Gestionnaire du Réseau de Transport d 'Electricité 2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation Experiences and practices on State Estimation in RTE (French Transmission System Operator) Patrick Panciatici (RTE), Yacine Hassaine (RTE)
2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation, 2 Presentation of SE in RTE RTE operates the whole French transmission system : (400kV to 63kV, 2500 substations, km of circuits and 1150 transformers), 7 regional control centers and 1 National State Estimation provides input for all network’s analysis Measurements are received every 10 s. An event is sent, when the status of a switching device changes. Which kind of measurements ? Active and reactive power flows on branches, Active and reactive powers on load and generators, Voltage magnitudes in substation on busbars, Internal substation current measurements and tap positions are not transmitted. Coherent state Measurements, Topology Electrical characteristics State Estimation
2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation, 3 Equivalent networks Presentation of SE in RTE National level : SE runs every 5mn 400 kV and 225 kV A part of external surrounding networks is represented in details ( size around 1200 nodes) Regional level (7): SE runs every 10mn From 63 kV to 400 kV A part of external surrounding networks is represented in details. (average size around 1000 nodes) National or Regional network Surrounding networks Network modeling :
2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation, 4 Snapshot Generation : Consistency between topology and measurements A new status may arrive before measurements affected by the switching, this could lead to an incoherent state between topology and measurements and to a problem in state estimation. To minimize the probability of occurrence of this problem, we apply a very important and classical rule to generate a snapshot We wait 20s to generate a snapshot after the reception of the last switching device status. A snapshot is generated after 1mn even if the condition isn’t fulfilled Presentation of SE in RTE t t+10 Measurements (t)Measurements (t+10) switching Inconsistent Snapshot
2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation, 5 Observability : A numerical observability is used, with a decoupled Jacobian matrix. better numerical robustness in SE Critical pseudo-measurements are added in unobservable areas to restore observability. no effect on estimated states The EHV network is more observable than HV network. pair measurement s ( P,Q) in EHV sometimes not in HV The percentage of observable nodes varies from 80% to 92%. Presentation of SE in RTE
2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation, 6 Presentation of SE in RTE Computing algorithms : For real time : A classical L2 cost function is minimized using Gauss-Newton algorithm For off line data validation : A M-estimation function is minimized using a trust region method based on Luvember-Marquardt algorithm. Estimation of OLTC taps, there are two steps : First step : ratios of transformers are considered as continuous variables Second step : ratios are fixed to the nearest discrete value For each node, the estimated nodal injection is dispatched among loads and generators Maximum values are taken into account If the estimated nodal injection is greater than the total of maximum values, a fictitious load is created to balance the system.
2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation, 7 Presentation of SE in RTE Bad data detection : Detection of bad data is based on a 2 test. If 2 test fails, we use normalized residuals to detect bad data an iterative process deletes one by one bad data and reruns a SE (maximum 10 iterations) This approach suppose that only measurement may be contaminated by bad data. This hypothesis is not always satisfied, in this case robust state estimation helps to find the problem. We define two kind of robustness: Numerical robustness, it deals with the reduction of divergence Trust region method Bad data robustness, which reduce the bad data effect. M-estimator rather L2 estimator
2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation, 8 Presentation of SE in RTE Visualization The same tool in : Real time Study mode. we can load a snapshot (green : observable, red : unobservable) For each substation, a comparison is possible between : Estimated state Measured state Figure : The EHV network of RTE (study mode)
2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation, 9 Presentation of SE in RTE Visualization : Figure 2 : 400kV substation, measured stateFigure 3 : 400kV substation, estimated state
2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation, 10 Use of SE in RTE a. Real time operations : State estimation builds a coherent state before any contingency analysis. b. Building of reference base cases : From 2 to 4 reference cases per day are built, which are used to build forecast cases for operational planning, for ATC computation, …. We developed a collaborative process between our 7 regional control centers and our national control center
2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation, 11 Initialization by National Control Center Import snapshot of Region 1 EHV-HV Import snapshot of Region 7 EHV- HV Merging of 7 regional snapshots (EHV- HV) Export state of Region 1 EHV(National)- HV(regional) Export state of Region 7 EHV(National)- HV(regional) manual validation (Region 1) manual validation (Region 7) Merging of 7 regional corrected states (EHV-HV) Final manual validation by NCC (EHV-HV) Export final corrected state of Region 1 EHV(National)-HV(regional) Export final corrected state of Region 7 EHV(National)-HV(regional) … …. Building of reference base cases : principles
2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation, 12 Manual Validation based on quality criteria SE quality criteria : Number of iterations or divergence Number of unobservable nodes Rate of redundancy Number of fictitious loads Possible inconsistencies between topology and measurements Number of critical measurements Number of bad data A change of one these criteria requires an analysis A global quality index based on these criteria is given to each reference base case.
2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation, 13 Building of reference base cases : Work Flow monitoring
2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation, 14 Most important challenges We need to have more coordination between European TSOs, an European network model is mandatory Hierarchical SE. The robustness of state estimation : Still a challenging subject No substation internal measurements transmitted => difficult to detect an error on topology A state estimation running at the substation level could improve the situation. Ensuring the consistency between topology and measurements, full coherent state transmitted (status of switching devices and measurements for example each 1 sec.). To improve the measurement system, the worst stage must be improved first. In our case the first limiting factor is the LAN at substation level ( old protocol using 8 bits for measurements). Calibration of CVT, …