St Patrick’s Primary School Mansfield Disabled Access Project Consultants:CP Associates Construction:Tanbury Construction, Mansfield Cost:£175,938 Construction:April.

Slides:



Advertisements
Similar presentations
Grimsby Secondary School
Advertisements

1. Background 2. Design 3. Cost 4. Fundraising PLACE OF WORSHIP – there are around 500 members of St John’s and services are held throughout the week.
Listening to you, working for you Transition Reception to Year 1.
Background PFI (Private Finance Initiative) School to be built by Miller Construction Government Funded Supported by the Local Authority School is designed.
Hi Here is a plan of our school. We received a grant from the Government to renovate the school. We would like you to try to redesign these rooms, and.
Welcome to the British Section of SHAPE International School. Our school is an integral part of the SHAPE International School (SIS) and is situated on.
Architecture Hall Assessed By: Jillian Petrin, Julia Terlinchamp, Gabriel Wan, Brian King, & Amelia Albert.
ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.
External & Strategic Development Services (ESDS) NSS and Gender Comparison of : Male and female students Sector and UEL Year 2006 to 2009 Strategic Planning,
BRIGHTON, UK 8 TH – 10 TH MAY 2014 THE DOME – DISABLED INFO.
Disabled Platform Access There are two designated parking bays immediately outside the front of the main college building. Disabled access both into the.
Quality of Health Audit of Dental Services. Hi we are Jessica Bromley and Richard Johnson and we are both Quality Auditors with Changing our Lives.
North-East Northamptonshire Project Highlight Report No. 2 Period October 15 th to October 31 st 2014 Thursday October 30 th 2014.
School expansions Basic Need. Long Ditton St Mary’s Junior School increase in PAN from45 to School more financially secure No hassle quick quality.
Jeffrey Leung Monica Guillen Tyler McEwen Tiba Ali C LASS R OOM B UILDING S URVEY.
Moon Phases Hyun Geun Park. Moon Phases Shows no light New moon is first visible crescent Beginning of the month New MoonFull MoonCrescentGibbousQuarters.
By: Robbie Newman. Total Square Feet: 1474 sqft Front Rear.
New section slide HOLBEACH PRIMARY SCHOOL Proposal to expand to 3 forms of entry.
Statesof Matter. Matter, Matter Everywhere Can you name some things that are matter? Matter comes in many shapes and sizes, but there are only three types,
Walkerton Accommodation Review April 24, 2008 The following most recommended scenarios were reviewed by the Accommodation Review Committee.
French Residential Trip for the current Year 4 and 5 Mrs Britton- French subject leader Miss Wassell- Educational Visits Coordinator.
Inclusive Practice Gifted & Talented Rachel Lockwood & Denise Crosland.
School Toilet Blocks for Bangladesh Gender Sensitive : Disability Friendly : Dedicated Teacher Cubicle : Disaster Adapted.
Teachers notes Tools & Equipment Slides 1 – 4 provide a visual re-cap of all the tools and equipment featured in this unit. Each slide could be printed.
12/14/2011AEG Associates for the LTC Discussion Group  Presentation by Albert E. Graf, AIA AEG Associates, Annapolis, MD Building a Home Considering Universal.
Tubbenden tour By Ximan Mao, Calvin Goode, and Davian Bailey.
All Saints’ RC School Mansfield PE Changing Room Refurbishment 2007 Consultant : CP Associates Contractor : Tanbry Construction, Mansfield Cost :£372,
Welcome to the Trinity Anglican Methodist Primary School Information Sharing Event Thursday 11 th February, 2010.
West Hertfordshire Hospitals NHS Trust West Hertfordshire Hospitals NHS Trust West Herts Hospitals NHS Trust Jan Filochowski, Chief Executive Presentation.
2 nd phase I.Classrooms, toilets, dinning hall, computer rooms and library for the primary students II.Expansion of the high school library and relocate.
Intent to Raise Questions Responses to questions from March 24, 2015.
Increasing Access for Persons with Disabilities: The case of Safaricom.
POSTECH H uman S ystem D esign Lab oratory Ch 40. Housing for older persons in Southeast Asia: Evolving policy and design Thu. 김 충 식.
By Nafisa Rahman. Changing rooms I think that year fives and year sixes should have their own changing rooms, the boys and girls separated. Its not fair.
By George Lowe. Prospectus Plantsbrook Staff PB Community Map of school Contact us Can you get it right? Building and Facilities Welcome Academic.
North Ridge High Specialist Support School School Development Plan 2013/ 14 Head Teacher B. Kostick Chair of Governors S. Samuel "Do your best" Do Your.
Lady Boswell’s Learning together Learning for life.
AO4 LO: To identify the barriers which may affect as service user. To examine the effectiveness of tools which support those with additional needs.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
POSTECH H uman S ystem D esign Lab oratory Chapter 14 LIFETIME HOMES: ACHIEVING ACCESSIBILITY FOR ALL Thu. Kim, Hee-jin.
Bedlingtonshire Community High School New Build
RAISEonline Data Analysis St Bernadette's Catholic Primary School St Bernadette's Catholic Primary School (c)
We work to make sure that nobody gets left out. If there is a problem we try to fix it.
MASTERPLAN Drivers for Masterplan: There are a number of drivers determining the need for – and direction of a Masterplan covering the entire St.
Pentrellyncymer Year 5 April ‘Adventurous Activities’ in the curriculum. ‘Adventurous Activities’ in the curriculum. In the curriculum children.
St Chad’s Catholic Primary School. January 2004 St Chad’s Catholic Primary School Phase Two new junior classrooms added.
School Design Education Burnley – The Way Forward.
(1) School Budgets (2) Creating a Vision for St.Patricks PS (3) Improvements to the Building Environment. (4) Class organistion for Sept 2016.
Research Project Our school is called Elworth Hall Primary school. We are located in Elworth, a small area within Sandbach. There are approximately.
Remodeling tips to make your home more wheelchair and handicapped accessible.
Buy Commode Wheelchair Online Wheelchaircentral.in.
Ashton Hayes Primary School
Designing Dulwich Workshops Report 22 March, 13 April and 5 May 2016
How easy is your building to use?
“kicking on to the finish”
Vehicle Modifications for Special Populations
New Buildings Proposal
Diocese of Northampton Scott Tallon Walker Architects
JOB PRODUCTION One job is done at a time from start to completion before another ‘job’ is started One product is made at a time Eg house building, bridge.
St Peter’s CE Primary School
Quality of Education.
Modern Dining Room Chairs
Commode Wheelchair. About Us Toilet Wheelchair for Sale Online. Buy Commode Wheelchair with Built in Pot for Senior Citizen and Elderly. Easy to use.
ISG CONSTRUCTION WELCOME HUNSLET MOOR PRIMARY SCHOOL
How easy is your building to use?
Trip to St. Mark’s College Thursday 2nd May– Friday 3rd May
Threlkeld Village Hall
Front of building. Mrs Neil (our School Business Manager) visits York to see our new school building.
Year 6 Transition Information for Ruskin
Art Building Assessment
Presentation transcript:

