1 1 Economic Plantwide Control, July 2015 ECONOMIC PLANTWIDE CONTROL Sigurd Skogestad Dept. of Chemical Engineering, Norwegian University of Science and.

Slides:



Advertisements
Similar presentations
1 CONTROLLED VARIABLE AND MEASUREMENT SELECTION Sigurd Skogestad Department of Chemical Engineering Norwegian University of Science and Technology (NTNU)
Advertisements

1 Outline Control structure design (plantwide control) A procedure for control structure design I Top Down Step 1: Degrees of freedom Step 2: Operational.
1 M. Panahi ’Plantwide Control for Economically Optimal Operation of Chemical Plants’ Plantwide Control for Economically Optimal Operation of Chemical.
Plantwide process control with focus on selecting economic controlled variables («self- optimizing control») Sigurd Skogestad, NTNU 2014.
Practical plantwide process control Sigurd Skogestad, NTNU Thailand, April 2014.
1 Feedback: The simple and best solution. Applications to self-optimizing control and stabilization of new operating regimes Sigurd Skogestad Department.
GHGT-8 Self-Optimizing and Control Structure Design for a CO 2 Capturing Plant Mehdi Panahi, Mehdi Karimi, Sigurd Skogestad, Magne Hillestad, Hallvard.
Optimal operation of distillation columns and link to control Distillation Course Berlin Summer Sigurd Skogestad. Part 3.
1 Coordinator MPC for maximization of plant throughput Elvira Marie B. Aske* &, Stig Strand & and Sigurd Skogestad* * Department of Chemical Engineering,
Part 3: Regulatory («stabilizing») control
1 Outline Skogestad procedure for control structure design I Top Down Step S1: Define operational objective (cost) and constraints Step S2: Identify degrees.
1 Plantwide control: Towards a systematic procedure Sigurd Skogestad Department of Chemical Engineering Norwegian University of Science and Tecnology (NTNU)
1 Feedback control theory: An overview and connections to biochemical systems theory Sigurd Skogestad Department of Chemical Engineering Norwegian University.
Outline Skogestad procedure for control structure design I Top Down
Practical plantwide process control Part 1
1 1 V. Minasidis et. al. | Simple Rules for Economic Plantwide ControlSimple Rules for Economic Plantwide Control, PSE & ESCAPE 2015 SIMPLE RULES FOR ECONOMIC.
1 Structure of the process control system Benefits from MPC (Model Predictive Control) and RTO (Real Time Optimization) Sigurd Skogestad Department of.
1 AN INTRODUCTION TO PLANTWIDE CONTROL Sigurd Skogestad Department of Chemical Engineering Norwegian University of Science and Tecnology (NTNU) Trondheim,
1 A SYSTEMATIC APPROACH TO PLANTWIDE CONTROL Sigurd Skogestad Department of Chemical Engineering Norwegian University of Science and Tecnology (NTNU) Trondheim,
1 A Plantwide Control Procedure Applied to the HDA Process Antonio Araújo and Sigurd Skogestad Department of Chemical Engineering Norwegian University.
1 Practical plantwide process control. Extra Sigurd Skogestad, NTNU Thailand, April 2014.
Plantwide process control Introduction
1 Outline About Trondheim and myself Control structure design (plantwide control) A procedure for control structure design I Top Down Step 1: Degrees of.
1 E. S. Hori, Maximum Gain Rule Maximum Gain Rule for Selecting Controlled Variables Eduardo Shigueo Hori, Sigurd Skogestad Norwegian University of Science.
1 Feedback: The simple and best solution. Applications to self-optimizing control and stabilization of new operating regimes Sigurd Skogestad Department.
1 Active constraint regions for economically optimal operation of distillation columns Sigurd Skogestad and Magnus G. Jacobsen Department of Chemical Engineering.
Sigurd Skogestad Department of Chemical Engineering
Integrated Process Networks: Nonlinear Control System Design for Optimality and Dynamic Performance Michael Baldea a,b and Prodromos Daoutidis a a University.
1 A SYSTEMATIC APPROACH TO PLANTWIDE CONTROL Sigurd Skogestad Department of Chemical Engineering Norwegian University of Science and Tecnology (NTNU) Trondheim,
1 Plantwide control: Towards a systematic procedure Sigurd Skogestad Department of Chemical Engineering Norwegian University of Science and Tecnology (NTNU)
1 Outline Control structure design (plantwide control) A procedure for control structure design I Top Down Step 1: Degrees of freedom Step 2: Operational.
