Contestant Briefing Hello I am ______and this is ________. You are to conduct a Pre-shift examination of the Bee No. 1 head gate section, for the oncoming.

Slides:



Advertisements
Similar presentations
A co-worker operated the machine from the center controls. He was advancing the machine when the accident occurred. The victim had installed 2 roof.
Advertisements

Delta Day 2. BC Pump Discharge Permanent Stopping.
BRATTICE CLOTH 3.2 % CH4 10 PPM CO 19.1% 02 UNSAFE ROOF.
Tool Crib W/Door Closed N RD 5,000 cfm First Team D&I /FPA XXXXXXXXX Caved Tight FAB X Timbers (4) XXXX Caved Tight Unsafe Roof & Rib X Timbers (5) XXXXXXX.
2014 Pennsylvania State Mine Rescue Contest Team Statement Thank you for responding to this emergency to the Carmike Mine # 3. This mine had been an active.
1 2 Outline Airflow Measurements –How to take air readings –Measuring areas –Mean Entry Velocity Principals of Airflow When and Where to take Air Measurements.
Control of Airborne Respirable Dust Hazards: A Training Program for Underground Coal Miners The Penn State Miner Training Program University Park, PA
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Delta Day 1. High Voltage VCB Switch Open High Voltage VCB Switch Open.
BO LC TEAM NO. ______ FIELD NO. ______ SCALE 1” = 10’ X Clock 2013 Robert Earl Jones Mine Rescue Contest D Hardened Room BC B X X X X Battery Ramcar X.
26 TH ANNUAL CONTEST JUNE 5 TH INDIANA STATE MINE RESCUE CONTEST.
2011 Colorado Metal and Nonmetal Mine Rescue Contest July 12 th thru 14 th, 2011 Idaho Springs, Colorado.
2014 A Skills Mine Rescue Problem. Mine Rescue Statement 2014 A Welcome to the Happy Go Lucky Mine. This is a high wall mine with a history of water and.
2014 SOUTHEAST REGION FAB MAP FRESH AIR BASE BC x 20 POST.
Colorado Mine Rescue May 2015
NEXT SLIDE. 06:26 am 1 st Left crew arrives at section switch.
2015 Post No.5 & West Virginia State Mine Rescue Contest Day 2 Problem Briefing.
On-Shift Examination Scenario Continuous Miner Section What you will need: Pencil and paper to take notes or perform calculations Calculator to calculate.
Aug 1 st 2014 Mine Rescue Practice Problem Ole Smokey # 9 mine.
2015 A Skills Mine Rescue Problem. Mine Rescue Statement 2015 A Welcome to the New View Mine. We have encountered a problem and your assistance is needed.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
2013 MTTC Pennsylvania Regional Skills Contest April 22-25, 2013.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Problem Briefing 2013 Day 1 Problem Briefing ACA DAY 1 Statement You are located on the surface of RT #15 mine. This is a new highwall mine that.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Pre-Shift Examination Scenario Continuous Miner Section What you will need to complete this exercise: Pencil and paper to take notes or perform calculations.
Ventilation Map N FAB Entry 1 Entry 2 Entry 3 D East Decline West Shaft (Intake) Door Closed Temporary Stopping A Temporary Stopping B Mine Fan ON/OFF.
Indiana Mine Rescue Statement 2013 Thank your for assisting us with our emergency at the Vincennes No. 1 Mine. You are located at the fresh air base established.
BO LC TEAM NO. ______ FIELD NO. ______ SCALE 1” = 10’ B X Battery Scoop X D Overcast Door Open X Battery Golf Cart RA Unconscious Live person x D 10’ Diameter.
2012 Mine Rescue Contest Day 1 36 th May 15 th 2012 Judge’s Briefing.
D D PC B Loose Roof End of Water x x x x Suction hose 6 posts x x Posts set Refuge chamber Sump with pump Door opened Door closed Water over knee deep.
Date - 01/02/2003 San Juan Coal Company Thermal Coal Customer Sector Group 1 #BHP Roof Control Jeopardy.
STATEMENT Welcome to the TG Mine and thank you for your help. We have a 5 person crew that was tagged in on the mine tag board. They were working an idle.
Rock Springs Mine Rescue June 2016 – Day 1
SAFE WORK INSTRUCTIONS
2013 Skills Mine Rescue Problem.
Delta Day
SAFE WORK INSTRUCTIONS
2012 Knight Hawk Coal Mine Rescue Contest
Workplace Examinations
Price 2017 Day 1.
SAFE WORK INSTRUCTIONS
N N D D C Ventilation Map FAB Entry 1 Entry 2 Entry 3 Jim Swan 30-inch
38th 2014 Day 1 Problem Briefing Problem Briefing.
KCA Regional Skills Contest July 31, 2012 Mine Rescue Problem
Ventilating The Face Area
2016 KCA Regional Mine Rescue Skills April, 7th 2016
2013 Day 2 Problem Briefing Problem Briefing.
Tankabel Mining Co., Inc. I.D. No Rochester, NY Map Legend:
2015 KCA Regional Mine Rescue Skills April, 9th 2015
KCA Regional Skills Contest April 11, 2013 Mine Rescue Problem
2016 Post 5 & West Virginia State Mine Rescue Contest Day 2
2014 Illinois State Mine Rescue Contest
2013 Indiana Pre-Shift Contest
Projected Development
2012 PA Regional Skills Contest
Roof Control Jeopardy.
Day Two.
2012 Mine Rescue Contest Day 2
OVERCAST WALL DOOR OPEN
2014 MTTC Pennsylvania Regional Skills Contest
2014 KCA Regional Skills Contest
DAY ONE.
FRESH AIR BASE Placard 1.
2016 KCA Nationwide Skills Championship
2016 Illinois State Mine Rescue Contest
2019 Governor’s Cup PRESHIFT CONTEST Roof Control Plan
Problem Map 2019 Governor’s Cup Preshift Contest No. 1 No. 2 No. 3 C C
2016 Mine Rescue.
BLOWING FAN.
Presentation transcript:

Contestant Briefing Hello I am ______and this is ________. You are to conduct a Pre-shift examination of the Bee No. 1 head gate section, for the oncoming day shift crew. This section is developing 3 entries in preparation for the Crumpton No. 1 longwall panel. The No. 1 entry is the primary escapeway/travelway, the No. 2 entry is the conveyor belt line and the No. 3 entry is the return air course, which is used for the alternate, secondary escapeway. The mine has not produced coal on this section in the past 3 days. This mine has a long history of accumulations of water and produces 17 million cubic feet of methane in a 24 hour period.

Judges Information Show the contestant the check in and check out board and stop watches Point out to the contestant the entries When contestant is ready give them the blank map, vent map, plan page and written instructions. 5 minute review time starts then If for some reason the contestant don’t knock power before clearing the face of No. 3, discount them under rule 15 Please gather all hazard cards the contestant lays down and put them in packet Phone is working if contestant checks it

Last Open Return Air Reading Reading if doors are closed, the check curtain is installed between 1 and 2 entries in 2 nd open and check curtain is installed behind tail piece. 18 feet wide by 6 feet high 537 FPM Reading if contestant don’t have both doors closed, check curtain up between 1 and 2 entries in 2 nd open and check curtain installed behind tail piece. 18 feet wide by 6 feet high 400 FPM

Contestant #___ FIELD NO. ___ Fire boss station 25 foot deep cut x Last row of bolts x Power Center x 480 volt pump x 480 volt pump D Door open C C Loose coal 12’X14” x x x Continuous Miner #11 Roof Bolter #12 x Co Monitor Door open D x Water ankle deep x 480 volt Pump #1 480 volt Pump #2 x Life line o Secondary Alternate Escapeway Life line Loose bearing Plate x x Curtain x Danger Flag x x x Face x 19.4%O2 5.2% CH4 x Battery Mine Phone Feeder # # # # # # # = Crib x Fire Ext. X”s 4 Field Lay Out Map Curtain x x R Mandoor sign Danger flag x Continuous Miner #11 Roof Bolter #12 xc35 xc36 xc37 Xc 38 x Loose bearing Plate

Written Instructions You must verbally identify to the judges all hazardous conditions you find. The incoming power must remain on the section power center unless conditions warrant it to be de- energized Power must remain on the pumps unless conditions warrant it to be de- energized

Mine Plans Ventilation Plan Curtains must be maintained to the last row of roof bolts Blowing line curtains are to be used Belt air is to go outby 50,000 CFM maintained at return stopping line last open cross cut Roof Control Plan Maximum cut depth is 20 feet All places bolted with in 24 hours Maximum width is 18 feet 4 Cribs must be installed in all intersection along the conveyor belt line

Contestant #___ FIELD NO. ___ Fire boss station x Contestants Map 35 cross cut 36 cross cut 37 cross cut 38 cross cut

Ventilation Controls Required by vent plan Feeder Regulator C C C C