P ENN S TATE M ILTON S. H ERSHEY M EDICAL C ENTER C HILDREN ’ S H OSPITAL January 30, 2012.

Slides:



Advertisements
Similar presentations
Welcome Simulation Planning Workshop. Todays Objectives and Goals Learn from others who have been through the process Use the Simulation Planning Guide.
Advertisements

1 MD DOCUMENTATION TIPS Addendum to Basic Documentation Training.
1 1 EMERGENCY ACCREDITION TEAM. TRAINING and ORIENTATION Did you receive any training of the following : BLS and Other life support. fire and safety.
Journey to a new beginning
RRMC RITE Training for Physicians and Physician Extenders Part 2: An In-Patient Comprehensive Review The presentations should open full screen in “Show.
Impact of Water Outages and Restrictions on Healthcare Facilities
JC Stroke Specific Visit Preparation 2008
Video produced by West Holt Medical Services Foundation West Holt Medical Services’ Hospital Dusty Shoe Virtual Tour November 2011.
Developing and Strengthening Staff Competency: From Age Specific Competencies to Workplace Violence Training, How Are You Doing?
Fire Safety Training.
Introduction to the Lurie Animal Facility. Agenda Welcome Business Plan Overview of Lurie Facilities Location of your animals Logistics Accessing the.
Duke Cancer Center Facility Overview. Duke Cancer Center Facility Rationale & Overview Project Summary Transform the treatment experience of patients.
Super Storm Sandy 2012 Robin Haag Coney Island Hospital Infection Control Department.
VPNG State Conference 2009 Sandra de Rome - Deakin Dave McCurdy - MFB.
Management Of Information. (MOI). The Medical Record will be arranged in a reverse Chronological Order (i.e. the most recent admission/ outpatient visit.
City of Lynden Ambulance Utility Cost of Service and Rate Study Fire Chief Gary Baar Presented by.
Integrating High Fidelity Simulation into Clinical Orientations INTEGRIS Baptist Medical Center Nursing Education & Research.
Welcome to DCH Cancer Center The Region’s Cancer Center.
CLINICAL ENGINEERING part(1) Dr. Dalia H. Elkamchouchi CLINICAL ENGINEERING part(1) Dr. Dalia H. Elkamchouchi CLINICAL ENGINEERING part(1)
Organizational Structure of the Hospital
Welcome new Credentialed Trainer Fellows & Credentialed Trainer Faculty! Whitebox, Training Room 3 May 20, 2013.
EDUCATION & STUDENT HOUSING UNIT LEADER HUMAN RESOURCES UNIT LEADER INCIDENT COMMAND CENTER UH 1307D INCIDENT COMMANDER LOGISTICS CENTER CONFERENCE ROOM.
“The Big Top” – An Innovative Approach to Design Driven by Families and Providers Presented by Helen DeVos Children’s Hospital Jonathan Bailey Associates.
NHSC Virtual Job Fair Information Session for Sites Bureau of Clinician Recruitment and Service Health Resources and Services Administration U.S. Department.
JCAHO UPDATE June The Bureau of Primary Health Care is continuing to encourage Community Health Centers to be JCAHO accredited. JCAHO’s new focus.
The Physical Environment Tracers How Should I Prepare for the Physical Environment Tracers? Healthcare Engineering Consultants  Will limit.
Ambulatory Infusion Center Business Plan
MEDICAL EQUIPMENT AND UTILITES MANAGEMENT Louis Stokes Cleveland, Department of Veterans Affairs Medical Center JCAHO Environment of Care Series Fiscal.
Briggs Representatives Kristy Petersen, RN, CHPN, Clinical Consultant for Home Care, Hospice and Assisted Living
Space Planning and Construction. LDR Room Renovations Completed on August 21, 2013 Microbiology Lab Reorganization Completed on October 9, Willard.
4C’s Clinic Redesign Operational Snapshot July 28, 2005.
Planning for Successful Simulation Simulation Planning Guide - A Guided Discussion.
Watch University Grow January 2009 University Hospital’s new Heart & Vascular Institute, a four-story, 199,000-square-foot facility consolidates all state-of-the-art.
Design Computing Theory Yeonjoo Oh Dec. 4th. 02 Evaluate architectural design - Perspective images, Path, Relation of spaces, and users’ conditions.
Weekly Survey Prep Tip 9/30/13 Staying Survey Ready.
Our Annunciator Program Is the Most Effective Tool Available for Displaying Information to Large Groups. Annunciator Is... Fast & Easy To Use - By simply.
BUILDING ANALYSIS Established in PG5 is a diverse building, consisting of the following:  Parking garage  Classrooms  food court (seats 300) 
COTE Fellow Chat Intro. Community of Practice 1 2 Learn More: ote/ Join: te/fellowship-expectations/
AJAYI OLUWABUKOLA O. NSC/2008/128 MUHAMMED FATIMOH.M NSC/2008/176 NWABEKE QUEEN E. NSC/2008/178 OGUNBODE IBIRONKE T. NSC/2008/186 OGUNDARE IBUKUN K. NSC/2008/187.
Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.
Part 5: Meeting the Challenge of the “EC Tracers” Healthcare Engineering Consultants How Should I Prepare for the “EC Tracer” Part of the Survey?
Equipment Planning and Project Consulting Technology Management.
Healthy Schools Conference December 4, Largest health system in Minnesota Not-for-profit Diverse organization 11 Hospitals 90+ clinic locations.
Sheikh Zayed Tower.
Copyright ©2012 Delmar, Cengage Learning. All rights reserved. Chapter 21 Facilities Management and Emergency Preparedness.
10Canteen Conference Center 9Medical/Surgical Unit ICU Stroke/Rehabilitation 4Central Sterile Processing Administration Lab 3Surgery CVICU Surgery.
SURVEY READINESS FOR HOUSEKEEPING/ENVIRONMENTAL SERVICES Randy Benson, PhD Consultant WHS Healthcare Quality Service.
Management of Environment of Care. Overview Safety Fire Safety Security Management Hazardous Materials and Waste Management Emergency Preparedness Medical.
NAME THAT CAREER!. Can you guess how many different careers it takes to run a hospital or large health care facility? Not Just Doctors and Nurses.
Introduction to JCI Standards &
Rotary Global Grant Medical Supplies and Equipment for a Village Primary Health Care Center in South Sudan.
Meditech 6.0 Upgrade ED TRAINING SESSION 1. Agenda My Steward Review Tracker Orientation (Main, RN, Charge RN) ED Visit Data Discharge Routine Ability.
Institutional Pharmacy
EMERGENCY DEPARTMENT MOH Nga Manea
LEARNING EVENT 18th JANUARY Teams, Process Maps and PDSAs
UTILITIES MANAGEMENT.
Comprehensive, Collaborative System of Crisis and Emergency Care
Final Presentation Presented By: IOE 481 Team #3
Hospital Emergency Response Training—Home Training
MEWS- Modified Early Warning Score
Teamwork Geriatric Interprofessional Training
City of Lynden Ambulance Utility Cost of Service and Rate Study
Ambulatory Practice of the Future
FirstNet Leaning Statements & Competency
Pediatric Competency Development
2017 Guardian Angel Program™ by Centurion
TCPI Project Pathway: Session 5 of 8 Streamlining Clinical and Office Work – Milestone # 22 (27for primary care)
Idea documentation #3 Identifying children and youth at risk of social exclusion
SBAR Process July 2012.
Presentation transcript:

P ENN S TATE M ILTON S. H ERSHEY M EDICAL C ENTER C HILDREN ’ S H OSPITAL January 30, 2012

A GENDA PART 1 - Introductions & Recap from last meeting PART 2 - Walkthrough of the spaces PART 3 - Process Modeling- identifying users, scenarios, tasks -Research Objectives discussion -Next Steps

M EETING ON D EC 09, 2011 Focus Groups Breakout sessions Identify Scenarios & Tasks

SCENARIOS ED to Elevator Emergency Diffusion Finding PICU LocationsAdmission of PatientsWorkflowsInfection Control Checks Family ED to Patient RoomsED to Patient Rooms Code: Space Maneuver in room Training Staff what not to do TASKS Path to Radiology from stairs and non public areas Patient Care FlowShut off Gas Valves Elev-->Room Room--> Rest Room Room--> Nurse's Station Room --> Roof Garden Room --> Roof Garden Elevators Wait times Path Constraints Swipes Pulling up X-rays Where do I find what I need Path to Pharmacy from 1. stair 2. non-public areas SPACES Pharmacy Treatment Room 3 & 4 Bridge 2nd floorRadiology Isolation Rooms Clean Workstation Patient Care IVRM & AntiBlood BankPIMCU (4th floor) Infusion Room 1st floor Conference Rooms DecontaminationMedication Rooms OBJECTS – LOD (Level of Detail) Crash CartsGas Shut off Valves Fire ExitsAED 1st - 5thGlove BoxesBoomHeadwall Computer StationsPyxis Machines Fire Extinguishers P-Tube Stations Needle Disposal

S PACES I DENTIFIED FOR TODAYS MEETING 4 th Floor Central Pharmacy Patient Isolation Room with Dialysis Treatment Room Clinical Care Documentation center Clean Supply Room 2 Soiled Utility/ Lab Medication Prep Room

M ODEL P ROCESSES GUI elements Task conditions in database with triggers 3D Geometry from BIM in scene GUI elements Objects for scenarios Avatars with behavior and GUI for scene USERSSCENARIOSSPACESTASKS other tasks... other spaces... other tasks... other scenarios... other areas... Objects for tasks Level Of Detail

R ESEARCH O BJECTIVES ( FOR PSU) Evaluate EVPS with end users (for e.g. nurses) Define metrics Develop instruments Logistics Deliver interactive virtual models for use by CH

O BJECTIVES ( FOR CH) Educate staff about the new facility Leaders- Figure out new processes- Develop orientation processes Resource for patient’s families/ caregivers Design, Layout & placement e.g. Pharmacy Mar/ Apr/ May - Orientation

N EXT S TEPS Plus/ Delta Analysis for today’s meeting Where do we go from here? Set date for next meeting Expectations Homework

F EATURES & F UNCTIONALITY

G ENERATION OF R EUSABLE M ODEL C ONTENT Repository of Reusable Model Content Interactive elements Medical equipment Moveable objects Avatars of user roles Behavior Scripts

C ONCEPT

O PERATING ROOM MOCK - UP

1. D ESIGN & C ONSTRUCTION T OOL (R EVIT )

2. V ISUALIZATION T OOL (3 DS M AX )

3. I NTERACTIVITY T OOL (U NITY 3 D )