1 Selv-optimaliserende regulering Anvendelser mot prosessindustrien, biologi og maratonløping Sigurd Skogestad Institutt for kjemisk prosessteknologi,
1 Part 3: Regulatory («stabilizing») control Inventory (level) control structure –Location of throughput manipulator –Consistency and radiating rule Structure.
1 From process control to business control: A systematic approach for CV-selection Sigurd Skogestad Department of Chemical Engineering Norwegian University.
1 Self-optimizing control From key performance indicators to control of biological systems Sigurd Skogestad Department of Chemical Engineering Norwegian.
1 ECONOMIC PLANTWIDE CONTROL: Control structure design for complete processing plants Sigurd Skogestad Department of Chemical Engineering Norwegian University.
1 PLANTWIDE CONTROL Identifying and switching between active constraints regions Sigurd Skogestad and Magnus G. Jacobsen Department of Chemical Engineering.
1 Feedback: The simple and best solution. Applications to self-optimizing control and stabilization of new operating regimes Sigurd Skogestad Department.
1 II. Bottom-up Determine secondary controlled variables and structure (configuration) of control system (pairing) A good control configuration is insensitive.
1 Feedback Applications to self-optimizing control and stabilization of new operating regimes Sigurd Skogestad Department of Chemical Engineering Norwegian.
1 Plantwide process control Introduction Sigurd Skogestad, NTNU May 2014.
1 A SYSTEMATIC APPROACH TO PLANTWIDE CONTROL ( ) Sigurd Skogestad Department of Chemical Engineering Norwegian University of Science and Tecnology.
Control Structure Design: New Developments and Future Directions Vinay Kariwala and Sigurd Skogestad Department of Chemical Engineering NTNU, Trondheim,
1 Outline About Trondheim and myself Control structure design (plantwide control) A procedure for control structure design I Top Down Step 1: Degrees of.
1 Effective Implementation of optimal operation using Self- optimizing control Sigurd Skogestad Institutt for kjemisk prosessteknologi NTNU, Trondheim.
1 Self-optimizing control From key performance indicators to control of biological systems Sigurd Skogestad Department of Chemical Engineering Norwegian.
1 Combination of Measurements as Controlled Variables for Self-optimizing Control Vidar Alstad † and Sigurd Skogestad Department of Chemical Engineering,
1 PLANTWIDE CONTROL Sigurd Skogestad Department of Chemical Engineering Norwegian University of Science and Tecnology (NTNU) Trondheim, Norway August/September.
1 A SYSTEMATIC APPROACH TO PLANTWIDE CONTROL ( ) Sigurd Skogestad Department of Chemical Engineering Norwegian University of Science and Tecnology.
Control strategies for optimal operation of complete plants Plantwide control - With focus on selecting economic controlled variables Sigurd Skogestad,
Coordinator MPC with focus on maximizing throughput
A systematic procedure for economic plantwide control
Economic Plantwide Control:
Advanced process control with focus on selecting economic controlled variables («self-optimizing control») Sigurd Skogestad, NTNU 2016.
Sigurd Skogestad Department of Chemical Engineering
Changing between Active Constraint Regions for Optimal Operation: Classical Advanced Control versus Model Predictive Control Adriana Reyes-Lúa, Cristina.
Plantwide control: Towards a systematic procedure
PLANTWIDE CONTROL Sigurd Skogestad Department of Chemical Engineering
CONTROLLED VARIABLE AND MEASUREMENT SELECTION
Outline Skogestad procedure for control structure design I Top Down
Outline Control structure design (plantwide control)
Perspectives and future directions in control structure selection
Plantwide control: Towards a systematic procedure
Example regulatory control: Distillation
Plantwide control: Towards a systematic procedure
Example regulatory control: Distillation
Example regulatory control: Distillation
Part 3: Regulatory («stabilizing») control
Outline Control structure design (plantwide control)
Presentation transcript:

1 1 Economic Plantwide Control, July 2015 ECONOMIC PLANTWIDE CONTROL Sigurd Skogestad Dept. of Chemical Engineering, Norwegian University of Science and Technology, Trondheim, Norway

