L. Greiner 1PXL Detector Progress – July 2013 STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming Sun,

Slides:



Advertisements
Similar presentations
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
STAR Heavy Flavor Tracker
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
L. Greiner1SLAC Test Beam 03/17/2011 STAR LBNL Leo Greiner, Eric Anderssen, Howard Matis, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
LBNL Michal Szelezniak, Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
Research and Development for the HFT at STAR Leo Greiner BNL DAC 03/15/2006.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Status and outlook of the Medipix3 TSV project
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
L. Greiner 1HFT PXL BNL FTF– September 27, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
H. Wieman1STAR HFT CD1 Review, BNL, November 2009 STAR HFT PIXEL Detector WBS 1.2 Howard Wieman LBNL.
PXL Electronics Status update for HFT TC meeting on October 14, 2010 at BNL 1HFT TC 05/11/ LG.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
L. Greiner1IPHC-LBNL Phone Conference 05/2011 STAR IPHC-LBNL Phone Conference News and PXL sensor (Ultimate) testing at LBNL.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
1 PIXEL H. Wieman HFT CDO LBNL Feb topics  Pixel specifications and parameters  Pixel silicon  Pixel Readout uSTAR telescope tests 
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
1 The STAR Pixel Upgrade H. Wieman Heavy Quark Workshop LBNL 1-Nov-2007.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
L. Greiner 1FEE 2014 – STAR PXL Vertex Detector STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming.
L. Greiner 1St. Odile CMOS Workshop – September 6-9, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
G. Contin | The STAR Heavy Flavor Tracker (HFT) and Upgrade Plan Quark Matter 2015 – Kobe, Japan Session : Future Experimental Facilities,
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
L. Greiner 1ATLAS Workshop LBL - September, 2013 STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Investigating latchup in the PXL detector Outline: What is latchup? – the consequences and sources of latchup – techniques to reduce latchup sensitivity.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
1 HFT Wieman 11/6/ Outline  Development Status uMIMOSTAR pixel detectors uMIMOSA5 Electronic Readout uLadder mechanics uBeam pipe  Interface.
LBNL Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
L. Greiner 1Project X Physics Study, Fermilab, June 18, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
1 PIXEL H. Wieman HFT CDO LBNL Feb topics  Pixel specifications and parameters  Pixel silicon  Pixel Readout uSTAR telescope tests 
The STAR PXL detector cooling system LBNL: Eric Anderssen, Giacomo Contin, Leo Greiner, Joe Silber, Thorsten Stezelberger, Xiangming Sun, Michal Szelezniak,
Operational Experience with the STAR MAPS Vertex Detector
The STAR Heavy Flavor Tracker PXL detector readout electronics
Leo Greiner, Eric Anderssen, Howard Matis,
Presentation transcript:

L. Greiner 1PXL Detector Progress – July 2013 STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak, Chinh Vu, Howard Wieman UT at Austin Jerry Hoffman, Jo Schambach IPHC Strasburg Marc Winter CMOS group STAR PXL Detector Progress Report

2PXL Detector Progress – July 2013 L. Greiner STAR HFT Talk Outline Detector assembly, integration and installation for engineering run. Engineering Run results and lessons learned. Progress on sensor production, thinning probe testing and yield. Progress on production of final detector. Timeline for installation in run 14.

3PXL Detector Progress – July 2013 L. Greiner STAR HFT Assembling sensors into ladders – Assembly We use precision vacuum chuck fixtures to position sensors and assemble ladders. Sensors are positioned manually with butted edges. Acrylic adhesive mechanically decouples sensors from the cable and prevents CTE difference based damage. Weights taken at all assembly steps to track material and as QA. Reference pins for cable/sensor alignment

4PXL Detector Progress – July 2013 L. Greiner STAR HFT Assembling sensors into ladders – Assembly Hybrid cable with carbon fiber stiffener plate on back in position to glue on sensors. The cable reference holes are used for all aspects of assembly of ladders and sectors.

5PXL Detector Progress – July 2013 L. Greiner STAR HFT Completed PXL ladder Completed ladder in anti-static carrying box with follower and check off list.

6PXL Detector Progress – July 2013 L. Greiner STAR HFT Ladders to sectors

7PXL Detector Progress – July 2013 L. Greiner STAR HFT Ladders to sectors

8PXL Detector Progress – July 2013 L. Greiner STAR HFT Ladders to sectors Sector in optical metrology machine Sensor positions on sector are measured and related to tooling balls. After touch probe measurements, sectors are tested electrically for damage from metrology.

9PXL Detector Progress – July 2013 L. Greiner STAR HFT sectors to detector half Sectors are mounted in dovetail slots on detector half. Metrology is done to relate sector balls to each other and to kinematic mounts.

10PXL Detector Progress – July 2013 L. Greiner STAR HFT PXL detector mechanics

11PXL Detector Progress – July 2013 L. Greiner STAR HFT PXL insertion mechanics Interaction point view of the PXL insertion rails and kinematic mount points Carbon fiber rails Kinematic mounts

12PXL Detector Progress – July 2013 L. Greiner STAR HFT PXL insertion mechanics PXL detector half with complete insertion mechanism

13PXL Detector Progress – July 2013 L. Greiner STAR HFT Engineering Run Left detector half being inserted Right detector half being inserted

14PXL Detector Progress – July 2013 L. Greiner STAR HFT Engineering Run PXL eng detector inserted, cabled and working in 1 day access

15PXL Detector Progress – July 2013 L. Greiner STAR HFT PXL engineering run statistics Installation of 3 sector engineering detector on May 8, Run ended June 10, GeV p-p running 2 weeks to get detector integrated with DAQ, slow controls, trigger, online monitoring, offline event processing. Set up initial thresholds and bias settings. PXL tracking data requires low multiplicity. Data taken during short (~1 hr) periods at the end of RHIC fills. Approximately 10 M events in low multiplicity environment. (trigger >10 multiplicity in TOF) ~600 GB of low multiplicity PXL data. ~ 180 GB high multiplicity PXL data (taken late in run at high prescale value to minimize PXL data rate)

16PXL Detector Progress – July 2013 L. Greiner STAR HFT Installed sectors Measured ~ 1 week after first beam. There were only 5 bad sensors before installation.

17PXL Detector Progress – July 2013 L. Greiner STAR HFT Offline event displays Hit pattern on sensor over one run Possible heat issue?

18PXL Detector Progress – July 2013 L. Greiner STAR HFT Raw hits/sensor For 2 sectors Inner Ladder (1) shows ~ 4 times as many hits as outer ladders. Offline event displays

19PXL Detector Progress – July 2013 L. Greiner STAR HFT Sector hit display Correlation plot for TPC track pointing to outer PXL ladder (shows pointing resolution of un-calibrated TPC) Offline event displays

20PXL Detector Progress – July 2013 L. Greiner STAR HFT Latch-up and SEU (high luminosity) DATA SET 1: June 8, 2013 (10 hours) DATA SET 2: June 9, 2013 (5hrs) only sector 2 and 7, luminosity was only ⅛ of the nominal value; DATA SET 3: Third data set: June 9, 2013 (4hrs) only sector 2 and 7, sensors in pattern mode SetLadderSector 2Sector 4Sector 7 LU cnt Set 1L L2010 L3610 L4000 Set 2L1803 L2000 L37600 L4000 Set 3L13105 L2200 L3700 L4001 Latch-up Data Summary Latch-up events were observed only on the digital power supply (no latch ups on the analog power supply nor in the MTB.)

21PXL Detector Progress – July 2013 L. Greiner STAR HFT Summary of SEU count in DATA SET 1: Latch-up and SEU These are only JTAG register errors. Memory errors tested by pattern mode sensor output are still under analysis. SetLadderSector 2Sector 4Sector 7 SEU cnt Set 1L L2104 L3042 L4354 SEU is measured as corrupted sensor JTAG configuration registers and as corrupted data from pattern registers.

22PXL Detector Progress – July 2013 L. Greiner STAR HFT Selected Lessons Learned Mechanical Sector mechanical conflict in the inner ladder driver boards. Fixturing and sector tube fabrication process. Electrical Power issues (already discussed) Diode temperature measurement.

23PXL Detector Progress – July 2013 L. Greiner STAR HFT Sector Driver board conflict Driver board mechanical conflict. We ran with sectors in non adjacent positions for the engineering run. Sector tube and inner driver board have been re- designed. Inner ladder boards are now all low profile components. Sector tubes made smaller to increase inner layer radius to beamline. (~3mm) new

24PXL Detector Progress – July 2013 L. Greiner STAR HFT Sector tubes and assembly fixturing Sector tube steps – inner radius is too shallow and stress fractures the sensor in the upper corner during the gluing process. Fixturing for assembling ladders to sectors had an oversized cutout for surface component clearance. This gave an unsupported section at the end of ladder with the edge of the support behind the edge of the last sensor. This would fracture the sensor during the gluing process.

25PXL Detector Progress – July 2013 L. Greiner STAR HFT Diode temperature measurement DACs Buffers Temperature sensor DACs7mA Analog buffers18mA Each sensor has a integrated temperature sensing diode. The diode is located as shown and is in a “hot” area of the sensor. The cathode is brought out to a bonding pad whilst the anode is internally wired to sensor ground.

26PXL Detector Progress – July 2013 L. Greiner STAR HFT Diode temperature measurement The response is ~ 2 mV / degree C Silicon bandgap temperature sensor: Problem: The ground potential at the various locations of the ladder fluctuates depending on the current draw of the sensors on the ladder which depends on the occupancy and other factors. The effect of this fluctuation is larger than the expected diode response. Solution: We measure the temperature using a 100 µA current source and a I 2 C ADC on the MTB for 2 sensors per ladder. We will modify the circuitry (one wire patch) to allow us to measure the ground potential on the sensor being measured. This will result in only measuring one temperature per ladder unless we add another ADC to the MTB and another patch wire. Suggestion for future: bring both anode and cathode of the diode to bonding pads for flexibility.

27PXL Detector Progress – July 2013 L. Greiner STAR HFT Other issues Tracking with PXL hit points is not yet completed. TPC calibration needs to be done to allow for tracking and efficiency measurements. Possible radiation damage to sensors, under investigation. (beam excursions / dumps after installation could have damaged sensors as some stopped working after the detector was inserted) The automated threshold setting scripts worked but we need to update this for the full detector. We discovered some sensors that had problems, even when probe tested. We need to carefully map probe testing error modes and properly propagate this to the selection process. Efficiency measurements based on integrating the correlation function plots is a work in progress. The method is approximate at best and currently yields 60-70% efficiency. Some oscillations were seen with the remote sense voltage regulators for the ladders before installation (despite working fine at LBNL). We modified to local sense but this may have caused other problems (low supply voltage?, VCLP,) This, along with current draw, will be investigated after the detector returns to LBNL.

28PXL Detector Progress – July 2013 L. Greiner STAR HFT In progress From Hao Qiu on July 4, 2013

29PXL Detector Progress – July 2013 L. Greiner STAR HFT Progress in production Sensor yield Aluminum cable ladders Status of production readiness Schedule for production

