Spectrometer Solenoid Fabrication & Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab NFMCC 2010 Collaboration Meeting University.

Slides:



Advertisements
Similar presentations
Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Lead Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab MICO Meeting January 19, 2010.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Tech Board Schedule Discussion
MICE Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
MICE Magnets - Virostek 11 MICE Magnets Steve Virostek Engineering Division Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Spectrometer Solenoid Overview Roy Preece 31 st January 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE Cooling Channel Magnets: Spectrometer Solenoid Procurement RF Module Coupling Coil Proposal Steve Virostek Lawrence Berkeley National Lab NFMCC 07.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
MICE Spectrometer Solenoid Review A summary of P.Fabbricatore on behalf the review board Amalia Ballarino, Elwyn Baynham, Tom Bradshaw, Mike Courthold,
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012.
Status of MICE Coupling Coil Magnets D. Li and M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory February 16, 2011 MICE CM29-Rutherford.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Spectrometer Solenoid Documents and Review Plans Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National.
Spectrometer Solenoid Fabrication & Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICE Funding Agency Committee Meeting—RAL.
Spectrometer Solenoid Update
Spectrometer Solenoid Fabrication Status and Schedule
MICE Coupling Coil Update
Presentation transcript:

Spectrometer Solenoid Fabrication & Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab NFMCC 2010 Collaboration Meeting University of Mississippi, Oxford

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page2 MICE Cooling Channel Layout Spectrometer Solenoid #1 (reassembly under way) Spectrometer Solenoid #2 (modified & ready to cool down)

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page3 Topics Recent magnet cool down and training HTS lead burn out Technical review Current status of Magnet 2 Thermal modeling and measurements Magnet 1 progress Upcoming task schedule

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page4 Magnet Status Summary Magnet 1 was completed in 2008, and training had begun Ice blockages in LHe recondensing system piping prevented proper operation Magnet 2 assembly proceeded with design improvements (improved recondensing system, added cold mass venting, better shield connection, precise mechanical alignment) Magnet 2 became the first unit & Magnet 1 was disassembled Training of completed Magnet 2 was carried out during 2009 An HTS lead burned out at 90% of design current due to inadequate cooling With repairs complete, cool down of Magnet 2 to start soon

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page5 Magnet Cooldown Transfer line for LHe cooldown (FNAL contribution) 500 liter LHe dewar

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page6 LHe Cooldown of Magnet 2

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page7 Magnet Quench during Training

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page8 A leak was found in one of the cold mass vent lines during initial cooldown and was repaired in June ’09 The subsequent cooldown was successfully completed in only ~3 days w/o incident However, the shield temperature fell slowly to only about ~115 K at the ends of the cylinder, resulting in added heat flow into the cold mass via the cold mass supports After filling, the coolers are expected to hold the LHe level, but ~1% of the LHe was boiling off overnight (unpowered) Training began and was going well with five training quenches at currents ranging from 182 to 238 A Magnet 2 Testing Results

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page9 At 238 A (w/all coils in series), one of the HTS leads burned out due to a higher than allowable temp. at its upper end The upper lead temperature without current was ~80 K, increasing to >90 K with current, eventually resulting in failure of the lead farthest from the coolers The lead problem was a surprise, as it was not noticed in the earlier Magnet 1 tests; the feedthroughs and all the leads are the same ones used before in Magnet 1 The Magnet 2 turret was disassembled to access leads We are currently thermally testing the feedthroughs and leads in an off line test to see what can be learned Magnet 2 Testing Results (cont’d)

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page10 Upper and HTS Leads Configuration

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page11 Magnet 2 Burned Out HTS Lead Burned out 500 A lead

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page12 MICE Internal Technical Review Spectrometer Solenoid technical review was held on November 18-19, 2009 at LBNL Review committee: Pasquale Fabbricatore (chair), Amalia Ballarino, Elwyn Baynham, Tom Bradshaw, Mike Courthold, and Chris White; Alain Blondel and Andy Nichols (ex officio) The committee came up with several recommendations including the following: - Approved the adding of a single stage cooler to Magnet 2 - Recommended additional thermal modeling of the system - Advised installing additional magnet instrumentation - Suggested Magnet 2 test results be used to determine the final modifications to Magnet 1

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page13 Magnet 2 Repair and Modification A modification to Magnet 2 was proposed that adds a single- stage cryocooler to provide additional cooling to the HTS leads and does not require full magnet disassembly The plan to add a single-stage Cryomech AL330 cooler (arrived 11/13/09) provides 170 W at 55 K and requires modifications only in the “turret” area The added cooling power should lower the HTS lead temperature sufficiently to train to full current The new cooler could remove enough heat to permit the other 3 two-stage coolers to maintain the cold mass LHe level (i.e. closed system)

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page14 1 st Stage Area after Lead Removal

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page15 Original Magnet 2 Configuration HTS leads Cold head 1 st stage Radiation shield Fill & vent lines Cold mass

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page16 Magnet 2 with Added Cryocooler Single-stage cooler Thermal link HTS leads

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page17 Modification Details Added turret space Access port

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page18 Current Status of Magnet 2 The Magnet 2 turret area has been disassembled and modified to allow installation of the single stage cooler New HTS leads are being installed that have been tested in an off-line apparatus Additional temperature sensors on the cold heads and voltage taps on the lower HTS leads have been added Initial pumpdown and leak check of the magnet insulating vacuum is expected during the week of January 18 Cooldown for testing and training will follow

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page19 Magnet 2 Single Stage Cooler Single stage cooler and flexible copper thermal link during fit check in Magnet 2

