JTLS International User Conference

Slides:



Advertisements
Similar presentations
Working with Profiles in IX1D v 3 – A Tutorial © 2006 Interpex Limited All rights reserved Version 1.0.
Advertisements

Review Orders / Order Management Order Entry Lesson Four.
Computer Basics Hit List of Items to Talk About ● What and when to use left, right, middle, double and triple click? What and when to use left, right,
User Training. Step 1 Press Ctrl-I or choose File > Login, this will open the Login window. Figure 1-1 shows the Login window. Figure 1-1 Login Window.
16th JTLS International Users Conference
Medicaid Alternative Benefit Plans (ABP) Processing
Tutorial 8: Developing an Excel Application
MCTS GUIDE TO MICROSOFT WINDOWS 7 Chapter 10 Performance Tuning.
1 GetThere User Training Booking & Managing Online Travel.
December 2012 Copyright 2012, ROLANDS & ASSOCIATES Corporation 1 Joint Theater Level Simulation Current Federation Status.
What's inside a router? We have yet to consider the switching function of a router - the actual transfer of datagrams from a router's incoming links to.
Future Plans. Currently No Concrete Plan –Improvements To JTLS 4.0 Several Minor ECPs – Require No New Data Expected Around February or March –JTLS 4.1.
IPv6 Mobility David Bush. Correspondent Node Operation DEF: Correspondent node is any node that is trying to communicate with a mobile node. This node.
XP New Perspectives on Microsoft Office Excel 2003, Second Edition- Tutorial 11 1 Microsoft Office Excel 2003 Tutorial 11 – Importing Data Into Excel.
SETUP AND CONFIGURATIONS WEBLOGIC SERVER. 1.Weblogic Installation 2.Creating domain through configuration wizard 3.Creating domain using existing template.
Cambodia-India Entrepreneurship Development Centre - : :.... :-:-
Prepared by ASM Research, Inc. 1 INTRODUCING the New AITAS for Non-DOD DAU Students Available for FY02 Acquisition Training Application System.
Check Disk. Disk Defragmenter Using Disk Defragmenter Effectively Run Disk Defragmenter when the computer will receive the least usage. Educate users.
10 March Setup Users. 10 March Setup Users Window Allows you to perform several user tasks –Enroll users –Enable/disable users –Set user access.
Finding your way in 4-H Introduction to GPS. Agenda 1. What is GPS 2. How GPS works 3. The GPS satellite system 4. Using GPS in 4-H 5. Hands On Activity.
HP Project & Portfolio Management Resource Management July 11, 2007 CIMpleBS.com/HP-PPM/Training-Resource Management.pps By Dan Gallagher See NOTES page.
8 Copyright © 2004, Oracle. All rights reserved. Creating LOVs and Editors.
Configuring the MagicInfo Pro Display
FireRMS SQL Audit, Archiving & Purging Presented by Laura Small FireRMS Quality Assurance.
Advanced User Guide to Outlook and all its features.
MCTS Guide to Microsoft Windows 7
Key Applications Module Lesson 16 — Excel Essentials Computer Literacy BASICS.
Topics covered: Memory subsystem CSE243: Introduction to Computer Architecture and Hardware/Software Interface.
A Day in the Life of a MProLite User Easy Steps to Ensure You Get the Best Results Performance Solutions Technology, LLC.