2 2 Trondheim, Norway

3 3 Trondheim Oslo UK NORWAY DENMARK GERMANY North Sea SWEDEN Arctic circle

4 4 Aurora Borealis = Northern Lights Winter: No sun, but sometimes Tromsø

5 5 NTNU,Trondheim people students

6 6 OUTLINE INTRODUCTION PROCEDURE FOR ECONOMIC PLANTWIDE CONTROL REACTOR-SEPARATOR-RECYCLE CASE STUDY PRACTICAL RULES DYNAMIC SIMULATIONS CONCLUSIONS ECONOMIC PLANTWIDE CONTROL

7 7 Example of systems we want to operate optimally Process plant –minimize J=economic cost Runner –minimize J=time «Green» process plant –Minimize J=environmental impact (with given economic cost) General multiobjective: –Min J (scalar cost, often $) –Subject to satisfying constraints (environment, resources) Optimal operation (economics)

8 8 Theory: Optimal operation Objectives Present state Model of system Theory: Model of overall system Estimate present state Optimize all degrees of freedom Problems: Model not available Optimization complex Not robust (difficult to handle uncertainty) Slow response time Process control: Excellent candidate for centralized control (Physical) Degrees of freedom CENTRALIZED OPTIMIZER

9 9 Practice: Engineering systems Most (all?) large-scale engineering systems are controlled using hierarchies of quite simple controllers –Large-scale chemical plant (refinery) –Commercial aircraft 100’s of loops Simple components: on-off + PI-control + nonlinear fixes + some feedforward Same in biological systems

10 NEED A SYSTEMATIC APPROACH Famous critique article on process control by Foss (1973): The central issue to be resolved... is the determination of control system structure. Which variables should be measured, which inputs should be manipulated and which links should be made between the two sets? There is more than a suspicion that the work of a genius is needed here, for without it the control configuration problem will likely remain in a primitive, hazily stated and wholly unmanageable form. The gap is present indeed, but contrary to the views of many, it is the theoretician who must close it. HOW DESIGN THE CONTROL SYSTEM FOR A COMPLETE PLANT ?

11 MAIN OBJECTIVES FOR A CONTROL SYSTEM 1.Economics: Implementation of close-to-optimal economic operation 2.Regulation: Stable operation ARE THESE OBJECTIVES CONFLICTING? Usually NOT –Different time scales Stabilization fast time scale –Stabilization doesn’t “use up” any degrees of freedom Reference value (setpoint) available for layer above But it “uses up” part of the time window (frequency range)

12 PRACTICAL OPERATION: HIERARCHICAL STRUCTURE Manager Process engineer Operator/RTO Operator/”Advanced control”/MPC PID-control u = valves Our Paradigm CV1

13 Decompose the structural decisions into two parts: Top-down part: Find a slow-time-scale supervisory control structure that achieves a close-to-optimal economic operation. –CV1 = Economic CVs CV = Controlled variable Figure 1: Typical control hierarchy in a chemical plant ECONOMIC PLANTWIDE CONTROL PROCEDURE

14 Decompose the structural decisions into two parts: Top-down part, which attempts to find a slow-time-scale supervisory control structure that achieves a close-to-optimal economic operation. Bottom - up part: Design a robust fast- time-scale regulatory control layer, which stabilizes the plant and follows the setpoints from the supervisory layer. –CV2 = stabilizing CVs Figure 1: Typical control hierarchy in a chemical plant ECONOMIC PLANTWIDE CONTROL PROCEDURE

15 I.Top Down Step S1: Define operational objectives (optimal economic operation) –Cost function J (to be minimized) –Operational constraints Step S2: Identify degrees of freedom (MVs) and optimize for expected disturbances Step S3: Select primary controlled variables CV 1 (economic CVs) Step S4: Where to set the production rate? (TPM) II.Bottom Up Step S5: Regulatory / stabilizing control (PID layer) –What more to control CV 2 (stabilizing CVs)? –Pairing of inputs and outputs Step S6: Supervisory control (MPC layer) Step S7: Real-time optimization (Do we need it?) ECONOMIC PLANTWIDE CONTROL STEPWISE PROCEDURE (Skogestad, 2004)

16 ECONOMIC PLANTWIDE CONTROL Top-down part (mainly steady-state): : Step S1: Define the operational objectives (economics) and constraints. Identify A scalar cost function J [$/s] J = cost feed + cost energy – value products operational constraints disturbances d and their ranges Two main cases (modes/regions) depending on market conditions: –Mode 1. Given feedrate –Mode 2. Maximum production (max feedrate )

