PERFORMANCE MEASURES FOR HIGHWAY CAPACITY DECISION MAKING WEST VIRGINIA PLANNING CONFERENCE – SEPTEMBER 16, 2015 SALEEM SALAMEH, P.E., PH.D. KYOVA IPC.

Slides:



Advertisements
Similar presentations
Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
Advertisements

MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
Performance Elements National Goals Performance Measures Performance Targets Performance Plans Target Achievement Special Performance Rules Performance.
Vermont Agency of Transportation Performance Management Status FHWA Performance Management Workshop June 19, 2012 Warwick, RI Joe Segale, P.E./PTP Policy.
The US 101 Mobility Study will -  Examine current and future conditions, identify key deficiency areas and propose multi-modal improvement packages along.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Management.
Comprehensive Freight Movement Plan Pennsylvania Rail Freight Seminar May 22, 2013 Pennsylvania Long Range Transportation Plan Pennsylvania Long Range.
MAP-21 Overview and Programmatic Impacts February 4, 2013 Serge Phillips MnDOT Federal Relations Koryn Zewers.
2040 Metropolitan Transportation Plan Final Approval GVMC Board May 7, 2015.
Transportation Planning Section, Transportation Development Division Oregon Transportation Plan 2005 Modeling Alternative Policy Choices Becky Knudson,
Evaluation Tools to Support ITS Planning Process FDOT Research #BD presented to Model Advancement Committee presented by Mohammed Hadi, Ph.D., PE.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Operations Planning Organizing for Travel Time Reliability Ohio Planning Conference July 15, 2014.
Framework for Model Development General Model Design Highway Network/Traffic Analysis Zones (TAZs) Development of Synthetic Trip Tables Development of.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
How to use this presentation This presentation is for use by transportation professionals to communicate the TSP concept. The presentation comprises a.
Irene Rico Division Administrator Federal Highway Administration Moving Ahead for Progress in the 21 st Century ~ MAP-21.
Moving Research into Practice.  Implementation is the routine use of a SHRP 2 product by users in their regular way of doing business.  Users can include.
October 6, :30 – 11:00. MPM Team Agenda Review of MPM program and team MAP-21 and other updates Mobility performance measures reporting On-going.
AASHTO Subcommittee on Rail Transportation Sept. 18, 2012 Kevin Chesnik.
Statewide Local Agency Project Delivery Conference SAFETEA-LU: Earmarks and Federal Programs Relating to Local Agencies Travis Brouwer ODOT Federal Affairs.
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
Patrick Weidemann Ryan Wilson, P.E., AICP Minnesota Department of Transportation MnDOT – ACEC/MN Annual Conference March 5, 2013.
FY 2012 President’s Budget Released February 14, 2011.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Ohio Transportation Planning Conference July 16, 2014.
PROJECT DESCRIPTION BORDER WAIT TIME WORKING GROUP.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration Regional Workshop on Performance Management and Performance-Based.
Incorporating Management and Operations and the Congestion Management Process into Metropolitan Transportation Planning FHWA/FTA Webinar June 24, 2008.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
MAP-21 Moving Ahead for Progress in the 21 st Century Virginia Association of Planning District Commissions October 4, 2012.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
NASTO ANNUAL MEETING JUNE 9-11, 2013 MEETING CUSTOMER EXPECTATIONS THROUGH PERFORMANCE MEASURES: VERMONT’S PERSPECTIVE Richard M. Tetreault, P.E. Director/Chief.
KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.
Introductions Introduction to TCAG Federal Metropolitan Planning Organization (MPO) Responsible for long-term planning for all modes of surface transportation.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO TCC & CAC Presentation – August 21, 2012.
1 June 11, 2015 Raleigh, NC. PRESENTATION OBJECTIVE To give an overview on the newly adopted Strategic Transportation Corridors. 2.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO Board Presentation September 25, 2012.
US DOT Planning for Operations Initiative – An Update AASHTO SCOH Annual Meeting June 14-17, 2009 Manchester, NH Rick Backlund – FHWA Office of Operations.
Ohio Department of Transportation Steering Committee Meeting #3 Steering Committee Meeting #1May 30, 2012 Steering Committee Meeting #1 WELCOME Steering.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Measure Update.
Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.
Integrated Travel Demand Model Challenges and Successes Tim Padgett, P.E., Kimley-Horn Scott Thomson, P.E., KYTC Saleem Salameh, Ph.D., P.E., KYOVA IPC.
Presentation for Talking Freight, November 16, 2011 Debbie Bowden Freight and Economic Policy Analyst, Office of Freight and Multimodalism Maryland Department.
Transportation leadership you can trust. presented to Safety Data Analysis Tools Workshop presented by Krista Jeannotte Cambridge Systematics, Inc. March.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
Context and Priorities April 9,  Why FHWA Focuses on Improving Operations  FHWA Operations Program Areas  Key Current Program Priorities.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Action 2020 Training Local Context August 15, 2012.
IFTA Annual Business Meeting Virginia Beach, VA August 17, 2011 Federal Highway Administration.
December 16, :00 – 2:45. MPM Team Agenda 1.Review of MPM Program and Team 2.Consensus items document 3. Upcoming activities 4. Discussion.
Incorporating Connected/Automated Vehicles into the Transportation Planning Process November, 2015 Max Azizi US DOT.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Advancing Safety through SAFETEA-LU Michael Halladay FHWA Office of.
December 17, 2010 Developing Transit Performance Measures for Integrated Multi-Modal Corridor Management.
Roadway Data Extraction Technical Assistance Program (RDETAP) Robert Pollack October 25,
Performance Management FHWA’s Strategic Direction and Outcome Performance Measures Using Performance Management to Deliver Accountability AASHTO Annual.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21st Century An Update on Implementation.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 and Managing National Highway Performance Michael Nesbitt Federal Highway.
VicRoads – Movement & Place
Unit 2 DEVELOPMENT OF THE LONG RANGE TRANSPORTATION PLAN (LRTP) LCTCC Educational Program.
GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT PLAN 1 Goods Movement Collaborative and Goods Movement Plan Final Plan Alameda County Transportation Commission.
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
0 Freight Activities: Year in Review Dec. 12 th 2015.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Performance-Based planning 2.0 Raising the bar with SHRP-2
Office of Transportation Planning Modal Planning Update
Presentation to DATA on VTrans 2040 / HB2
Laurie Leffler, Division Administrator
TSMO – What Does It Mean for Planners?
Presentation transcript:

PERFORMANCE MEASURES FOR HIGHWAY CAPACITY DECISION MAKING WEST VIRGINIA PLANNING CONFERENCE – SEPTEMBER 16, 2015 SALEEM SALAMEH, P.E., PH.D. KYOVA IPC TRUNG VO, P.E. KIMLEY-HORN

OUTLINE  Moving Ahead for Progress in the 21 st Century  KYOVA Performance Measurement  A Case Study in Highway Capacity Decision Making 2

MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY PERFORMANCE ELEMENTS. NATIONAL GOALS. PERFORMANCE MEASURES 3

PERFORMANCE ELEMENTS 1. National Goals 2. Measures 3. Targets 4. Plans 5. Reports 6. Accountability and Transparency 4

NATIONAL GOALS 5 Goal AreaNational Goal SafetyReduce fatalities & serious injuries on all public roads Infrastructure conditionMaintain a state of good repair Congestion reductionSignificantly reduce congestion on the NHS System reliabilityImprove the efficiency of the surface system Freight movement & economic vitality Improve the national freight network, access of rural communities to markets, & economic development Environmental sustainability Enhance system performance while protecting and enhancing the environment Reduced project delivery delays Accelerate project completion by eliminating delays in the project delivery process

PERFORMANCE MEASURES  Safety Performance  Number of fatalities and number of serious injuries  Rate of fatalities and rate of serious injuries 6

PERFORMANCE MEASURES  Pavement and Bridge  Percentage of pavements in the Interstate System in good and poor condition  Percentage of pavements of the non-Interstate NHS in good and poor condition  Percentage of NHS bridges classified as being in good and poor condition 7

KYOVA PERFORMANCE MEASUREMENT STRATEGIC HIGHWAY RESEARCH PROGRAM METROPOLITAN TRANSPORTATION PLAN CONGESTION MANAGEMENT PROCESS. SPATIAL DECISION SUPPORT SYSTEM 8

STRATEGIC HIGHWAY RESEARCH PROGRAM 2 (SHRP 2)  SHRP 2 was created to  Improve highway safety  Reduce congestion  Improve methods for renewing roads and bridges  KYOVA will use its SHRP 2 grant to establish a process that  Conforms to national and state standards  Is easily repeatable  Coordinates with available data and data gathering practices 9

STRATEGIC HIGHWAY RESEARCH PROGRAM 2 (SHRP 2) TIMELINE OF EVENTS  January-March 2015 – KYOVA applied for and was awarded funding for C02: Performance Measures for Highway Capacity Decision-Making  May 2015 – Kickoff Conference Call with FHWA and completion of Statement of Work  August 2015 – Notification to proceed with work  September-November 2015 – Identify stakeholders and prepare for FHWA workshop  November 2015 – Stakeholder workshop  June 2016 – Complete SHRP 2 Implementation Assistance project 10

