Lifecycle Definition  Ability to define custom Lifecycles NEW BEING WORKED IN REVIEW WAITING FOR APPROVAL APPROVED.
For Users : Username & Password for logging in to system : CME proposal to be added in system For System Configuration : Initial budget or latest updated.
Easy Chair Online Conference Submission, Tracking and Distribution Process: Getting Started + Information for Reviewers AMS World Marketing Congress /
SOML Issue Tracking Guide to using the new ETSEDMS server for Issue Tracking.
WPM What’s behind the icon? Work Programme Management.
EContract Authoring Supplier Training Material. ‘Supplier Review’ Process.
Middle States Self-Study Online Resources. Primary Web Resources  Provost’s MSCHE site  Document and Feedback request forms  Secure MSCHE Document.
Click to edit Master text stylesClick to edit Master text styles Second levelSecond level Third levelThird level Fourth levelFourth level Fifth levelFifth.
ENCOMPASS Voucher Build Process
Doc.: IEEE /0038r0 Submission Jan 2012 Adrian Stephens, Intel CorporationSlide nd Vice Chair’s Report – Jan 2012 Date: Authors:
TRW Engineering Change Request System {CRS} Released in the Windchill Environment Getting Started in WCRS TRW Automotive December, 2004 TRW Automotive.
WebScan Change Order. WebScan change order: What is it? Beginning in 2010 changes to a WebScan order will need to be submitted via a WebScan change order.
The change control cycle Or Where little 3GPP specifications come from … Move to next slide.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
MCC 3GPP Work program Database Ian Doig, MCC. 3GPP Work program Database Request by Partner Organisations for a common 3G Work program Database. Based.
1 Two Places to Enter Time My Tasks (Project Plans, Proposals and Activity Plans) My Timesheets (Periods and Administrative Time)
Find-A-Church.org is much more than a directory of churches. Find-A-Church.org.
PMO Advisors, LLC PMO Advisor © Release 2.1. The PMO Advisor Portal The PMO Advisor is a gateway to Project Management tools. This portal has two primary.
Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 1 WPM What’s behind the icon? Work Programme Management.
EContract Authoring Supplier Training Material Caterpillar Non-Confidential.
The lifecycle of a GSM spec Or All you ever wanted to know about where little GSM specs come from.
Collecting Copyright Transfers and Disclosures via Editorial Manager™ -- Editorial Office Guide 2015.
Document Module Features Streamlines the control, routing and revision process for critical documents and records Controls documents in any format (Excel,
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
View Receipt & Invoice Status Course 1 Training Presentation for Supply Chain Platform: Rolls-Royce May 2013.
Purchase Document Management Supply Chain Platform: Energy For Siemens Energy ADGT November 2014.
IPEmotion License Management PM (V1.2).
© CGI Group Inc. User Guide Subversion client TortoiseSVN.
Doc.: IEEE /0051r1 Submission May 2011 Adrian Stephens, Intel CorporationSlide nd Vice Chair’s Report - May 2011 Date: Authors:
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
eInvoice Business Process
TechAnywhere Android Features/Enhancements (2012)
Conducting the performance appraisal
The lonely road or How a spec gets from WG Secretary to the server, and how it gets published as an ETSI deliverable 1.
Conducting the performance appraisal
Workforce Mobile (Android)
Getting Started with Git and Bitbucket
CMC, Channel Leader, GM, Regional Controller
Electronic Review Process
User Guide Subversion client TortoiseSVN
nd Vice Chair’s Report - May 2011
nd Vice Chair’s Report – Mar 2012
2-1-1 Automated Verifications
GT Portal v. 2.0 Data Delivery
nd Vice Chair’s Report – Sept 2012
Design Collaboration.
Instructions for NFBC material request Evaluators
Purchase Document Management
Provider Maintenance—Accreditation Module
Presentation transcript:

The life-cycle of a 3GPP Spec Abridged for family viewing.

Slide 2 Legend … xxxyyy Pale green = Action by Rapporteur (or other WG delegate) Turquoise = Action by Project Manager yyy Yellow = Action by Specifications Manager Click on button for links to related information on the web.

Slide 3 A spec needs changing … start Identify the spec Download to own PC Download CR cover page

Slide 4 Follow the instructions on the CR cover page and on the web to prepare the Change Request. Optionally, distribute to WG via exploder. Wait for comments Deadline for comments reached WG delegate comments Revise CR. Ready for WG meeting

Slide 5 Prepare formal Tdoc to WG meeting. Request Tdoc number Use Tdoc number. Wait for Tdoc no. Receive request. Idle (ha!) Grant Tdoc number Idle This process is being automated via web application. CR number may have been granted at same time as TDoc number, or may wait till CR is agreed by WG. Record details of CR in CR database (WG-specific).

Slide 6 Present CR to WG meeting. Agree CR. Update CR database (WG- specific). CR agreed. CRs may be accumulated over several WG meetings between two TSG meetings. Check CR for consistency. Conforms to instructions in 3GPP TRs and ? Does not conflict with other CRs?

Slide 7 CR agreed. All CR entries for WG.CR entries for all WGs. Idle (ha!) Thus must happen before the start of the TSG meeting. Update master database Ready for TSG. Idle TSG plenary approaches …

Slide 8 Ready for TSG. TSG plenary starts … Present CRs to TSG. This may actually be done by WG chairman. Discuss and approve (or reject, etc) CRs. Idle Update master database. Idle Ready to implement CR.

Slide 9 Ready to implement CR. TSG plenary has finished … Download Spec from server. Edit spec to incorporate all CRs. Completed spec to Specs Manager. Record receipt of Spec. Idle All done?

Slide 10 Idle Update master database to indicate “supplied”. Plausibility check on edited spec. (Date, version number, references, change history, page layout, etc.) Make file available on 3GPP server (and MCC- internal mirror) in: Meeting-related directory; “Latest” directory; Archive directory. Update master database to indicate “available”. Time is off the essence: beware deadline for spec availability!

Slide 11 Spec relates to a frozen Release? Send to ETSI for transposition as ETSI TS/TR. Idle Is for publication? Y Y N N Certain TRs are internal working documents of TSGs. Other SDOs retrieve Spec from 3GPP file server.