Www.share-project.org Harmonisation across countries in SHARE Workshop on Harmonisation of Social Survey Data for Cross-National Comparison Prague 19.

Slides:



Advertisements
Similar presentations
Joint Action for ECHIM European Community Health Indicators and Monitoring Antti Tuomi-Nikula National Institute for Health and Welfare (THL), Helsinki,
Advertisements

ICAO TEM/NOSS Symposium November 2005
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
8th meeting of the Task Force on Health Expectancies Session 3 – Improving current HLY estimates The health questions in SILC 2007 and 2008.
Augur Consulting, s.r.o. Final report „A study of the language skills of the Czech population“ November 2008.
 They speak German  8.47 million of people live there.
Survey Design Steps in Conducting a survey.  There are two basic steps for conducting a survey  Design and Planning  Data Collection.
QMSS, Lugano, Lynn Control of Sampling Error Peter Lynn Institute for Social and Economic Research, University of Essex, UK.
Multi-language CASCOT Margaret Birch and Ritva Ellison Institute for Employment Research.
Lessons from the Eurobarometer 2007 Additional analysis from the Belgian perspective Sergio Perelman CREPP, HEC-Ecole de Gestion, Université de Liège.
Welcome to the iTEC People & Events Directory … key points!
MEADOW: Guidelines for a European survey of organisations Nathalie Greenan CEE and TEPP-CNRS Exploring possibilities for the development of European data.
December 2010iTEC - Designing the future classroom1 Virginija Birenienė iTEC community moderator iTEC Edukata tools in Education.
SHARE and its Policy Lessons from International Comparisons Axel Börsch-Supan Coordinator SHARE Israel Van Leer Institute, Jerusalem, 17 October 2012.
IBM Maximo Asset Management © 2007 IBM Corporation Tivoli Technical Exchange Calls Aug 31, Maximo - Multi-Language Capabilities Ritsuko Beuchert.
IATE EU tool for translation-oriented terminology work
The MIMOSA Model for Estimating International Migration in the European Union James Raymer and Guy Abel February 2008 MIgration MOdelling for Statistical.
Mannheim Research Institute for the Economics of Aging SHARE IDs Stephanie Stuck MEA Frankfurt December 6 th.
CASCOT AND THE CODING OF OCCUPATIONS IN EUROPEAN SURVEYS Demonstration of CASCOT Presentation for the InGRID Workshop Amsterdam, February 2014 Ritva.
Topics in Empirical Economics. Intellectual approach: 3 key dimensions Social Living arrangements, partnership, family, social networks, social support.
Monique Meron et Anne-Claire Laurent-Zuani ESSnet ESEG Feb 2012 The answers to the questionnaire sent to the NSIs First results.
DataLyzer software Training. Introduction The purpose of this PPT is to give you quick information on the functionality of DataLyzer and to guide you.
SHARE Conference Paris, March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.
1 SHARE Pretest 2010 Feedback & Results. 2 Schedule.
Laura Crespo SHARE Meeting on Data Cleaning The Analysis of Interviewers’ Remarks Laura Crespo Spanish Team CEMFI Frankfurt December 6, 2007.
Data cleaning workshop Berlin, 8-10 June 2009 The Analysis of Interviewers‘ remarks Laura Crespo Spanish team CEMFI.
LLP-LdV-TOI-2007-FR-008 VALORIS TIQSS. LLP-LdV-TOI-2007-FR-008 The partners of the project.
National design, fieldwork and data harmonization for Labour Force Survey Irena Svetin Statistical Office of the Republic of Slovenia September 2014.
Introduction to the training dataset Alexander Mack.
MICS Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Overview of the MICS Process.
Training on occupational classifications. Name of the presentation Introduction ISCO 08 has started to be implemented in the EU countries in several social.
Mannheim Research Institute for the Economics of Aging SHARE data versions & IDs Stephanie Stuck MEA Antwerpen February 2008.
Comenius Individual Pupil Mobility. Individual Pupil Mobility Aims of the action-1  Allow secondary school pupils to spend between 3 and 10 months in.
ESS Slide 1 Quality assessment of MEHM in SILC Eurostat Unit F5 “Health and Food Safety Statistics” 4 th meeting of the Task Force on Health Expectancies.
Wave 2 Data Release and Workshop on First Results Brussels, November 28, What SHARE is all about -Thanks -Some important results Axel Börsch-Supan.
CIS-Workshop on „WFD and Hydropower“ June 2007 Berlin, Germany - First Workshop under Phase II ( ) of the EU activity „Water Framework Directive.
Eurostat Ag.no "Annex 2" supplement to Eurostat Annual Report, October 2015 Working Group on Article 64 and Article 65 of the Staff Regulations Meeting.
Mannheim Research Institute for the Economics of Aging SHARE Data Cleaning General rules and procedures Stephanie Stuck MEA Antwerp.
Special Features: Colour: Blue/ Grey Shock resistant USB 3.0 mobile solid state drive Integrated USB 3.0 cable, no additional cables needed IP55 – dust.
Oracle Supplier Management Solution Product Availability
Urban Audit 3 State of play
Working Party on Regional Statistics 1-2 October 2012
Point 5. Countries plans on Time Use Surveys
Update on the UOE 2012 data collection
Working Party “Cooperation on Land Cover/Use Statistics”
Ag.no. 15 Lessons from the 2015 A65 exercise
Education and Training Statistics Working Group, May 2011

Report on WISE Art.8 and GIS issues
Habides update (May 2011).
on Priority Substances Strategic Coordination Group
LAMAS October 2016 Agenda Item 2.1
Comparison of EHIS source questions with national survey questions
Item 7.1 Implementation of the 2016 Adult Education Survey
Item 8.1 Implementation of the 2016 Adult Education Survey
Item 7.1 – Overview of 2012 UOE data collection
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
DATA ACCESS IASSIST workshop on Access Policies and Licensing for Archives and Repositories Eric Balster (CentERdata) Cologne, May 28, 2013.
State of play: data transmission, validation and dissemination
Statistics Explained goes multilingual
Item 4 Overview of the 2016 AES & 2015 CVTS data collection
Grants for the implementation of ISCO 08 during 2010
STEM Education Policies and Practices in Europe
Item 8 - Disability statistics
EU-SILC Tracing Rules Implementation: Pros and Cons
LAMAS Working Group June 2015
WP3 – Current and Future Data Collection Systems in the ESS
Input Presentation for Working Group 6
LAMAS Working Group June 2018

Presentation transcript:

Harmonisation across countries in SHARE Workshop on Harmonisation of Social Survey Data for Cross-National Comparison Prague 19. October 2010 Stephanie Stuck MEA, University of Mannheim

Cross-national, Interdisciplinary & Longitudinal Survey of Health Ageing and Retirement in Europe

SHARE Population  Residents aged 50 and over & their partners  Wave 1 (2004/05): AT, BE, CH, DE, DK, ES, FR, GR, IL, IT, NL, SE  Wave 2 (2006/07): new countries: CZ, IE, PL  Wave 3 (2008/09) Life Histories  Wave 4 (2010/11): new countries EE, HU, LU, PT, SI 20 Countries

Ex-Ante Harmonisation  Ex-ante harmonisation in SHARE takes place at various levels and all steps of the process  Organisation  Contracts with survey agencies  Interviewer Training  Fieldwork  Questionnaires & Translations  CAPI & SMS (sample management system)  Data processing & releases  Documentation

Organisational Features  Central coordination: MEA, University of Mannheim  Country teams in each SHARE country  Area teams:  Economics  Health  Social Networks  Teams for weights and imputations  Programming and technical data processing: CentERdata (Tilburg, NL)

Survey agencies & fieldwork  Model contracts provided by MEA  Interviewer training is centrally coordinated  3 Train the Trainers (TTT) workshops per wave (pilot, pretest & main survey ( at least 2 days each))  Training contents  Model for national training sessions  Country teams are present at TTTs and national trainings  Common sample management system (SMS)  Information on all households, contacts, refusals, interview status…  Central fieldwork monitoring

Questionnaires & Translations  Generic English versions  Baseline  Longitudinal  End of Life  SHARELIFE  Translated in all SHARE languages  Arabic, Czech, Danish, Dutch, Estonian, English, French, Flemish, German, Greek, Hebrew, Hungarian, Italian, Polish, Portuguese, Russian, Slovenian, Spanish, Swedish  Internet based translation tool: LMU (language management utility) developed by CentERdata

Translations Tool LMU

LMU  Generic questionnaire version is displayed on the left side  Translations are entered on the right  Standard answer categories, sequences or fills have to be translated only once  Show cards are derived automatically  Information on status of translation is displayed

Translation Tool LMU

CAPI & SMS Instruments  One common CAPI and SMS program for all  Translations are transferred automatically from LMU  Instruments (and preload) are transferred to survey agencies via central server  Raw data goes back to central server

Data processing  Data processing is coordinated by MEA and done in very close cooperation with country teams to insure harmonised processing  Instructions and program templates are provided by MEA  Country teams write programs  MEA runs all programs centrally  Weights and imputations are computed by special teams for all SHARE countries centrally  Generated variables are produced by MEA

Ex-Ante Harmonisation  Requires a lot of…  Meetings  Coordination  Communication  Discussions  Compromises  Has some limits, therefore we  document country specific deviations  do ex-post harmonisation

Documentation of Country Specifics

Ex-Post Harmonisation  Education: ISCED  Occupation: ISCO  Industry: NACE

 Comments or Questions ?

Thank you !