MSD II Week 5 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System.

Slides:



Advertisements
Similar presentations
Time Management.
Advertisements

Multidisciplinary Senior Design Rochester Institute of Technology Dresser-Rand Painted Post P10459 MSD II Update Presentation 4/9/10 Team: Phil Eaton (ME)
TEAMWORK IS A GOOD THING This year, the BCC Electrical Department and Eckcraft Metal Arts have teamed-up with Orange County Choppers, the stars of Discovery.
Lesson 13. Music: Oh, I’m a lumberjack, and I’m okay, I sleep all night and I work all day.Chorus: He’s a lumberjack, and he’s okay, He sleeps all night,
Functional Analysis and Physical Decomposition ME/EE 386.
Making a Difference Legal Secretaries Dursteler Schwendiman & Harris Providing quality legal services for over 40 years.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review March 20, 2008.
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
Transaction. A transaction is an event which occurs on the database. Generally a transaction reads a value from the database or writes a value to the.
HOW TO BE A STAR ON THE WRITING STAAR. HOW A STAR PREPARES FOR STANDARDIZED TESTING 1. Get a good night’s rest. 2. Eat a healthy breakfast. 3. Be positive.
Welcome to our Third Grade Class Mrs. Tammy Davis Please Look Around! Also, please add your address on the sheet at your child’s desk!
Brainstorming & Project Management
1 HCC Brandon Independent Study Orientation Power Point Instructor: Tiffany Cantrell.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Fiberglass Chassis Cover 101 Why custom shape lightweight strong Why not time consuming Brought to you by: detail oriented can be costly.
Words to Know Warm-Up Worksheet!
MSD II Week 2 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System.
USING MODEL FORMS from the Grants Administration website  The model forms downloadable from the Grants Administration site are templates, designed to.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
OVERALL ROBOT DESIGN, FTC STYLE PRESENTED BY: ANDY BAKER Sept
Scott Coffin Adam Faucher Jason Graika Brian Voelz Client: Honeywell Advisor: Dr. Zhengdao Wang.
The Local Squire of a beautiful village wants to produce a small scale replica of the village centre using natural looking materials. The replica is.
Dr. Catherine Turner Assembly drawings.
FEBRUARY 15 TH, 2013 RIT MSDI Detailed Design Review P13265 Motorcycle Safety Light Backpack System.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
PROJECT LOG MOLLY ATKINSON. 10/09 Today, I got to grips with the course outline, which included creating the relevant folders for all my future publications,
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Mike Baer – Team Leader Tyler Davis – Chief Engineer TJ Binotto – The Mediator Eric Dixon – The Do All Electric Guy Ben Shelkey – Every Team Needs a Crazy.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
Ian Frank Matt Walter Jesse Steiner Luke Spencer Mike Celentano Nick Balducci Team Lead Chief Engineer Electrical Engineer Industrial Engineer Electrical.
Complete Branding with Video Kit Everything you need included (does not include items you already have)
Proposed Agriculture Courses Board of Education October 6, 2015.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
MSD II Week 7 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System.
MSD II Week 6 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System.
Using ALEKS to Teach on Online PreCalculus Course Dr. Kevin Hopkins Southwest Baptist University
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
1 Work Orders. 2 Generating a Work Order There are two methods to generating a Work Order in the WYNNE STSTEM. First method: Option 11 – 12 – 13 * Open.
Steps for the Teacher to do  Make 2 versions of the picture but put the faulty bulb in one of the circuits.
Brainstorming & Project Management ENGR Brainstorming  Proposing new ideas  Free flowing exchange of ideas  No judgment  No decisions  Build.
Project Overview  An introduction to 3D printing  Designing 3D printing parts  Redesigning the Clawbot  3D printing new Claw components  Assembling.
Project: P08371 Portable Command Post Rick Chadwick ME Harith Wijetungage IE Scott Pudlewski EE Sponsors: Technet Global Services DiLorenzo Electronics.
Subsystem Build & Test Review
Project Overview Introduction & Product Analysis
Troubleshooting Roku com link Activation Issues
Robotics and Automation
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Getting Started and working with Pearson myautomotivelab
Concept Generation: ID-3D Design’s Initial enclosure concepts are generated based on specifications, requirements and preferences from the client as well.
Balance Training Bicycle 2.0 P10001
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
HOW TO CHECK YOUR PROGRESS
Starter On page 9 of your book answer the following questions.
Mechanical Bioreactor
Sketchbook Page 8 How to draw a tree
Starter On page 12 of your book answer the following questions.
Starter On page 10 of your book answer the following questions.
Starter On page 8 of your book answer the following questions.
Team P16228: Magnetically Levitated Propeller
Detailed Design Presentation
Science Fair
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
PDT176 COMPUTER-AIDED DRAFTING CHAPTER 6 WORKING DRAWING
Presentation transcript:

MSD II Week 5 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System

Mike: Action Items Status Lens Covers o Incomplete:  Shell is ~2 weeks behind schedule  Material arrived early this week Test XBee's and Bullet Connectors on Bike w/TJ o Incomplete, due to XBee units o Will test this weekend depending on XBee status Tech Paper o In Progress o Need to review with TJ, no more content to add from me until build is furthered

Mike: Next Steps for Week 6 Begin Making Lens Covers ~ ? Assist with light wiring~ 2 hrs

Tyler: Action Items Status Shell Rework/Remake o Incomplete o Have not been able to complete much because of Killian being sick. Material purchased and cut, will be pieced together today and sanded to form. Plan to get shell manufactured Sunday. Assembly Plan 75% Done o Complete Poster o Incomplete, not much time to work on Poster due to Killian being sick and other work. Major work to be completed on it once shell is finished.

Tyler: Next Steps for Week 6 Finish new mold ~6 hrs Finish shell ~3 hrs Shell Assembly ~15 hrs Poster Work ~5hrs Assembly Plan (Final details will be completed alongside the actual assembly of thr backpack) EDGE update ~3 hrs

Ben: Action Items Status Finish electronics housing box o complete, minus glue o This took far more time than I anticipated o Machine screws were changed in favor of sheet metal screws Other: o I tried to reach Andy this week but prior commitments prevented us from meeting (this is to take measurement of his motorcycle) o Quick connect assembly plan was written o Tx box alterations are still on hold until internal components are configured

Ben: Next Steps for Week 5 Glue remaining pieces in place Meet with Andy Nauss and complete work on quick connect

Eric: Action Item Status Continue MSP430 Development o In Progress o Framework is continuously being modified. Board error identification o Complete o All errors located, documented.

Eric: Next Steps for Week 6 MSP430 Development ~ 15 hours Assist TJ with board build and test

TJ: Action Items Status Continue Tech Paper o Complete o Added more paragraphs to revise with Mike Populate PCBs o In Progress o Meeting with Dr. Fuller to manufacture adapters o Will spend Friday in the lab Test XBee Units and Document Tests o In Progress o New Units in and Old Units sent to Digikey for review

TJ: Next Steps for Week 6 Continue Tech Paper ~ 2 Hours Populate PCBs ~ 10 Hours Test XBee's in Lab and on Bike ~ 2 Hours EDGE Update ~ 2 Hours

Killian: Action Items Status Vacuum Form the control panel 3 times, sand and assemble: In Progress Continue Sketching internal pockets/configurations: In Progress Develop possible branding (product name, logo): In progress

Killian: Next Steps for Week 4 Refine Sketches and concepts and start to render in photoshop and illustrator~8 hours Assist Tyler in backpack assembly~5 hours Assist Tyler with poster layout?~2 hours?

Major Week 6 Action Items  Mike- Lens Covers (hopefully)  TJ - Populate PCBs

Lessons Learned Mike o A backup plan will be necessary to complete our final assembly by Imagine RIT. Tyler o A good fallback plan for the mold was not in place which has pushed it's completion time back even more. Ben o What i said about being in the machine shop after 9 isn't necessarily true anymore- a student was caught with an illegal item they supposedly fabricated in the machine shop so now hours are more rigidly enforced o check, check and then check again when making measurements

Lessons Learned cont. Eric o Travelling for interviews takes more time and is more distracting than expected. TJ o Capabilities to make small 'adaptors' for the EH board and can do this in house, thus saving the group some money Killian o I'm not surprisingly good at not sleeping, I get sick the next week.