17 ECONOMIC PLANTWIDE CONTROL Top-down part (mainly steady-state): : Step S2: Determine the degrees of freedom and find the steady-state optimal operation. Must optimize for the range of expected disturbances d Requires a rigorous model (usually steady-state) POTENSIALLY VERY TIME CONSUMING Main goal: Identify the ACTIVE CONSTRAINTS

18 ECONOMIC PLANTWIDE CONTROL Top-down part (mainly steady-state): : Step S3: Select primary (economic) controlled variables (CV 1 ) Identify the candidate measurements y m and from these select a set CV 1 (one CV for each steady-state degree of freedom): Control the active constraints! For the remaining unconstrained degrees of freedom: Control “self-optimizing” variables Figure 1: Typical control hierarchy in a chemical plant

19 “Self-optimizing” variables: Controlled variables (CV1), which when kept at constant setpoints, indirectly achieve close-to-optimal operation in spite of unknown disturbances Minimize the need for re-optimization by moving optimization into the control layer

20 –Cost to be minimized, J=T –One degree of freedom (u=powe) –Disturbance (d) = hill or wind –What should we control? Optimal operation - Runner Optimal operation of runner

21 1. Optimal operation of Sprinter –100m. J=T –Active constraint control: Maximum speed (”no thinking required”) CV = power (at max) Optimal operation - Runner

22 40 km. J=T What should we control? CV=? Unconstrained optimum Optimal operation - Runner 2. Optimal operation of Marathon runner u=power J=T u opt

23 Any self-optimizing variable (to control at constant setpoint)? c 1 = distance to leader of race c 2 = speed Optimal operation - Runner Self-optimizing control: Marathon (40 km) CV=speed J=T d=hill CV opt Loss

24 Any self-optimizing variable (to control at constant setpoint)? c 1 = distance to leader of race c 2 = speed c 3 = heart rate c 4 = level of lactate in muscles Optimal operation - Runner Self-optimizing control: Marathon (40 km) CV=heart rate J=T d=hill CV opt

25 Conclusion Marathon runner c = heart rate select one measurement CV = heart rate is good “self-optimizing” variable Simple and robust implementation Disturbances are indirectly handled by keeping a constant heart rate May have infrequent adjustment of setpoint (c s ) Optimal operation - Runner c=heart rate J=T c opt

26 ECONOMIC PLANTWIDE CONTROL Top-down part (mainly steady-state): Step S4: Select the location of throughput manipulator (TPM) –Where should the plant’s “gas pedal” (TPM) be located ? Usually one for each plant The location of the TPM is a dynamic issue but has an economic impact –Answer: Often locate TPM at the feed, but to maximize throughput (Mode 2), should be located close the production bottleneck to avoid “snowballing”, locate inside recycle loop

27 ECONOMIC PLANTWIDE CONTROL Bottom-up part (mainly dynamic): Step S5: Select the control structure for the Regulatory Control layer –Q 1 : What variables (CV2) should be controlled to stabilize the plant operation ? –A 1 : Select “drifting” process variables CV 2 = H 2 y m that need to be controlled to ensure safe and stable operation e.g. levels, pressures, temperatures. –Q 2 : How should CV 2 be controlled (pairing)? –A 2 : Controllability analysis Figure 1: Typical control hierarchy in a chemical plant

28 ECONOMIC PLANTWIDE CONTROL Bottom-up part (mainly dynamic): Step S6: Select the control structure for the Supervisory (Advanced) Control layer Objectives –Control economic controlled variables CV 1 –Look after regulatory layer (avoid saturation of u D ) Two alternatives: 1.Multivariable controller (e.g. MPC) 2.Mix of various “advanced” controllers including PID, selectors, feedforward…

29 ECONOMIC PLANTWIDE CONTROL Bottom-up part (mainly dynamic): Step S7: Select the control structure for the Process Optimization layer (RTO) –How should the optimal setpoints for CV 1 be updated ? A good choice of controlled variables (CV1) may remove the need for this layer. Figure 1: Typical control hierarchy in a chemical plant