St Patrick’s Primary School Mansfield Disabled Access Project Consultants:CP Associates Construction:Tanbury Construction, Mansfield Cost:£175,938 Construction:April – September 2008 Further Information : Mrs A. Castledine

Problem/Issue This is the 2nd phase of a 3 phase project started in We have twin girls, currently in Year 1, with severe, global mental and physical delay. They require space for equipment and staff, changing facilities and wheel chair access around school.

Solution (1) Phase 1 created a large changing room/disabled toilet and large store room for equipment. This build linked the Foundation Stage Unit to Main School building. Phase 2 was to facilitate the girls’ move into Key Stage 1. The Year 1 classroom has been enlarged – so that it is almost half as big again, a disabled toilet/changing room, store room and bigger cloakroom area added.

Solution (2) It is expected that this cohort of pupils will stay in this classroom for Years 1, 2 and 3 by which time Phase 3 will have been completed (making one of the Key Stage 2 classrooms bigger). In addition a ramp was built as an extension alongside the School Hall to give wheelchair access between the lower part of the school and the Dining Room/ICT suite which is on a higher level.

Impact Year 1 classroom is now big enough to accommodate the staff and equipment. There is improved disabled access between the two levels of the school. Other pupils can also use the ramp to access the Hall without going through the Dining Room and past the stage

Issues The ramp is quite steep. The disabled toilet is very small for the needs of the two girls. However, we are able to use the ramp and the toilet and believe that both were the best solution at the time of construction.

The Ramp leading from the Higher Level to the Key Stage 1 classroom – it is a little steep but handrails help Toilet/Changing Facility – it can accommodate one pupil but is a tight squeeze

The Classroom – now there is room for a discrete wet area and plenty of room for equipment The Store – adjacent to the classroom so very easy access to specialist equipment