17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

Slides:



Advertisements
Similar presentations
Study Committee Representatives Annual Report December, 2012
Advertisements

Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
Harold G. Kirk Brookhaven National Laboratory Targetry Plans and Status MUTAC Review FNAL March 17, 2006.
31.March.2004 C. A. Martins, CERN AB/PO 1 Analysis of the possibility of using of a ALICE/LHCb type power converter in TT2A target test by Carlos DE ALMEIDA.
Transformer Construction
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
Development of Solid State Long Pulse Klystron Modulators
Diode voltage multiplier circuit (Specifically diode voltage doubler circuit). By:Engr.Irshad Rahim Memon.
POWER SUPPLIES. The Power Supply A station’s power supply (sometimes known as a power supply unit or PSU) is a device or system that supplies electrical.
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
The CNGS Horns Electrical Systems The CNGS Horns Electrical Systems 4th workshop on Neutrino Beams and Instrumentation 7 – 11 November 2003 at KEK Gilles.Maire.
IMPACTS OF INSTALLING THE REFERENCE MAGNET PLACEMENT IN B december 2014 Fulvio Boattini & Natacha Lopez Hernandez.
Trieste (IT), 20 may 2008POPCA A novel 60 MW Pulsed Power System based on Capacitive Energy Storage for CERN PS machine Jean-Paul BURNET CERN, European.
 Transmitting power at high voltage and in DC form instead of AC is a new technology proven to be economic and simple in operation which is HVDC transmission.
Chapter 6 Voltage Regulators By En. Rosemizi Bin Abd Rahim EMT212 – Analog Electronic II.
Electrical Discharge Circuit for CNGS Horn & Reflector PH/DT1 Group Meeting, 23 October 2007 Gilles MAIRE PH/DT1-IC Section Leader.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
1 CSCM-7TeV Powering Implementation and ELQA Third LHC Splice Review November 2012 M. Bajko, M. Bernardini, B. Bordini, k. Brodzinski, J. Casas-Cubillos,
Electronics sessional
10.March.2004, phone A.Fabich 1 Technical drawings of TT2A and adjacent galleries Detail – CDD number Overview surface, ----PDP Overview TT2/TT2A/ISR,
Fundamentals of Power Electronics 1 Chapter 19: Resonant Conversion Solution of converter voltage conversion ratio M = V/V g Eliminate R e :
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
EMT212 – Analog Electronic II
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
A second Thyristor Controlled Static Var Compensator for SPS
Ans Pardons (with input from Jean-Marc Cravero) CERN CNGS Horn Experience (issues since NBI2010) Ans Pardons, CERN 1 NBI2012.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
Powering the damping rings wigglers Daniel Siemaszko, Serge Pittet OUTLINE : Powering superconductive magnets, Powering wigglers strategy, Existing.
TECHNICAL PAPER ON SIMULTANEOUS AC-DC POWER TRANSMISSION
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
POPS: Power for PS A novel 60 MW Pulsed Power System based on Capacitive Energy Storage Jean-Paul Burnet June 2010.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
Presentation CERN SPAIN | ITALY | FRANCE | GERMANY | MEXICO | USA | BRAZIL | UAE | QATAR | OMAN | SAUDI ARABIA jema.es.
ELENA installation progress F. Butin / ELENA collaboration.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Introduction High Voltage!!.
The Survey of the Power Supply Reliability at SSRF
CONS and HL-LHC day Analysis of needs from TE-EPC
Rectifiers, Filters and Regulator
Auxiliary power supply (APS) Hossein Harimi 2014
Oscillator.
HVDC LIGHT:- NEW TECHNOLOGY FOR A BETTER ENVIRONMENT
TE-EPC internal review of the ELENA project
MICE RF System Power Supplies, Control and Monitoring Status report
CLIC Civil Engineering & Infrastructure Working Group Meeting
EET 422 EMC & COMPLIANCE ENGINEERING
Chapter 27 Power Supplies.
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
AC Inlet & AC Input Filter
352MHz Klystron Control for the 3MeV Linac test stand
SPS activities during LS2 TE-EPC (Power Converter Group)
TCM PS – SPS Thyratron Power Trigger Consolidation
East Area Consolidation
General presentation about recent status of DRFS
POPS Strategy for Restarting & Repairing
CHAPTER 10 Power Supplies.
RF Power for C75 - Resources
Klystron Power Supplies for ILC
RF Power for C75 - Resources
Rectifiers.
Presentation transcript:

17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)

17.March.2005 C. A. Martins, CERN AB/PO 2 Historic overview First technical proposal (on 31 March 2004): ALICE/LHCb type power converter rated 6500Adc, 950Vdc, 6.7 MW Rectifier Transformers Converter topology

17.March.2005 C. A. Martins, CERN AB/PO 3 Historic overview First technical proposal (on 31 March 2004): ALICE/LHCb type power converter rated 6500Adc, 950Vdc, 6.7 MW Converter location Possibility # 1 - in the ISR gallery Short DC cables, between the power converter and the magnet (~30m); Long AC cables, between the 18kV cell (in bld 193, AD) and the power converter Possibility # 2 - in bld 193, AD Longer DC cables, between the power converter and the magnet; Short AC cables, between the 18kV cell (available in bld 193, AD) and the power converter target

17.March.2005 C. A. Martins, CERN AB/PO 4 Historic overview First technical proposal (on 31 March 2004): ALICE/LHCb type power converter rated 6500Adc, 950Vdc, 6.7 MW Advantages: Brand new system; Forced air cooling (no need for water circuit) Cast resin power transformers. Can be placed indoor Inconveniences: Already short in time for buying a new power converter; Already short in time for buying the power transformers; One ALICE/LHCb spare power transformer can be lend, but that implies higher current harmonics in the 18 kV distribution network; Ultimate current 7250A output; Price: ~300 kCHF for the rectifier part only.

17.March.2005 C. A. Martins, CERN AB/PO 5 Historic overview Second technical proposal (~November 2004): Decommissioned West Area (WA) power converter rated 8000Adc, 1000Vdc, 8 MW Advantages: Availability at the moment; Higher current and voltage ratings; Available power transformers, allowing low current harmonic distortion on the 18kV network Price (detailed later) Inconveniences: Water cooled. Needs water connection to the power converter; Oil transformers. Need to be placed outdoor, in a special pit, for security reasons; Refurbish of power part and control/interlocks cabling

17.March.2005 C. A. Martins, CERN AB/PO 6 West Area power converter 8000Adc, 1000Vdc Converter topology 18 kV cell Power transformers (in an oil tank) 2x4 Rectifier bridges Passive LC filter CROWBAR To be placed in parallel with the first group

17.March.2005 C. A. Martins, CERN AB/PO 7 West Area power converter 8000Adc, 1000Vdc Converter photos, 1 Global view Rectifier bridges Passive filter self Passive filter capacitors self capacitors DC output

17.March.2005 C. A. Martins, CERN AB/PO 8 West Area power converter 8000Adc, 1000Vdc Converter photos, 2 DCCT CROWBAR & controlsPower transformers

17.March.2005 C. A. Martins, CERN AB/PO 9 AB/PO proposition 8000Adc, 1000Vdc Strategy: Refurbishment of the West Area Power Converter, making it compatible with the project requirements Conserving the main components of the power part Installing a new digital control electronic system, type PS

17.March.2005 C. A. Martins, CERN AB/PO 10 AB/PO proposition 8000Adc, 1000Vdc Power Converters location: At building 193 (AD) like ALICE/LHCb converter 2 nd choice target Power converter (193, AD)

17.March.2005 C. A. Martins, CERN AB/PO 11 AB/PO proposition 8000Adc, 1000Vdc Available infrastructures at building 193 (AD): Water circuit in the vicinity of the power converter’s location; Pit for placement of the power transformer (outside the building); 18 kV cell

17.March.2005 C. A. Martins, CERN AB/PO 12 AB/PO proposition 8000Adc, 1000Vdc Estimated tasks, at charge of AB/PO, for refurbishment and costs: Disassembling of power converter at its actual location (BA6) and transport to its final location (Bld 193,AD); Preparation of the zone for reception; Reassembling, cabling work; New DCCT; New control electronics; Connection to the water circuit; Test and commissioning Decommissioning 10 kCHF 5 kCHF 15 kCHF Total 10 kCHF 40 kCHF 110 kCHF 10 kCHF

17.March.2005 C. A. Martins, CERN AB/PO 13 AB/PO proposition 8000Adc, 1000Vdc Tasks not at charge of AB/PO (at charge of TS/EL) AC cabling between the 18kV cell and power transformer; AC cabling between power transformer and thyristor rectifier bridges; DC cabling between the power converter and the magnet