30PXL Detector Progress – July 2013 L. Greiner STAR HFT Mechanical thinning yield for DRIE Batch wafer # good sensorspercent comment dirty Being probe tested Mixed/dirty Wafer released early, 70 um thick Wafer released early, 70 um thick Entire wafer lost Wafer released early, 70 um thick Wafer released early, 70 um thick Mixed/dirty clean mixed clean Mixed Mixed Mixed Mixed Mixed mixed mixed mixed mixed mixed mixed mixed mixed We have been working with Aptek industries for back thinning and polishing of DRIE trenched wafers. These are the results of the first batch of 25 wafers from AMS. Visual microscope inspection for chips, cracks, etc. The processing method for DRIE wafers is being fine tuned, but appears to be good now. The yield for the most recent batch thinning of 13 wafers was 99.2 %. We expect this result to be representative for further processing. The cost of thinning 25 wafers whilst preserving wafer position information is $6375 ($1200 for preserving wafer position) Overall yield 87%

31PXL Detector Progress – July 2013 L. Greiner STAR HFT PXL Sensor selection Automated interface to a database (18 config + 68 result parameters) Sensors are binned according to performance Example of wafer maps for Ultimate-2 wafers with DRIE processing (ion etching) ~65% - 70% yield

32PXL Detector Progress – July 2013 L. Greiner STAR HFT Aluminum cable ladder First Al cables from CERN PCB shop. Needed rework to allow wire bonding. Validated through bonding, soldering and resistance (voltage drop) testing to allow fabrication of batch to meet schedule. The first cable loaded with sensors is shown below. Testing is beginning. Based on schedule, only the inner ladders will be fabricated on Al conductor cables for the run 14 detector.

33PXL Detector Progress – July 2013 L. Greiner STAR HFT Status of PXL production parts Ladders 25 wafers of sensors in hand 40 Cu cables loaded in hand 100 outer driver boards in hand 40 inner driver boards arrive in July 20 Al conductor cables ship July 1 Fine wire cables 25 in hand – production in progress MTBs 10 in hand Possible minor modification Full production in August timeframe. Non-critical path

34PXL Detector Progress – July 2013 L. Greiner STAR HFT Status of PXL production parts VHDCI Cables All cables in hand Half modified to be non magnetic PXL (SSD) motherboard 5 production motherboards in hand. Design validated in engineering run Tested for use with SSD. Order balance in the next 2 weeks.

35PXL Detector Progress – July 2013 L. Greiner STAR HFT Status of PXL production parts Sector tubes Re-design in progress Fabrication in August timeframe D-tubes Insertion mechanics Minor modifications to existing New pieces in August timeframe The effort is geared to the first production detector to be installed for run 14. The spare detector will follow. Other pieces – power supplies, TCD interfaces, control PCs, etc. are in hand.

36PXL Detector Progress – July 2013 L. Greiner STAR HFT Simplified Production Schedule March 2013: –Deliver the engineering run detector to BNL.  installed in May –Aluminum conductor cable fabrication begins.  begun in June April 2013: –Re-design as needed for mechanical and/or electrical changes based on eng run experience.  –Fabricate parts for mechanical. – in progress –Place RDO board orders. – non critical path, to be done in the next 2 weeks –Production sensors arrive, test and send out for thinning and dicing.  May-June 2013: –Production dicing and thinning.  –Production ladder assembly. in progress –Final electronics fabricated – non critical path, in progress –Mechanical assembly of detector parts. – now scheduled for July - August July-August 2013: –Sector assembly – now scheduled for August-September –Metrology - now scheduled for September –Final detector assembly – Now scheduled for late September September 2013: –Delivery of primary PXL detector – now scheduled for early October

37PXL Detector Progress – July 2013 L. Greiner STAR HFT end

38PXL Detector Progress – July 2013 L. Greiner STAR HFT Assembling sensors into ladders – Assembly Early optimization Testing results (ladder with 2 bad sensors) Assembled ladder on FR-4 handling piece Sensor noise performance only minimally degraded with all sensors running

39PXL Detector Progress – July 2013 L. Greiner STAR HFT Offline event displays Hits per cluster 3-4 (Measured 2.5 hits/cluster for normal incidence beam test 120 GeV pions.)