© 2010 MediaMind Technologies Inc. | All rights reserved Trafficking Media Plan, Ad Attachments & URL Assignments.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.
GPS for Teachers. What is GPS? Global Positioning System –A Network of satellites that continuously transmit coded information, which makes it possible.
JTLS Air Tasking Order Generator Ellen Roland ROLANDS & ASSOCIATES 16 th JTLS International Users Conference 4 March 2014.
SunGuide® Software Development Project Release 4.3 Express Lanes Enhancements Design Review December 15, 2009 December 15, 20091R4.3 Design Review.
Basic & Advanced Reporting in TIMSNT ** Part Two **
JTLS International User Conference Introduction To JTLS 5.0 Mrs. Ellen Roland.
JTLS 4.1 Version Description. Currently No Concrete Plan –JTLS ECPs - Require New Data Planned For May 2013 –JTLS Major Restructuring Temporarily.
Reports and Learning Resources Module 5 1. SLMS Primary Administrator Training Module 5: Reports and Learning Resources 2.
FIX Eye FIX Eye Getting started: The guide EPAM Systems B2BITS.
GPS for Teachers. What is GPS? Global Positioning System –A Network of satellites that continuously transmit coded information, which makes it possible.
1 Kyung Hee University Statecharts Spring Kyung Hee University Specifying Objects’ Behaviour  Interaction diagrams show message-passing behaviour.
Joint Theater Level Simulation Service Oriented Architecture.
Precomputation- based Prefetching By James Schatz and Bashar Gharaibeh.
Ceridian Time Solutions Hourly/Non-Exempt & (Non- Contracted) Per Diems Key Entry.
Configuration Mapper Sonja Vrcic Socorro,
16th JTLS International Users Conference
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
1 eCoRepair New Release Slide Expanded view of Circuit Details Change to Circuit Looping text4 View of closed faults up to 30 days old5 - 7 Minor.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
ExitTOC TIMSNT Introduction 2003-Part 3 1 Introduction to TIMSNT-Part 3 Part 3: Menu Items Runs, Driver Directions, Stops, Routes and Options Use the buttons.
PestPac Software. Leads The Leads Module allows you to track all of your pending sales for your company from the first contact to the close. By the end.
People First System Enhancements Release 1 B Manager and Employee Workshop February 2006.
XP New Perspectives on Macromedia Dreamweaver MX 2004 Tutorial 5 1 Adding Shared Site Elements.
Virtual Local Area Networks In Security By Mark Reed.
SQL Database Management
New Capabilities of the Web Enabled User Interfaces
Lesson # 9 HP UCMDB 8.0 Essentials
Computer Organization
Annual Performance Management Cycle Management Training Tutorial
JTLS – Global Operations JTLS-GO Continuing Forward
HR Technology Support – EIB Training
HR Technology Support – EIB Training
Enhancement Notification Release 5.4
JTLS-MSEL (MIL/MEL) John Ruck March 2008
TransCAD Vehicle Routing 2018/11/29.
Ellen Roland ROLANDS & ASSOCIATES Corporation
JTLS 5.0 JTLS – Global Operations
Ellen Roland ROLANDS & ASSOCIATES Corporation
Presentation transcript:

JTLS International User Conference It is my pleasure to welcome you to our 16th annual International JTL Users Conference. Appreciation for everyone’s travel to be here. A pleasure to see old friends and new faces. Please make yourself comfortable and I urge you to participate. JTLS 5.0 Status Mrs. Ellen Roland

Copyright 2015, ROLANDS & ASSOCIATES Corporation JTLS 5.0 Status Unfortunately There Is Only One Word July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

Copyright 2015, ROLANDS & ASSOCIATES Corporation JTLS 5.0 Status We Always Knew It Was An Aggressive Schedule Cost Was Bare Bones Minimum Still We Decided To Do It Correctly Implemented New Logic Attempted To Remove Model Inconsistencies July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

Copyright 2015, ROLANDS & ASSOCIATES Corporation Plan Of Way Forward Beta Copies JTLS 5.0.0.R Friday 11 July 2015 JTLS 5.0.0.S Friday 25 July 2015 Updates Approximately Every Two Weeks July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

Copyright 2015, ROLANDS & ASSOCIATES Corporation JTLS 5.0 Basic Overview Removal Of Hexagon Game Board Grid Layers / Network Overlays Worldwide Representation Testbed For JLVC 2020 Services JTLS Already Wed Enabled / Cloud Capability Move Functions From Individual Programs Services Monitored and Controlled By Web Services Manager July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2012-11184 Model Road Network Committed To Network Overlay Multiple Networks Road, River Must Leave One, Travel Off Network, Get On Next Multiple Independent Networks Rail, Pipeline No Need To Go From One Network To Next Single Worldwide Network Air Corridor, Sea Lanes July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2013-11744 Air Corridors Recognize National Boundaries Basic Design All Networks When The Model Starts Compute Which Arcs Cross Which Boundaries Once Data Is Established Implementation Is Easy Won’t Leave Node Unless Arc Is Legal Boundaries Are No Longer “Hex” / “Grid” Edges Implement Cross Lines Algorithm July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2011-10933 Maritime Supply Routes Part Of Network Movement Plan Sea Lanes Work Much Like Air Corridors Each Sea Lane Have A Width Unlike Aircraft, They Stay Close To Sea Lane Once Off Network Naval Units Travel Great Circle Path Won’t Enter Grid Too Shallow Not Ocean, Small Island, or Dual Capable Won’t Cross Barrier July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