30 REACTOR-SEPARATOR- RECYCLE CASE STUDY (Luyben) Feed F 0 contains mostly A. Reactor (CSTR) –1 st order A -> B reaction –Constant temperature Separator (distillation column) –Distillate D (mostly A ): recycled back to CSTR. –Bottom product B (mostly B ) –22 stages –Constant pressure –Constant relative volatility Reactor-separator-recycle process F0F0 B D

31 CASE STUDY: Step S1 Definition of optimal operation: Given feedrate (Mode 1) J = cost feed + cost energy – value products J = c F F 0 + c V V B – c B B Since F 0 = B is given, this simplifies to min J = V B Reactor-separator-recycle process

32 CASE STUDY: Step S1 Definition of optimal operation: Given feedrate (Mode 1) J = cost feed + cost energy – value products J = c F F 0 + c V V B – c B B Since F 0 = B is given, this simplifies to min J = V B Operational constraints –M R ≤ 2800 kmol –V B ≤ 50 kmol/min –x B ≤ (max. 1.05% A in product) Reactor-separator-recycle process

33 CASE STUDY: Step S2 Step S2: Determine the degrees of freedom and find the steady-state optimal operation. Given pressure and reactor temperature: 6 dynamic manipulated variables (valves) u D = {F 0, V B, D, B, F, L T } M D and M B have no steady-state effect and need to be controlled Steady state and given feed F 0 : 3 steady-state degrees of freedom Step S3: Must find 3 economic variables to control (CV1) ??? Reactor-separator-recycle process

34 11 PRACTICAL RULES (TO HELP WITH THE REMAINING STEPS)

35 PRACTICAL RULES for Step S3 Rule 1: Control the active constraints –In general, process optimization is required to determine the active constraints. but a good engineer can often guess the active constraints. Step S3: Selection of economic CV1

36 PRACTICAL RULES for Step S3 Rule 1: Control the active constraints –In general, process optimization is required to determine the active constraints. but a good engineer can often guess the active constraints Rule 1A: The purity constraint of the valuable product is always active and should be controlled. –This is to maximize valuable product and avoid product “give away”. Step S3: Selection of economic CV1

37 CASE STUDY Rule 1: Control the active constraints Rule 1A: The purity constraint of the valuable product is always active and should be controlled. Case study: Both M R (max) and x B (purity valuable product) are active. Need to find one more CV1 Reactor-separator-recycle process Practical rules for Step S3: Selection of economic CV 1 J=V B u = L T Unconstrained optimum

38 PRACTICAL RULES for Step S3 Rule 2: (for remaining unconstrained steady-state degrees of freedom, if any): Control “self-optimizing” variables. –The two main properties of a good “self-optimizing” variable are: Ιts optimal value is insensitive to disturbances –so F = ΔCV 1,opt /Δd is small Ιt is sensitive to the plant inputs (= “flat optimum”) –so the process gain G = ΔCV 1 /Δu is large Step S3: Selection of economic CV 1

39 PRACTICAL RULES for Step S3 Rule 2: (for remaining unconstrained steady-state degrees of freedom, if any): Control the “self-optimizing” variables. –The two main properties of a good “self-optimizing” variable are: Ιts optimal value is insensitive to disturbances (such that F = ΔCV 1,opt /Δd is small) Ιt is sensitive to the plant inputs (so the process scaled gain G = ΔCV 1 /Δu is large). The following rule combines the two desired properties: Rule 2A: Select the set CV 1 such that the “ratio” G -1 F is minimized. –This rule is often called the “Maximum scaled gain rule”. Step S3: Selection of economic CV 1

40 CASE STUDY: Self-optimizing variables Rule 2: (for remaining unconstrained steady-state degrees of freedom, if any): Control the “self-optimizing” variables. –The two main properties of a good “self- optimizing” variable are: Ιts optimal value is insensitive to disturbances (such that F = ΔCV 1,opt /Δd is small) Ιt is sensitive to the plant inputs (so the process scaled gain G = ΔCV 1 /Δu is large). The following rule shows how to combine the two desired properties: Rule 2A: Select the set CV 1 such that the ratio G -1 F is minimized. –This rule is often called the “Maximum scaled gain rule”. Practical rules for Step S3: Selection of economic CV 1 “Sensitive variables” (with large scaled gain): Some good candidates for CV 1,SOC : {L T /F, x D }.

41 PRACTICAL RULES for Step S3 Rule 3: (for remaining unconstrained steady-state degrees of freedom, if any): Never try to control the cost function J (or any other variable with min or max at the optimal point). 1.The cost function J has no sensitivity to the plant inputs so G = 0, (which violates Rule 2A) Step S3: Selection of economic CV 1

42 PRACTICAL RULES for Step S3 Rule 3: (for remaining unconstrained steady-state degrees of freedom, if any): Never try to control the cost function J (or any other variable with min or max at the optimal point). 1.The cost function J has no sensitivity to the plant inputs at the optimal point and so G = 0, which violates Rule 2A. 2.Potential infeasibility : Step S3: Selection of economic CV 1 J u

43 CASE STUDY Rule 3: (for remaining unconstrained steady-state degrees of freedom, if any): Never try to control the cost function J (or any other variable that reaches a min or max at the optimal point). Case study: Do not keep V B constant (but may be used as a TPM) Practical rules for Step S3: Selection of economic CV 1

44 PRACTICAL RULES for Step S4 Rule 4: Locate the TPM close to the process bottleneck. –This is to be able to maximize the production rate (Mode 2) –Gives a simpler transition between mode 1 (given feed) and mode 2 (Process bottleneck is defined as the last constraint to become active when increasing the throughput rate.) Rule 5 : (for processes with recycle) Locate the TPM inside the recycle loop. –This is to avoid “overfeeding” the recycle loop = “snowballing” (Luyben) Step S4: Location of throughput manipulator (TPM)

45 CASE STUDY Rule 4: Locate the TPM close to the process bottleneck. Rule 5: (for processes with recycle) Locate the TPM inside the recycle loop. According to Rules 4 and 5 the best candidate for TPM location is V B. Practical rules for Step S4: Location of throughput manipulator (TPM)

46 PRACTICAL RULES for Step S5 Rule 6: Arrange the inventory control loops (for level, pressures, etc.) around the TPM location according to the radiation rule (Georgakis) –This ensures “local consistency” i.e. all inventories are controlled by their local in or outflows. Step S5: Structure of regulatory control layer TPM

47 PRACTICAL RULES for Step S5 Rule 7: Select “sensitive/drifting” variables as controlled variables CV 2 for regulatory control. –Typically include inventories (levels and pressures), reactor temperature, or a sensitive temperature in a distillation column. Step S5: Structure of regulatory control layer

48 PRACTICAL RULES for Step S5 Rule 8: Economically important active constraints (CV 1 ) should be selected as CVs (CV 2 ) in the regulatory layer. –Economic variables CV 1 are generally controlled in the supervisory layer. But moving CV 1 to a faster layer may ensure tighter control with a smaller back-off. Step S5: Structure of regulatory control layer

49 PRACTICAL RULES for Step S5 Rule 9: (“Pair-close” rule): The pairings should be selected such that, effective delays and loop interactions are minimal. Step S5: Structure of regulatory control layer

50 PRACTICAL RULES for Step S5 Rule 10: Avoid using MVs that may optimally saturate (at steady state) to control CVs in CV 2. –The reason is that we want to avoid re-configuring the regulatory control layer. To follow this rule, one needs to consider also other regions of operation than the nominal. Step S5: Structure of regulatory control layer

51 CASE STUDY Rule 7: Select “sensitive/drifting” variables as controlled variables CV 2 for regulatory control. –Typically include inventories (levels and pressures), reactor temperature, or a sensitive temperature in a distillation column Rule 6: Arrange the inventory control loops (for level, etc.) around the TPM location according to the radiation rule. Rule 8: Economically important active constraints (CV1) should be selected as CVs (CV 2 ) in the regulatory layer Rule 9: (“Pair-close” rule): The pairings should be selected such that, effective delays and loop interactions are minimal. Rule 10: Avoid using MVs that may optimally saturate (at steady state) to control CVs in CV 2. Practical rules for Step S5: Structure of regulatory control layer

52 PRACTICAL RULES for Step S6 Rule 11: MVs that may optimally saturate (at steady state) should be paired with the subset of CV 1 that may be given up. –This rule applies for cases when we use decentralized control in the supervisory layer and we have changes in active constraints The idea is to avoid reconfiguration of loops. This rule should be considered together with Rule 10. Step S6: Structure of supervisory control layer

53 CASE STUDY Step S6: Structure of supervisory control layer Two remaining degrees of freedom –LT–LT –F–F Have two remaining variables to control (CV1): –Active constraint x B –Self-optimizing variable x D

54 CASE STUDY: Final control structure

55 DYNAMIC SIMULATIONS Initially the TPM is ramped to achieve 40% increase in fresh feed (F 0 ), starting at 400 min till 600 min. Later the TPM is ramped down to its original value, starting at 1800 min till 2000 min. Important dynamic issue: TPM location TPM = Throughput manipulator

56 Proposed structure: TPM at reboiler duty (V B ) TPM = Throughput manipulator

57 Alternative structure: TPM at feed (F0)

58 Alternative structure: TPM at the product stream – B

59 Alternative structure: TPM at the reactor effluent – F Needs longer ramping time to be feasible

60 Alternative structure: TPM at the recycle stream – D

61 RESULTS: TPM at feed – F0 Figure 5: TPM at the feed – F 0. Self-optimizing CV – L T /F.

62 RESULTS: TPM at the product stream – B Figure 14: TPM at the product stream – B. Self-optimizing CV – L T /F.

63 Alternative structure: TPM at the product stream – B Figure 12: TPM at the product stream – B. L T - constant.

64 Figure 3: TPM at the feed - F 0. L T – constant. RESULTS: TPM at feed – F 0

65 RESULTS: TPM at the reactor effluent – F Figure 4:

66 RESULTS: TPM at the reactor effluent – F Figure 6:

67 RESULTS: TPM at reboiler’s steam supply – V B Figure 6: TPM at reboiler’s steam supply – V B. L T – constant.

68 RESULTS: TPM at reboiler’s steam supply – V B Figure 8: TPM at reboiler’s steam supply – V B. Self-optimizing CV – L T /F.

69 RESULTS: TPM at the recycle stream – D Figure 9: TPM at the recycle stream – D. L T – constant.

70 RESULTS: TPM at the recycle stream – D Figure 11: TPM at the recycle stream – D. Self-optimizing CV – L T /F.

71 CONCLUSIONS SYSTEMATIC APPROACH TO PLANTWIDE CONTROL: Define the cost function and operational constraints Determine the active constraints –possibly based on process insight Find CV1’s for each steady-state degree of freedom: –active constraints –+ "self-optimizing" unconstrained variables. Determine the TPM location Determine the structure of the control layers (pairing) 11 practical rules

72 ECONOMIC PLANTWIDE CONTROL SUMMARY AND REFERENCES V. Minasidis, N. Kaistha, S. Skogestad, “Simple rules for economic plantwide control”, PSE-ESCAPE symposium, Copenhagen, June 2015 The following paper summarizes the procedure: –S. Skogestad, “Control structure design for complete chemical plant”, Computers and Chemical Engineering, 28 (1-2), (2004). The following paper updates the procedure: –S. Skogestad, “Economic plantwide control”, Book chapter in V. Kariwala and V.P. Rangaiah (Eds), Plant-Wide Control: Recent Developments and Applications”, Wiley (2012). There are many approaches to plantwide control as discussed in the following review paper: –T. Larsson and S. Skogestad, “Plantwide control: A review and a new design procedure”, Modeling, Identification and Control, 21, (2000). More information: –

Italy (Adchem) 2001 Korea (Dycops) 2002 Spain (WC) 2003 Hong Kong (Adchem) 2004 USA (Dycops) 2005 Czech Republic (WC) 2006 Brazil (Adchem) 2007 Mexico (Dycops-CAB) 2008 Korea (WC) 2009 Turkey (Adchem) 2010 Belgium (Dycops-CAB) 2011 Italy (WC) 2012 Singapore (Adchem) 2013 India (Dycops-CAB) 2014 South Africa (WC) 2015 Canada (Adchem) 2016 Norway (Dycops-CAB) 2017 France (WC) 2018 Shengyang, China (Adchem) 2019 ? (Dycops) 2020 Germany (WC) Process control meetings in IFAC IFAC = International Federation of Automatic Control Main international process Control event in 2016

74 11 th IFAC Symposium on Dynamics and Control of Process and Bioprocess Systems (DYCOPS+CAB) June 2016 Location: Trondheim (NTNU) Organizer: NFA (Norwegian NMO) + NTNU (Sigurd Skogestad, Lars Imsland, Bjarne Foss, Morten Hovd) Welcome to: