Ken Wyllie, CERN LHCb electronics, 3rd September 2015 1 LHCb Upgrade Electronics Meetings in 2015 (Thursday, 2pm, 13-2-005): 8 th October 3 rd December.

Slides:



Advertisements
Similar presentations
Small Form-factor Versatile Transceiver (SF-VTRx)
Advertisements

St.Petersburg- Nokia Student Business Competition Irina Pritykina & Hyun Park 1.
Power supply planning for upgrade OT  Scintillating Fibre Wilco Vink On behalf of the SciFi group 19 May 2014.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
The High Voltage, Monitoring and Control systems of the Hadronic and Electromagnetic calorimeters are essentially slow control based, and therefore are.
Versatile Link The Versatile Transceiver Towards Production Readiness Csaba Soos on behalf of Manoel Barros Marin, Stéphane Détraz, Lauri Olanterä, Christophe.
The Development of Digital Power Supply in IHEP and An APF technology based on Wavelet Analysis Guo Xiaoling, IHEP
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
VELO upgrade Front-end ECS LHCb upgrade electronics meeting 12 April 2012 Martin van Beuzekom on behalf of the VELO upgrade group Some thoughts, nothing.
University of Calcutta CBM 1 ROC Design Issues Dr. Amlan Chakrabarti, Dr. Sanatan Chattopadhyay & Mr. Suman Sau.
Design & test of SciFi FEB
Status report for TFC and ECS* LHCb Upgrade Electronics meeting F. Alessio, CERN with acknowledgements to Cairo (Caplan), Mauricio (Rivello),
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Deloitte Consulting LLP Commonwealth of Massachusetts Statewide Strategic IT Consolidation (ITC) Initiative IT Governance Subcommittee Working Session.
PS FE Board Tests LHCb - LPC Group R. Bonnefoy, G. Bohner, C. Cârloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M-L. Mercier, P. Perret, L. Royer Electronic.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
HF Front-end status Tullio Grassi 11 Dec Overview The HF FEE will change entirely, including the backplane. Only the cable plant (fiber, copper)
Improving the world through engineeringwww.imeche.orgImproving the world through engineering Member communications 2011: digital user survey with over.
Paulo Moreira On behalf of the GBT collaboration 2015 – 02 – 23
LHCb Calorimeter Upgrade Meeting – 10th September 2012 – CERN LHCb Calorimeter Upgrade Electronics: ASIC solution status E. Picatoste, D. Gascon Universitat.
Guitar Tuner ECE 5330 Embedded Systems Design Final Project Results Mike Heiny December 8, 2008.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
Clara Gaspar, December 2012 Experiment Control System & Electronics Upgrade.
CMS Pixels: Fermilab Farah Fahim, Gregory Deptuch, Jim Hoff, Alpana Shenai, Marcel Trimpl.
CHEF 2013 – 22-25th April 2013 – Paris LHCb Calorimeter Upgrade Electronics E. Picatoste (Universitat de Barcelona) On behalf of the LHCb group.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
Ken Wyllie, CERN LHCb electronics, 10th April LHCb Upgrade Electronics Meetings in 2014 (Thursday, 2pm): 12 th June 14 th August 9 th October 11.
LHCb Calorimeter Meeting – 2 nd December 2015 Calorimeter upgrade update Universitat de Barcelona, Institut de Ciències del Cosmos ICC-UB Laboratoirede.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
CARIOCA - prototype 8  One chip for next submission : September 13 th 2002  Modification on positive and negative versions  Bipolar version  With analog.
Could we abandon the HW LLT option and save money (and allow possible further improvements to the upgraded muon system)? Alessandro Cardini of behalf of.
Clara Gaspar on behalf of the ECS team: CERN, Marseille, etc. October 2015 Experiment Control System & Electronics Upgrade.
Firmware Overview and Status Erno DAVID Wigner Research Center for Physics (HU) 26 January, 2016.
Ken Wyllie, CERN Tracker ASIC, 5th July Overview of LHCb Upgrade Electronics Thanks for the invitation to Krakow!
LHCb – Calo Upgrade Meeting – 20th October 2013 – CERN Upgrade Calo FE Review Comments: Analog D. Gascon for the LHCb calo group Universitat de Barcelona.
Standard electronics for CLIC module. Sébastien Vilalte CTC
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
Ken Wyllie, CERN LHCb electronics, 8th October LHCb Upgrade Electronics Meetings in 2015 (Thursday, 2pm): 3 rd December
BLM System R2E and Availability Workshop, B.Dehning 1 Bernd Dehning CERN BE-BI
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
Current STS Readout Concept 1 FEB 8 STS-XYTER Electrical Interface SLVS/LVDS pairs/FEB ROB GBTx / VL Optical Interface 4 MM fibers /ROB DPB.
CMS HCAL optical links Eric Hazen (BU), Tullio Grassi (UMD) OptoWG - 28 Sept 2011.
ETD meeting Architecture and costing On behalf of PID group
Upgrade activities at Clermont-Ferrand
Control of ASICs via GBTx
S. Baron - BE/BI-PH-ESE GBT/VL meeting
Introduction LOI Hardware activities and GBT Simulations
New developments and inventory
UT Optical Connections
TileCal upgrade EVO meeting Demonstrator tesks
New service board The LHCb muon I2c long-line protocol using GBT-SCA and IGLOO2 LHCb Upgrade Electronics P. Fresch, V. Bocci.
LHCb electronics, 12th June 2014
LHCb electronics, 13th October 2016
Calorimeter Upgrade Meeting
Front-end digital Status
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Silicon pixel detectors and electronics for hybrid photon detectors
FEE Electronics progress
The LHCb Front-end Electronics System Status and Future Development
SACS Working Group Continual Commitment to Accreditation and Educational Improvement April 18, 2012.
Pico-second TDC Schedule & Production
Presentation transcript:

Ken Wyllie, CERN LHCb electronics, 3rd September LHCb Upgrade Electronics Meetings in 2015 (Thursday, 2pm, ): 8 th October 3 rd December Mailing list: Go to egroups.cern.ch, search for lhcb-upgrade-electronics ALSO: cern-electronics group has a lot of activity

Ken Wyllie, CERN LHCb electronics, 3rd September Common components Updated version of GBTX manual Many small (important) details added Stay tuned for updates & give feedback Procurement on-going for: GBTXs: wafers delivered, pre-production about to start VTTx, VTRx, DC-DCs according to plan VLDB + sundries: under test now….. Coming soon But please note current shortage of VTRx…… alternative is commercial SFP+

3 GBT-SCA First version of chip: Perfect digital functionality (also at 1.2V supply) ADC is only ‘8-bit’ & suffers from radiation => re-design chip, targeting end 2015 => current chip can be used for prototyping LHCb goal: test all front-end ASICs with GBT-SCA before its final submission Firmware/software: see talk later Use system with miniDAQ + VLDB in Building 14 VeloVeloPix does not communicate with SCA UTSALT I2C already tested RICHCLARO SPI already tested: levels to be decided SciFiPACIFIC I2C to be tested CaloICECAL SPI to be tested (via FPGA?) MuonnSYNC I2C/SPI to be tested LHCb electronics, 3rd September 2015