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page20 Future HTS Lead Protection The HTS leads can be actively protected from burnout due to quench as follows: i)Interlock the power supply with the temperature of the top of the HTS leads/heat sink to disable power supply when the temperature is too high ii)Active quench protection based on the voltage across the HTS leads in case of resistive transition (~3 mV limit); voltage taps have been added to the lower end of the leads Both of these systems could be implemented in the RAL control system after magnet delivery

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page21 Our modeling indicates the new cooler won’t substantially affect the shield temperature It is uncertain whether the addition of the single- stage cooler will solve the LHe boil off issue Cannot address known deficiencies in Magnet 2 (shield connection, copper plate thickness, leads arrangement) without fully disassembling magnet Additional cooler(s) will increase utility costs for running the magnets (water and power) Other Issues

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page22 If the addition of a single-stage cooler to Magnet 2 does not result in a closed system, there are two options: i) Accept the thermal properties as is and top up the magnet with external cryogens as needed ii) Disassemble and modify the magnet to improve the shield connections and to accommodate a fourth two- stage cooler (in addition to the single-stage cooler) The 2 nd option would add ~6 months to the delivery of the 2 nd magnet to RAL and create additional risks of damage or assembly errors in the repair process For these reasons, the first option is preferred Magnet 2 Fallback Scenario

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page23 A thermal model of the magnet was developed and is being used to understand the cooling mechanisms and heat loads Initial calculations indicate the upper HTS leads temp. will be <70K during operation w/the added cooler The temperature drop across the thermal link between the single stage cooler and the 1 st stage copper plate is expected to be ~10 K An off-line magnet lead test is being carried out by Wang NMR to measure all relevant temperatures and voltages during operation Additional sensors will directly measure cold head temps. Thermal Calculations and Measurements

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page24 Thermal Shield Model FEA model of thermal shield, 1 st stage plate and HTS leads Proposed magnet modifications are also being modeled

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page25 Magnet Lead Test HTS lead 1 st stage plate Thermal connection

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page26 Initial Test Results (1) Tests began on January 14, 2010 – at initial equilibrium (no current), leads gave ~10 W heat load into cooler stage 1 temperature at top of leads was below freezing cooler temperatures: 33.8 K (stage 1); 3.5 K (stage 2) – next, powered leads to 275 A voltage drops on leads were 99 and 95 mV, respectively – means about 27 W per lead…unexpectedly high  leads too long for their cross-sectional area temperature at top of leads was 350 K (hot!) cooler temperatures: 42.4 K (stage 1); 3.5 K (stage 2)

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page27 Initial Test Results (2) Added 20 W to shield (stage 1 load) with 275 A in leads – results: cooler temperatures: 56 K (stage 1); 3.9 K (stage 2) lead voltage drops increased to 104 and 101 mV, respectively – because leads now running hotter than before  T between stage 1 and copper plate (across plug-in joint): 1.1 K at 33.8 K, 2.4 K at 42.4 K, and 1.4 K at 56 K – grease probably more conductive at higher temperature means that “plug-in” aspect working as expected Next, will increase cross section and decrease L of leads – then retest next week

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page28 Magnet 1 Plans – implement ideas to improve thermal connection between coolers and shield and lower cold mass support intercept temperature use copper sheets rather than Al cylinder use Al-1100 strips on outside of shield to improve heat conductivity – make preparations for using additional 2-stage cooler augmenting the single-stage cooler to solve both thermal problems decision to add 5 th cooler depends on outcome of Magnet 2 tests – modify cold mass fill pipe to facilitate clearing a blockage should one occur

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page29 Magnet 1 Cold Mass Added port for possible 4 th 2-stage cooler

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page30 Magnet 1 Shield Corresponding hole for 4 th 2- stage cooler added to shield shield is also being “beefed up” locally to improve heat transfer to edges – this is where cold-mass support intermediate temperature point is connected extra heat load from higher temperature at this point is burden for stage 2 of coolers – probably more of an issue than bulk radiation load Attachment point for LN 2 reservoir New connection for cooler added Area where cold- mass support intercept attached

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page31 Heat Shield Thermal Connections Previous attempt to improve thermal connection between stage 1 of coolers and shield was a failure – aluminum bands were even worse than original copper strips – next iteration will make connections between stage 1 copper plates and shield with thick copper sheets

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page32 2-Stage Cooler Modification Top view: A fourth 2-stage cooler could be added as shown below – still leaves room for the single-stage cooler Side view:

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page33 Magnet 1 Issues Need to determine whether we need fourth 2-stage cooler to maintain cryogen level – the single-stage cooler for Magnet 1 is on order Possible that improvements to the shield connection, along with the single-stage cooler, will suffice – if it works on magnet 2, the answer is clear – if it “almost” works, the answer is not so clear We can answer the questions “sequentially”, but each trial costs time and money Present approach requires one additional cooler per magnet, and maybe two

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page34 * These step are only required if the initial modifications to Magnet 2 are unsuccessful Schedule Overview

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page35 Coupling Coil Status Coupling coil design essentially finished – still working to get complete and consistent set of drawings LBNL (DeMello) will assist in this Coil fabrication job out for bid – expect responses in February, aim to sign contract in March for all three coils HIT may not have enough funds for entire job – may need additional U.S. contribution New management structure in place at HIT – Li Wang, Chief Engineer; FengYu Xu, Project Manager contract in place with IHEP consultants (technical experts) D. Li, S. Virostek, A. DeMello, M. Green are key players

Virostek/Zisman -- Lawrence Berkeley National Laboratory -- January 16, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page36 A fix to Magnet 2 has been implemented which did not require full magnet disassembly Addition of a single-stage cooler to the first stage copper plate is expected to solve the HTS leads temperature problem Temperature of the thermal shield may still be an issue (cooler will have minimal impact) Operation without the need for cryogen top off is not guaranteed Magnet 2 test results will be used to assess the degree of modification required for Magnet 1 Summary