Building A Computer Centre HEPiX Large Cluster SIG October 21 st 2002 CERN.ch.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

Submitted by: Name:Rajendra Kumar Choudhury Branch:Electrical Engg.
QUALITY AND TECHNOLOGY
Computer Room Provision in Atlas and R89 Graham Robinson.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Fire Precautionary Arrangements Presented by Mick Leadbetter Fire Safety Adviser.
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
Terms 4 Definitions and Questions. Motherboard The main board of a computer, usually containing the circuitry for the central processing unit, keyboard,
Zycko’s data centre proposition The very best products and technologies Focus on what your customers need Turning products into solutions Wide range of.
If you use your computer more than a few hours per day, we suggest you not to turn off your computer at the end of the day. Instead turn off only the.
Computer Maintenance Power Quality and Protection Copyright © Texas Education Agency, All rights reserved. 1.
INTRODUCTION IT’S ALL ABOUT YOUR PERSPECTIVE. WATER DAMAGE IS RESPONSIBLE FOR GREATER THAN 25% OF RESIDENTIAL INSURANCE CLAIMS ANNUALLY. IN THE U.S. THAT.
Technician License Course Chapter 9 Lesson Module 20: Electrical Safety.
Technician License Course Chapter 9 Lesson Module 20: Electrical Safety.
Electrical Power Systems
Computer Room Experiences A medium sized tier-2 site view Pete Gronbech GridPP Project Manager HEPIX April 2012.
Circuit Protection Electrical circuits require protection to prevent fire or electrocution in the event of a fault. There are two main types of circuit.
How PC Power Supplies Work If there is any one component that is absolutely vital to the operation of a computer, it is the power supply. Without it, a.
Managing a computerised PO Operating environment 1.
October 23rd, 2009 Visit of CMS Computing Management at CC-IN2P3.
SAFETY FEATURES USED IN THE CIRCUITS OF THE MAINS SUPPLY
Presented by:- NAME : Sanjay Kumar Pani BRANCH : Electrical & Electronics GROUP : ‘B1’ ROLL NO. : E/04/14.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
Residential Construction Unit 5- Energy Efficiencies and Mechanicals Mr. Todzia.
Schneider Electric 1 Foundational BUSINESS OVERVIEW Rev 2 Virtualization and physical infrastructure – Integrations with Microsoft and VMware.
Electrical Installation 2
By: Amanda Torres BLACKOUTS:What causes them and how to reduce… Energy is the main source that keeps this world alive. When energy blows out it causes.
T H E U N I N T E R R U P T I B L E P O W E R P R O V I D E R SineWave - Installation rules.
Air Conditioning and Computer Centre Power Efficiency The Reality Christophe Martel Tony Cass.
PHY 202 (Blum)1 More basic electricity Non-Ideal meters, Power, Power supplies.
Computer Operations Group Data Centre Facilities Hitendra Patel June 2015.
Transforming B513 into a Computer Centre for the LHC Era Tony Cass —
Planning the LCG Fabric at CERN openlab TCO Workshop November 11 th 2003 CERN.ch.
20.3 Electric Circuits
Preventing Common Causes of loss. Common Causes of Loss of Data Accidental Erasure – close a file and don’t save it, – write over the original file when.
Voltimum Expert Topic – Power Harmonics. What are Harmonics? They are waveforms with frequencies that are multiples of the fundamental frequency (Typically.
Physical Infrastructure Issues In A Large Centre July 8 th 2003 CERN.ch.
Computer Rooms 101 Geoffrey Day. Will the floor collapse? 42RU rack - 115kg 40 * 1Ru servers - HP DL360, 16.78kg each Shelves, cables etc 15KG per rack.
6/26/01High Throughput Linux Clustering at Fermilab--S. Timm 1 High Throughput Linux Clustering at Fermilab Steven C. Timm--Fermilab.
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
Computer Centre Upgrade Status & Plans Post-C5, June 27 th 2003 CERN.ch.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.
Nikhef/(SARA) tier-1 data center infrastructure
Phase II Purchasing LCG PEB January 6 th 2004 CERN.ch.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Requirements for computing room A. Gianoli, M. Serra, P. Valente.
High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
Introduction TO Network Administration
Memory 2. Activity 1 Research / Revise what cache memory is. 5 minutes.
Computer Centre Upgrade Status & Plans Post-C5, October 11 th 2002 CERN.ch.
19.2 Domestic electricity Paying for electrical energy  Most of the electrical appliances in your home use mains electricity.  Mains electricity: alternating.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
Energy Basics Understand it, Control it and Save.
CERN - IT Department CH-1211 Genève 23 Switzerland t Power and Cooling Challenges at CERN IHEPCCC Meeting April 24 th 2007 Tony Cass.
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
Introduction to the Data Centre Track HEPiX St Louis 7 th November 2007 CERN.ch.
P.1 Book 4 Section 3.2 Mains electricity and household wiring Electricity: friend or foe? Alternating current and mains circuit Safety designs in domestic.
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Unit 2: Chapter 2 Cooling.
CERN Data Centre ‘Building 513 on the Meyrin Site’
the CERN Electrical network protection system
COOLING & VENTILATION INFRASTRUCTURE
Introduction to Computers
Effects of an Electric Current and Domestic Circuits
“ Highlighting the risks and challenges presented by modern data-center cooling systems in fire detection and suppression applications. “ Dave Boyack Sales.
Hazardous Areas & Hazards of Electricity
The key to comfort and efficiency for heating and air-conditioning
Presentation transcript:

Building A Computer Centre HEPiX Large Cluster SIG October 21 st 2002 CERN.ch

CERN.ch 2 Why do you need a Computer Centre?  Because you have some combination of CPU servers, Disk Storage and Tape Storage.  All of this equipment –consumes electrical power »which may need to be protected against failure –turns electrical power to heat at 100% efficiency, –needs to be put somewhere, and –needs to be protected against fire.  Your Computer Centre or Computer Room must –have an adequate power supply –have adequate cooling, –be large enough, and –have smoke detection and, possibly, fire suppression.

CERN.ch 3 Electrical Power

CERN.ch 4 How much power do you need?  Tape drives and robotics are low power. O(100W) per device and you don’t have many of them.  Disks are also low power. O(10W) per device. –Main concern is inrush current as drive spins up. Don’t start them all at once.  CPUs are the problem. Lots of them and power efficiency is not improving as raw performance improves. –A study of processor specifications suggests constant power consumption of 1W/SpecInt95. –Power factor of the power supply is important. Off the shelf supplies have power factor of ~0.7. »Power supplies with power factors better than 0.8 are available, but these are generally more expensive.

CERN.ch 5  PC power supplies only draw current when the voltage exceeds a certain threshold:  Result? Lots of harmonics, especially 3 rd. These lead to high currents in the neutral conductor. –Electrical distribution can need neutral conductor with twice the cross section of the phase conductors. »All the way from room distribution, through PDUs to the transformers. »c.f. no neutral needed for ideal 3-phase. US building code used to allow half cross section neutral conductors. No longer! »Potential fire risk. Switched Mode Power Supplies

CERN.ch 6 Power Protection—High Level  Usual question: “What happens if your primary supply fails?”  Better question: “How long does it take you to perform a controlled shutdown?” –My guess? Over half an hour. Probably 2 hours.  High power, long autonomy battery backed (static) UPS systems are expensive. Need diesel backed (rotary) systems for decent autonomy. These are also expensive!  If you can, install a 5 minute static UPS to smooth power and cover microcuts. –expect to lose physics computing due to power cuts. –consider a 2 hour static UPS for critical systems (networks, databases, …) if you have no diesels.

CERN.ch 7 Power Protection—Local  Many “multi sockets” come with differential (or earth leakage) circuit breakers. –These trip on small difference (usually 30mA) between the phase and neutral currents.  This is fine for general home use, but bad for connecting many PCs. –Power supply design gives natural difference of 3-5mA. If you have lots of PCs behind one differential breaker this may trip if there are small disturbances.  This is our theory. We will try omitting these breakers for new installations. –But need to provide dedicated sockets for, e.g. consoles. –Ask me for an update next year…

CERN.ch 8 HVAC

CERN.ch 9 HVAC Options  Water cooling –Efficient, but no pipes in equipment today. Does any vendor want to be the first to add these? »IBM Ice Cube would have internal water cooling, but even here, closed system is mentioned as option. »HP talk of using “ink jet” heads to spray water on cpu. This cools the chip faster, but the heat still ends up in the machine room. –Can put water cooled pipes in racks (common practice in online areas for experiments) but rack layout has to be fixed.  Air cooling –Air conditioning units are connected to the chilled water supply and circulate chilled air in the machine room. –Flexible, but…

CERN.ch 10 Air Cooling  … Heat capacity of air is limited. Extracting lots of heat means lots of air changes per hour.  Acceptable level depends on room usage and occupancy. –above AC/h the environment becomes uncomfortable for general work. »Good! Make SysAdmins work from their offices! –120AC/h acceptable for technical areas  If possible, avoid closed systems. Injection of external fresh air allows “free cooling” in winter.  Cold air injection usually under false floor –need to ensure air flow through equipment racks. –Roof level injection possible, but requires high ceiling.

CERN.ch 11 Air Cooling Limits at CERN Clearance Air Flow2.5-3m>6m Comfortable600W/m W/m 2 High1200W/m W/m 2 For guidance only: your mileage may vary… Don’t forget to account for overheads (e.g. solar heating)! These depend on location, but we have 3-400W/m 2 for the main machine room in summer.

CERN.ch 12 CERN Planning

CERN.ch 13 Space

CERN.ch 14 Space  Box size may not be the determining factor! –40 1U boxes in 19” rack: 4kW in 1m 2 (including clearance).  So, good if you can mix CPU and disk servers. –Better still if you have tape robots!  Otherwise, space is relatively easy. Just remember to add enough clearance.

CERN.ch 15 Fire Precautions

CERN.ch 16 Smoke Detection  Laser based smoke detection systems are extremely sensitive. –Use these to raise early alert, but –need less sensitive detectors as “second knock” to trigger any fire suppression or prevention.  Localisation is a problem. –The combination of sensitive detectors and rapid air flow means all detectors will trigger in time—usually sooner, not later. –Locality of smoke detection competes against efficient cooling. »You can divide a big room into smaller ones, but it will be harder to cool. »The same is true for closed racks. And, anyway, smoke will escape into the room eventually.

CERN.ch 17 Fire Suppression or Fire Prevention?  Fire Suppression if you want to keep services running at all costs (e.g. banks, phone companies, ISPs). –Usual system is to flood machine room with an inert gas (Nitrogen/Argon mixture now that Halons are banned). »Gas is expensive and bottles are bulky. »Machine room needs to be hermetic! –Some modern water based systems can be used on running equipment and are good for scrubbing smoke particles from the air.  Fire Prevention is the alternative if you want to avoid fire at all costs. –Cut electrical power as soon as smoke is detected. »Risk of progression to fire cut by 20x-100x for smouldering PCBs  Fire Prevention chosen at CERN for our new machine room in the former tape vault. Ask our opinions next year… –We’re still not sure what to do for our main machine room because of the localisation problem.