STRATEGIC HIGHWAY RESEARCH PROGRAM 2 (SHRP 2) IMPLEMENTATION SCHEDULE Task #Deliverable/ActivityTimeframe 1Identify stakeholders1 week 2Kickoff meeting with stakeholders (merged with FHWA workshop)2 weeks 3Data needs coordination4 weeks 4Preparation for FHWA workshop4 weeks 5Conduct workshop with FHWA and stakeholders1 week 6Summarize feedback from FHWA workshop2 weeks 7Additional data gathering and coordination4 weeks 8Develop action plan for C02 tool application4 weeks 9Prepare C02 tool performance documentation2 weeks 10Presentation to agency stakeholders2 weeks 11

STRATEGIC HIGHWAY RESEARCH PROGRAM 2 (SHRP 2) FHWA WORKSHOP  Stakeholders will hear from representatives from FHWA, KYOVA, WVDOT, KYTC, and ODOT about current and forthcoming work on performance measures  Break-out group brainstorming to generate ideas on future “action steps”  Group dialogue on the framework and components of the Action Plan  Discussion of next steps for developing and implementing the Action Plan 12

2040 METROPOLITAN TRANSPORTATION PLAN PRIORITIZATION CRITERIA  Efficiency  Reduction in Delay  Reduction in Excess Demand  Support of Freight Priorities  Support of Transit Service  Support of Bicycle and Pedestrian Mobility  Safety  Growth Management  Economic Development  Existing Deficiency  Cost Effectiveness  State Priority 13

CONGESTION MANAGEMENT PROCESS PERFORMANCE MEASURES  Intensity  Volume-to-Capacity Ratio  Level of Service  Travel Time Index  Duration  Extent  Number of Vehicle Miles Traveled at LOS E or F  Total Delay  Variability  Crash Rate  Planning Time Index  Multimodal  Fixed-Route Transit Coverage  Bicycle/Pedestrian Routes/Facilities  Proportion of CMP Network that Includes Fixed-Route Transit or Bicycle/Pedestrian Routes/Facilities 14

SPATIAL DECISION SUPPORT SYSTEM (SDSS)  A GIS-based system of relational databases, computational tools, and information sources used to  Store transportation system attribute and performance data  Perform technical analyses that identify/quantify congestion and assess the effectiveness of congestion reduction/mitigation strategies  Provide themes maps and system performance reports for stakeholders and decision makers 15

SPATIAL DECISION SUPPORT SYSTEM (SDSS) Map Figures KYOVA Transportation Management Area BoundaryVolumes from Traffic Model Assignments CMP NetworkCapacities from Traffic Model Assignments Major River CrossingsV/C Ratios from Traffic Model Assignments Fixed Route Transit CoverageLevels of Service Computed Crash Rates Compared to Statewide AverageTravel Time Indices Congested Locations from Stakeholder WorkshopsPlanning Time Indices Downtown Railroad Underpass/Viaduct Locations 16

CHALLENGES AND OPPORTUNITIES  Providing both consistency and flexibility  Finding the right balance of national measures  Managing performance across jurisdictions  Data requirements and management  Linking performance measures to investments  Advancing technologies 17

CHALLENGES AND OPPORTUNITIES  Improved communication link between investments and results  Increased consistency  Increased coordination across jurisdictions  Greater understanding of what works  Spur discussions on the value of future performance management  Improved data collection, integration, reporting, and visualization 18

A CASE STUDY IN HIGHWAY CAPACITY DECISION MAKING NCDOT PRIORITIZATION PROCESS. BENEFIT/COST CRITERIA TRAVEL TIME SAVINGS ANALYSIS. OPPORTUNITY FOR KYOVA 19

NCDOT PRIORITIZATION PROCESS  Strategic Transportation Investments Law passed in 2013  Replaces Equity Formula with Strategic Mobility Formula  New data-driven process based on specific criteria  Equity Formula would have funded 175 highway projects  Mobility Formula will fund 478 highway projects 20

BENEFIT/COST CRITERIA  Highway projects compete in three categories – all include Benefit/Cost criteria  Division Needs – 20%  Regional Impact – 25%  Statewide Mobility – 30%  Benefit/Cost is based on travel time savings 21

TRAVEL TIME SAVINGS ANALYSIS  TransModeler 4.0 is the selected microsimulation software to measure travel time savings for every highway project  Currently analyzing 98 projects – to be completed by end of October  Long-term byproduct is statewide microsimulation model 22

OPPORTUNITY FOR KYOVA  Integrate microsimulation with regional travel demand model  How could microsimulation be used to inform KYOVA’s MTP prioritization process?  Potential performance measures  Travel time savings  Congestion reduction  Queue spillback mitigation 23

 Saleem Salameh KYOVA Interstate Planning Commission  Trung Vo Kimley-Horn 24