Copyright 2015, ROLANDS & ASSOCIATES Corporation JTLS-2006-1659 River Networks Biggest Issue - River Data Nodes Do Not Connect In Raw Data No Good Depth Information Seasonal Depth An Unreachable Goal For Now Once Data Exists Travel On Rivers – Straight Forward Crossing Rivers When Off Road Crossing Line Algorithm July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2006-1706 Large Map Road Networks All Networks Will Be Displayable Road Networks Bridges and Tunnels Are Arcs Road Interdiction Points Nodes Current Plan Air NB River Sea Lanes Roads Pipelines July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2010-10514 Air, Sea, Space Smooth Movement Already Done – Air Corridors Sea Covered By JTLS 2011-10933 Satellite JTLS 4.1 Hex-By-Hex – Game Board Only Worldwide Coverage – Satellite Service July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2013-11440 Terrain Movement Function Of Combat Systems Problem Very Few Truly Impassable Barriers Trucks May Not Cross HRUs On Foot Can Introduced Concept Of Barriers Used To Be Fixed Types – Along Hex Edges New Data Barrier Types (BT) – Ex: Impassable, Tank Ditch, Shore Agility Types (AGT) – Ex: Tracked, Wheeled, Foot Ability To Cross – MCP BT AGT July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2013-11440 Terrain Movement Function Of Combat Systems Road Arc Road Node Road Node With Target Barrier July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0151 Constant Sunrise / Sunset Time Request Remove Constant Light On Entire Game Board Sunrise / Sunset Data Removed Model Will Compute Light Condition Latitude / Longitude Date Time Group WHIP Shows Terminator As Terrain Layer July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0151 Constant Sunrise / Sunset Time Determination Location Date/Time July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0017 Ground Directive Egress Route Concept Of Execution Plans Existed For Naval, Formations, HRUs Expanded For Ground Units, Convoys, and Air Missions All Ground Directives Are Redesigned Ingress Path, Task Location, Egress Path Task Execution Time July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0017 Ground Directive Egress Route Changed All Execution Plans Good Reasons Centralize Code Capability Consistency Issues Made Job Larger – More Time Needed Objects Ground Units, Ships, Formations, HRU, Convoys, Air Missions July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0017 Ground Directive Egress Route Pending Task Display Each Route Point Is A Task Each Unit Status Change Is A Task Temporary Entities Air Mission and Convoy Mission Complete Task July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2013-11679 Ground Execution Plans And Viewer Ground Units On IMT Pending Task Quick Retrieval Button View Pending Tasks Ground Unit Can Have Multiple Pending Tasks July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2008-1829 Ground Move Arrival Time All Orders Changed To Include Start Time Arrive Time Complicated Computation On Road Network / Off Road Network Sequential Task Sequence Number Now Changed – No Longer Deletes All Tasks July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2011-10936 IMT Future Unit Order Display Previous ECP Addresses All Issues July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0536 Ground Withdraw Route Points Previous ECP Addresses All Issues Withdraw Route Has Points Each Point Becomes A Task July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2010-10702 Ground Route Wait Times Location Optional Leave Time Absolute – 300447MAR15 Relative Time – 2 HR Technically Easy Relative To Arrive Time Issues July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0147 Display Current Engineering Task Previous ECP Addresses All Issues July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2014-12231 Cancel Multiple Air Missions WHIP Improvement IMT Context Sensitive Orders Bring Up Air Mission IMT Panel Highlight Desired Air Missions Right Click – Select Cancel Air Missions Missions Placed In Spreadsheet Panel Fields Can Be Edit Send Button July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2006-1764 IMT Panel Modify/Delete Refuel Chits Same WHIP Improvement Bring Up Refuel Chit IMT Panel Numerous Spreadsheets Implemented Easy To Add Delete Indicate Any Changes July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2006-1630 Multiple Mission Air Orders Basic Concept Air Mission Execution Plans Like Navy / HRU Initial Order Alert Initial Mission Type With Required Data Multiple Task Option No Longer Strictly Tied To Mission Type Can Change At Any Time Can Be Scheduled To Change All Future Orders Viewable On IMT July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

Copyright 2015, ROLANDS & ASSOCIATES Corporation Proposed Mission Type Proposed Offensive - OAS Defensive Counter Air - DCA Mobility – MBLTY AWACS - AWACS Air Refuel – REFUEL CAS - CAS Recce - RECCE EC - EC Transfer – XFER Mine Laying - MLAY Mine Clearing - MCLEAR ASW - ASW SEAD - SEAD Old Attack, Armed Recce, OAS CAP, Escort Airlift, Air Transport, Strategic Lift, Insert/Extract AWACS Air Refuel CAS Recce EC Transfer Mine Warfare Patrol Wild Weasel July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

Copyright 2015, ROLANDS & ASSOCIATES Corporation Load Assignment Array Old TTG Air-to-Air Lift AEW Tanker CAS Recce Jammer General Mine Laying Mine Clearing ASW Cruise Proposed TTG Air-to-Air Lift AEW Tanker CAS Recce Jammer General Mine Laying Mine Clearing USW SEAD July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

Civilian Air Mission Order Completely Different Order Panel Has Not Changed Either Name Of Squadron Launching ICAO – Squadron Created If Required Becomes Transfer Mission As With Any Mission Mission Type Can Change July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2013-11680 Air Mission Execution Plans Same Concept As Ground Units Can View Pending Task List Input Ingress Route – Each Point Becomes Task One Or More Tasks – Each Task Is List Egress Route – Each Point Becomes Task Once In The Model Concept Of Ingress / Egress Gone Simply Add/Delete Points (Tasks) July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0321 Display Current Operations ECP Addresses Air Missions Pending Task Display July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2009-10396 Full Mission Type Alert Capability Currently Cannot Represent Logistics Alert Missions Alert Air Mission Packages Every Air Mission Can Be Placed On Alert Automatic Assignment – CAP And OAS/CAS No Automatic Assignment – All Other Missions When Player Wants It To Go – Specify Desired Task July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2009-10396 Full Mission Type Alert Capability Alert Packages Air Mission Package - Timing Options Time On Target – Same As Existing Capability Alert Airborne Alert When Forming Package Mission - Three Choices Define New Mission Use Alert Mission Use Current Flying Mission Each Mission In Package Has Its Own Choice July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2009-10335 Alert Missions Off Game Board Since There Is No Game Board Automatically Implemented July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2010-10543 Robust Use Of Alert Missions Problem Allow Orbiting Missions Go Back On Alert Solved By Execution Plans Add an Alert Task As Part Of Initial Order As Part Of Modify Mission Task Order Can Be Done As Often As Needed July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0202 Reserve Air Assets Previous ECP Addresses All Issues July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0197 Enhance CAS Current Operations Problem Stop CAS Mission Have It Go Back To Orbiting OAS Alert Different CAS Support Previous ECP Addresses All Issues All A Part Of Modify Mission Tasks July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2013-11750 Change Attack To OAS Previous ECP Addresses All Issues All A Part Of Modify Mission Tasks July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2008-10101 Multiple Orbit Points Previous ECP Addresses All Issues As Part Of Initial Air Order ATOT Part Of Modify Mission Tasks July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2006-1619 Improve Airlift/Airdrop Order Problem Allow Mission To Do Multiple Tasks Airlift Supplies Airlift Portion Of Units Airlift HRUs Change At Any Time Combined Airlift, Air Transport, Insert / Extract Mobility Mission July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2013-11723 More Control Over Airlift Missions Previous ECP Addresses All Issues July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0076 Airlift Supply Alternative Landing Location Previous ECP Addresses All Issues Part Of Modify Mission Tasks ECP Only Says Airlift Supply Supply Pickup / Delivery Locations Can Be Changed Insert / Extract HRU Locations Can Be Changed Airlift Unit Before First Load Picked Up Pickup Location Can Be Changed Before First Load Dropped Off Dropoff Location Can Be Changed July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2010-10481 Air Transport Plans On IMT Previous ECP Addresses All Issues Pending Task IMT Panel Cannot See Exactly Supplies To Be Picked Up Or Dropped Off Air Movement Report Contains This Information Exactly Supplies Current Held By Mission Available July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2009-10392 View Transport Instructions Previous ECP Addresses All Issues July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2009-10278 Robust Transit Landing Points Landing Point As Part Of Plan Land Task - Location or Unit Name Refuel Task Optional – Specified As Part Of Order Rearm Task Takeoff Task Relative Time – 2 Hours Absolute Time – 292135MAR15 July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2009-10275 Air Mission Relative Wait Points Previous ECP Addresses All Issues Applies To Wait – Ground Based Delay Hold – Airborne Based Delay Modify Mission Task Can Change Time – Longer Or Shorter Can Delete Task Consistently Apply To All Object Tasks July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2008-10091 Change Or Remove Route Wait Times Previous ECP Addresses All Issues Use Modify Mission Task Order Change Wait Time Delete Wait Task Applies To Wait – Ground Based Delay Hold – Airborne Based Delay July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2006-1711 Change Holding Aircraft Departure Time Previous ECP Addresses All Issues July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0435 Optionally Refuel At Mission Stop Problem Operational Plan - Bring Fuel Into Theater Air Transport Missions Would Bring In Fuel Refuel – Taking Fuel Back Out Of Theater Previous ECP Addresses All Issues July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2010-10465 Mission Base Fuel Cancellation Option Previous ECP Addresses All Issues Use Modify Mission Task Order Delete Refuel Task If Canceled While Executing No Fuel Transferred July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0502 Changing Heading, Speed, Altitude Execution Plan Available On IMT Speed And Altitude For Any Leg IMT Context Sensitive Orders Addresses The Issue Change Heading – Will NOT Be Implemented Travel Bearing 0330 10 Mile 15 Minutes July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2009-10108 Alter Air Mission TOT Background Each Air Mission Order Has Ability To Enter Single Task – This Is “Primary” Task Multiple Tasks First Task In List Is “Primary Task” Time On Task / Time On Target (TOT) Time For “Primary Task” Several Options July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2009-10108 Alter Air Mission TOT Option 1 – While In Scheduled Or Pre-Launch Modify Mission Task New TOT Scheduled Recompute Mission Resourcing Event and Launch Event Pre-Launch Recompute Mission Launch Event July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2009-10108 Alter Air Mission TOT Option 1 – While In Scheduled Or Pre-Launch Modify Mission Task (Con’t) Change Task Execution Time Scheduled Mission Resourcing Event – Does Not Impact Launch Launch Event – Mission Early Or Late To TOT Speed Not Adjusted Automatically Pre-Launch July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2009-10108 Alter Air Mission TOT Option 2 - After Mission Has Started Add Mission Task Add Hold Point Add Landing Point Change Speed Of Mission July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0561 Delay Pre-Launch Mission Previous ECP Addresses All Issues What We Do Not Currently Have Delay Relative – 3 Hours Only Allow Absolute Delay – 292015MAR15 July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2008-10094 Cancel Route Instead Of Replace Route Concept Of Routes Removed From Model Exist In The Order Once It Reaches The Model Simply Becomes Series Of Tasks Currently Delete Point-by-Point Use Spreadsheet Capability Highlight Points Right Click Delete Task Spreadsheet July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2006-1766 Cancel Egress Route Option Previous ECP Addresses All Issues July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0203 Packages Without Air-Ground Missions Not Implementing As Packages Air Mission Package Will Not Change Timing Rendezvous Point Time On Target Time On Target Period (NET / NLT) Missions Attack Escort, SEAD, Post-Strike Recce July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0203 Packages Without Air-Ground Missions Implementing Shadow Task Give Mission Shadow Task – New Order Primary Task Allowed: OAS, DCA, AWACS, REFUEL, RECCE, EC, SEAD Not Allowed Mobility, CAS, Transfer, Mine Laying, Mine Clearing, ASW Mission To Shadow Task Start Time - Mandatory July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0203 Packages Without Air-Ground Missions Implementing Shadow Task Give Mission Shadow Task – New Order (Con’t) Rendezvous Point – Optional If Not Specified – Intercept Path Land Flag Yes – Lands When Shadow Mission Lands No – Holds Above Landing Location July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0203 Packages Without Air-Ground Missions Implementing Shadow Task (Con’t) Give Mission Shadow Task – New Order (Con’t) Task Completed Absolute Time Relative Time Shadowed Mission Killed Completes Task Canceled By Player Order July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0120 Change Emergency Refuel Location Vietnam Era Mission Profile Concept Take Off From Carrier Head To Inbound Tanker Hit Target Head To Outbound Tanker Head Home To Carrier If You Miss Inbound Tanker Abort To Emergency Refuel Location July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0120 Change Emergency Refuel Location Problem Cannot Change – Emergency Refuel Location Solution Remove The Concept Of Emergency Refuel July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2013-11721 Air Mission Refuel Unit Information Problem Model Automatically Selects Refuel Location Player Cannot Tell Who This Is Solution Every Mission Task Has Associated Object – Shown On IMT Mission Has Refuel Task and Associated Object Base Fuel – Is Base / Carrier / FARP Tank Fuel – Is Tanker July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2013-11721 Air Mission Refuel Unit Information Side Note Using Modify Mission Task Order Associated Object Can Be Change This Means User Can Change Selected Refuel Base Or Tanker July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0170 IMT Destination 2 Location Improvement Problem A Mission Showed Destination 2 On IMT Confusing Because Meaning Different Mission Type Different Mission Postures Solution Removed Entire Concept Of Destination 2 Mission Pending Task List Shows All Information July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0170 IMT Destination 2 Location Improvement Example - Orbiting Mission Old Method Destination 1 – Start Orbit Destination 2 – End Orbit New Method Task Launch Task Orbit – Start Lat/Long Task Orbit – Transit Point 1 Lat/Long Task Orbit – Transit Point 2 Lat/Long Task Orbit – End Lat/Long July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2009-10284 TTL Change To Flying Mission Problem Air Mission Has Target Type List – What To Hit On Initial Order Cannot Be Changed Solution Two Current Operations Order For Air Missions Change Mission Parameter Mission TTL Added To This Order Modify Mission Task July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2012-11366 Amphib Operation Specify Formation Location No Hex Edges Shore Lines Are Polylines Line As Described Player Must Input Formation Location Assault / Pickup Location Barrier That Will Be Crossed (Optional) Assets To Be Used Port, LOTS, Small Boats, Helicopters All Model Decisions Will Be Removed July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

Copyright 2015, ROLANDS & ASSOCIATES Corporation Amphibious Example Shore LCAC Shore Landing Point Formation Assault Point July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2008-10023 Ship Route Movement Speed Ship Execution Plans Each Move Point Is Displayed As Task Task Has Location And Speed Modify Sea Task Order Task Number Change Speed Planned IMT Order Panel Context Sensitive Menu Highlight Specific Leg Change Speed And Send July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2006-1763 Display Formations On WHIP Map New Symbol Represents Formation Center Formation Center Is Displayed Ability To Highlight All Ships In The Formation Whether Ob Station Or Not Filter Not Detectable Side Knows Formation If One Ship In Formation July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2006-1762 Formation Context Sensitive Menus Right Click On Formation Center Symbol Formation Name On IMT Order List Appears Select Desired Order July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2011-10935 Create Convoy At Future Time Convoys Will Work Like Air Missions Support Unit Number Assets Leave Time Route Supplies Model Will Still Generate Automatically July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2011-10935 Create Convoy At Future Time Convoys Have Pending Task List Like All Objects Task Resource Currently Happens At Leave Time Prior – Load Time No Concept Of Early Resource Time Like Air Missions July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2013-11755 Give Convoys Specific Routes Convoy Order Combined Directed Resupply Order Mandatory Resupply Order Single Task Multiple Tasks Mandatory Becomes A Field For Entire Order July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0467 Multiple Destination Convoy ELF Usage Centralize Code For Loading / Offloading MHE – Specific Assets Available ELF – Unit Loading Or Offloading Convoy By Itself One ELF Assumed July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0185 Distinguish Between Destroyed and Returned Convoys Currently All Convoys Show As Destroyed Destroyed Says Removed From Game Model Distinguishes Between Destroyed, Completed, Canceled When Convoy Is No Longer Removed From Game Stays On IMT Until It Is Refreshed Last Posture Will Show Reason Convoy Is No Longer July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2014-12225 Remove Impossible Unit Posture Data UP.UP.LANCHESTER.DATA.SET CCP.CS.UP.DENSITY.MODIFIER CCP.SC.UP.TT.DENSITY Inactive Unit Posture ATTACHED OUT_OF_GAME WIPED_OUT July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2014-12225 Remove Impossible Unit Posture Data Problem Unit Posture Data UP.UP.LANCHESTER.DATA.SET CCP.CS.UP.DENSITY.MODIFIER CCP.SC.UP.TT.DENSITY Inactive Unit Posture ATTACHED, OUT_OF_GAME, WIPED_OUT Solution – Remove Data From Database July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2013-11470 Contaminate / Decontaminate Multiple Hexes Problem Contamination For Only One Hex Inappropriate For Hexes Even More Inappropriate - Grids Different Sizes Solution Circular Pattern – TW RADIUS OF EFFECTS July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2013-11470 Contaminate / Decontaminate Multiple Hexes July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS 2013-11470 Contaminate / Decontaminate Multiple Hexes Each Covered Grid Tagged When Unit Enters Grid Check For Tag Then Check Distance July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2010-10470 JOI, TOI As Services JOI Component In Controller WHIP Access To Command Hierarchy To Map Limit WHIP Access TOI Postponed As Web-Controlled Service Due To NATO Testing July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2007-2012 WHIP ATO-Generator One Of The New Services JTLS Used For Test Bed No Matter What Happens To Service The ATOG As Delivered Will Remain In JTLS Separate Briefing July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JLVC-2020 WHIP ATO-Translator Service Translator Becomes Service Same Concept As Generator Requirement To Work With Theater Battle Management Core System (TBMCS) US Integrated Command Control System (ICC) NATO Northern European Command – Command Control Information System (NEC-CCIS) Norway July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JLVC-2020 WHIP ATO-Translator Service TBMCS ICC NEC-CCIS ATO/ ACO ATO-Parser Parsed XML File XML Mission File ATO-T XML Linking File Apache Synapse Spreadsheet Component ATOT Component Web Access WHIP July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0405 JTLS Air Symbology Request JTLS symbology must be upgraded to comply with Military Standard 2525B and match other simulation models, as well as current C2 systems. JTLS is non-standard in virtually all air symbols, which are not meaningful to a training audience that uses the Common Operational Picture. July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-0405 JTLS Air Symbology Developing New 2525 Symbol Set Each Symbol Will Have Three Looks Friendly, Neutral, Enemy Sequentially Numbered Database Hold Friendly Number Symbol Is Perceived Attribute If Friendly - Database Value + 0 If Neutral – Database Value + 1 If Enemy – Database Value + 2 Non 2525 Support Capability Color-Coding and Percent Capable Thermometer July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

JTLS-2006-1648 Model Naval Improved Port Capacity Naval Unit Has A Home Port Marks Unit As A Naval Port New Naval Task Enter Port Vice Move To Area Of Port When In Port Automatically Attempt Entry Into Shelter Follow Within Unit Radius Of Port When In Unit Radius Of Port Follow SSM, Aircraft, AD Firing Restrictions July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation

Copyright 2015, ROLANDS & ASSOCIATES Corporation Questions July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation