PMI-SVC Website Redesign Initiative November 9, 2006 John Patricio PMP MBA PMI-SVC Volunteer Information Technology Director.

Slides:



Advertisements
Similar presentations
Copyright © 2008 Affiniscape. All rights reserved. Member Management II Brad Hodgkinson, Product Manager.
Advertisements

Preparation of the Self-Study and Documentation
Project: Sample Deliverables October 21, 2008 Version 3.0 Prepared by: Noreen Y. Whysel Contact: 1 Information Architecture.
EDC404: ICT in Education Assigment Report Group Members: 1.Ms PHAT Sokhaley 2.Ms GNE Pidor 3.Ms SAO Chan Ellen.
Down Syndrome Support Association of Southern Indiana 1. Introduction The previous website lacks cohesion and a positive overall message. It is more a.
Literacy and Music Education Online Sources Introduction.
Mastering, Improving and Managing of the Advanced Metering Infrastructure (AMI) Implementations Date: November 19, 2014 Team members: Joe Jones TECH
Research Process in General. Formulation of the Research Problem. Review of Related Literature. Setting the Research Objectives or Hypothesis. Research.
Chapter 9 Writing Reports
1 KEY PERSONNEL SUGGESTING FORMAT FELIX E.O OPATA MBA (STRATEGIC PLANNING & MGT.) BSC.HONS.(BIOMEDICAL SCIENCES) DIPLOMA MANAGEMENT (CAMB).
Kentucky Virtual Library Re-visioning at Ten Years Strategic Planning Project 2009 Strategic Planning Project 2009.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
How to write a proposal SEM 555 Dr. Salma Chad. What do you Expect ?
University of Wisconsin System HRS Project Update to ITC November 19, 2010.
Web Technologies Working Group October 25, Approval Needed Web Standards and Guidelines – Development of an online resource with the objective of.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Web Site Redesign Homepage Committee February 2005.
Advancing Government through Collaboration, Education and Action Harnessing Life Events Information Sharing Team.
Web Site Redesign for ULAA (Union of Liberian Associations in the Americas) Isaac G. Nyenaweh Software Development, Database & Digital Media.
Analysis. Solution Requirements 1. Identify the functions and attributes of the website. 2. Write a problem statement. (What is the problem? What will.
THE FORMAL REPORT THE FORMAL REPORT. Definition and Purpose Definition: reports formatted in a professional way to emphasize its importance or recommendations.
Research Project Overview Optional, but highly recommended –Science! Learning! Fun! Local Competition, not Scrimmage –5 minute presentation, 5 minute Q&A.
Project Charter
PRESENTATION SKILLS Presenter: Rony Jose Thekkel Date: Mar 18 th 2011.
E-Commerce Project Fifth Lecture Mohammed Antour
©2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Title:___________________________________________________ Author:_________________________________________________ Place photo here.
Objectives: Define and implement a website layout that enables users to find key information efficiently Develop a process to ensure the sustainability.
Delta3D: To Date Progress of the Delta3D Open Source Game Engine Erik Johnson, Technical Director.
Earthquake Response Cooperation Initiative Phase 1 Progress Report By Chinese Taipei May 19, 2001 APEC EWG 21 Kuala Lumpur, Malaysia.
Chapter 8 Process Implementation Reference: Tan, A. (2007). Business Process Reengineering in Asia: A Practical Approach, Pearson Education, Singapore.
Paper Title Authors names Conference and Year Presented by Your Name Date.
Spring CS-EE 481 Lillevik 481s07-l2 University of Portland School of Engineering Senior Design Lecture 2 Technical staff Prototype phase: DEP, TOP.
Report writing. What is a report?? Record of a particular event. The literal meaning of the word report is a collection of formal or official statements,
WEBSTER University Space Coast Campus 6000 Integrated Studies Research Report Requirements.
PROGRESS REPORT LECTURE 7. What is a Progress Report? A Progress Report : documents the status of a project describes the various tasks that make up the.
THE FORMAL REPORT THE FORMAL REPORT. Definition and Purpose Definition: reports formatted in a professional way to emphasize its importance or recommendations.
Annual State Of The Chapter PMI Orange County Chapter June 11, 2013 Tariq Shaikh, PMP – President Greg Scott, PMP – Past President 1.
Defining a new role: the embedded Research Information Manager Kamal Achuthan (UCL) Karen Walshe (British Library)
Asset Management Solutions © Leonard G. Middleton Physical Asset Management Practice –Maintenance Management –Project Management Strong technical background.
1 1 NCMA Contract Management Leadership Development Program Breakout Session #D10, Room 504 Crystal Glenn Dr. John Wilkinson Melanie Burgess Wesley Dewalt.
Developing a Standard Approach to Project Management Nancy Nichols, MBA, PMP PMI-SVC PMO Forum July 28, 2010.
Introduction to Web Authoring Bill Hart-Davidson AIM: billhd30 Session 21
Preparation of the Self-Study and Documentation
Planning Business Messages
Oceanic Fisheries Programme Web Site
Title of the presentation
How Dynamic Website Designs are Ruling the Digital World?
Come and be a member of our website.
HIT STANDARDS & INTEROPERABILITY COLLABORATIVE
Lessons Learned by Team ‘x’ ‘Name of team members’ Date (dd-mm-yyyy)
Chapter 19 Speaking in and as a Group
Final Research Defense in Practical Research 1
Building my on-line store
Financial Affairs Training Webpage Redesign
First Name SURNAME, First Name SURNAME
Chapter 1: Introduction
Phase change Engineering Internship
Chapter 1: Introduction
Urban Audit II - Organisational set-up -
CHAPTER 4 PROPOSAL.
CHAPTER 4 PROPOSAL.
Title EECS Mid-Semester Presentation
YIIP1100 Project Management
The Research Proposal How to Write It.
CEF e-Invoicing Readiness Checker
Financial Affairs Training Website
Chapter 13 Proposals and Formal Reports
The World’s Fastest Human
Project Name Here Kick-off Date
Presentation transcript:

PMI-SVC Website Redesign Initiative November 9, 2006 John Patricio PMP MBA PMI-SVC Volunteer Information Technology Director

2 Introduction Background Solution Next Steps Conclusion

3 Background

4 Current Website (PMI-SVC) Static HTML -Lengthy change process -Out dated content -No flexibility -Expensive

5 Background Current Website (PMI-SVC) Recommendations Suggestions Future Website (PMI-SVC) Determine Solution

6 Background Current Website (PMI-SVC) Recommendations Suggestions Future Website (PMI-SVC) Determine Solution Issues High-Level Requirements Outlined Requirements Determine Solution BOD Input Data to Information Essence of the problem

7 Solution Affiniscape (Scope)  Allows us to focus on the message (not technology)  Content Management  Proven Solution (PMI-SFBAC)  Completely integrated solution Affiniscape Infrastructure and Service Phase I Content PMI-SVC (Homepage) Changed Phase I Content Future Phase Content Phase II Content

8 Solution Affiniscape (Schedule)

9 Next Steps - After Phase I Review the Chapter Site  Review entire site Analyze  How can we benefit the chapter  How can we benefit the members Submit Suggestions  Not enough Become involved  Talk to BOD, Members, friends  Consider new initiatives or projects

10 Conclusion Questions…