1 SSD status report – 16 July 2004 Jerome Baudot, Strasbourg STAR Collaboration Meeting BNL, 16 July 2004 Silicon Strip Detector status report  Report.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 1 Cosmics in ITS: tracking & alignment A.Dainese (INFN Legnaro) ITS alignment group:
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
STAR HFT STAR Collaboration Meeting - LBNL MIT/MIT-Bates Gerrit van Nieuwenhuizen, Stephen Steadman, Jim Kelsey, Ben Buck, Peter Goodwin Jason.
X.Dong, USTC/LBNL Feb. 20th, 04, STAR Collaboration Meeting 1 TOF Software Progress Xin Dong, for TOF Group  TOF detectors in Run IV  Online software.
STAR Collaboration Meeting, Nantes, July2002 SVT Analysis/Status Update Jun Takahashi – University of Sao Paulo.
STAR HFT STAR Collaboration Meeting - LBNL IST Software Status Yaping Wang (University of Illinois at Chicago) Outline Offline software infrastructure.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
HFT Project Overview CD0 Review H.G. Ritter LBNL.
1 TPC online  offline calibration November 2002.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
Spiros Margetis (Kent State Univ.) for the STAR Collaboration STAR Heavy Flavor Tracker Bari, Italy 2014.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
STAR Collaboration Meeting, BNL, Feb 2005 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software update L3 display 200 GeV February.
1 Behaviour of the Silicon Strip Detector modules for the Alice experiment: simulation and test with minimum ionizing particles Federica Benedosso Utrecht,
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
STAR Operations Workshop 2007 H. Matis1 SSD Operations August 20, 2007 H. Matis for the SSD group.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
G. Contin | The STAR Heavy Flavor Tracker (HFT) and Upgrade Plan Quark Matter 2015 – Kobe, Japan Session : Future Experimental Facilities,
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
H-Jet polarimeter status report Yousef Makdisi RSC 07/28/06.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
STAR Collaboration meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC analysis update Just to remember … What we have done.
E-EMC developments and plan Jan Balewski IUCF, Indiana Detector status Run 3 goals Calibration Software status STAR Analysis Meeting BNL, October
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
H. MatisSTAR Inner Silicon Tracking Detector Review – July 8, SSD software and hardware maintainability Howard Matis.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
Status of the STAR tracking upgrade Gerrit van Nieuwenhuizen STAR Collaboration Meeting BNL, February 24, 2005.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
1 Outline First look at the 2007 data with the offline reconstruction (~1000evts) : –Clusters. –Reconstructed Space points. FastOffline plots: –2 differents.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
Ssd simulation status : preparation for embedding Jonathan Bouchet Svt Meeting : 09/19.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
Jim Thomas - LBL 1 SSD News and Integration Notes Jim Thomas Lawrence Berkeley National Laboratory September 11 th, 2007.
EEMC STAR Jan Balewski, IUCF, Indiana STAR Collaboration Meeting MSU, August 2003 Upper Structure Mounted 8/1/2003 Run 3 hardware calibration.
0 Characterization studies of the detector modules for the CBM Silicon Tracking System J.Heuser 1, V.Kyva 2, H.Malygina 2,3, I.Panasenko 2 V.Pugatch 2,
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
Week coordinator report - C. Marchand
Bonn Test Station data analysis with PandaRoot
Hall A Compton Electron detector overview
Presentation transcript:

1 SSD status report – 16 July 2004 Jerome Baudot, Strasbourg STAR Collaboration Meeting BNL, 16 July 2004 Silicon Strip Detector status report  Report on last year ® Completion this year

2 SSD status report – 16 July 2004 SSD structure a module a ladder Strip detectors double sided 2  in r , -1<  <+1 500k channels Performances  R  ~ 20  m readout ~ 5 ms (4 RDO boards) air cooled Command (JTAG) initialize FEE slow control

3 SSD status report – 16 July 2004 How many ladders do we have ? run IIIrun IV ½ SSD = 10 ladders = 160 modules 1 ladder = 16 modules

4 SSD status report – 16 July 2004 Operations in run IV AuAu data Mevts 1 RDO board died mid- february 2 others RDO unplugged ! for pp FEE eratically loosing bias (know how to fix) 1 air compressor failure No L2 accept Monitoring 1 st Slow Control version 1 st histos set in Online No alarms handling Electronic logbook

5 SSD status report – 16 July 2004 Data analysis The basics pedestal as expected noise S/N

6 SSD status report – 16 July 2004 We do see particles P side N side Landau fit : same charge collected on both sides  particles

7 SSD status report – 16 July 2004 Data analysis : pedestal instability 15 January 2 April dead RDO board

8 SSD status report – 16 July 2004 Production status now Modules >160 done Ladders (10 already installed) 9 done ladder 0 2 spares done Detector completed this summer 1 new sector (out of 2) of 5 ladders

9 SSD status report – 16 July 2004 Installation for summer August get new sectors of 5 ladders redispatch mounted ladders -> sect 7 lad test all 4 sectors (2x3+2x7) shielding test RDO boards (1 new) install new power supplies change pedestal compensation (against fluctuation) >23 August rolling in test Integration L2 acept alarm handling no more Reset (FEE bias) new sectors old sector run IVrun V

10 SSD status report – 16 July 2004 SSD software integration Already completed Daq : SsdReader Ssd hit reconstruction StiSsd (almost done, not yet reviewed, need to be tuned) Almost done Databases (Geometry and Calibration) : defined, currenctly filling Need more work Alignement : starting from StSvtAlignment ? (used for the SSD sometime ago) Data SsdReader Reconstruction SsdPointMaker StEvent StSsdHits ITTF StiSsdDetector Simulation sisdgeo.g StSsdSimulati on Alignment StSsdAlignme nt Db, Geom, Calibration

11 SSD status report – 16 July 2004 SSD in GSTAR Material distribution and radiation length