Voltage Support Service (VSS) for CREZ Region and baseline Power angle ranges post CREZ Bill Blevins Manager Operations Planning.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

Arsalan A Rahim EED, UET Lahore. The Edit Mode is used to create a new case or to modify existing cases. In Edit Mode: Create a new case Create a.
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
1 New Generation Commissioning Emal Latifzai Operations Support Engineer New Generation Information Forum ERCOT Public November 4, 2014.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Duke Energy Carolinas Smart Grid Investment Grant Tim Bradberry Tim. NASPI Work Group Meeting October 12-13,
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
System Strength Discussion
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
American Transmission Company Smart Grid Investment Grant Update Jim Kleitsch NASPI Work Group Meeting October 12-13,
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
Small Signal Stability Analysis Study: study prepared by Powertech Labs Inc. for ERCOT Vance Beauregard AEP 9 April 2002.
Visibility 10/1/ Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
Aug 14, 2009 Regional Planning Group Proposed CREZ Project Modifications Warren Lasher Manager, System Assessment.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
College of Engineering and Architecture Using Information to Increase Power Reliability and Reduce Vulnerability Anjan Bose Washington State University.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
American Electric Power Service Corporation Jan 26, Coordinating Controls across CREZ  What dials are available to the operators?  What are the.
Dec 01, 2008 Texas Nodal Market Implementation Nodal System Operations Test Environment (SOTE) SOTE Launch WebEx.
March 2003 Operations Summary Bill Blevins Manager Operations Engineering.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
Lessons Learned from the Texas Synchrophasor Network by Presented at the North American Synchrophasor Initiative (NASPI) Meeting Toronto, Ontario Thursday,
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Gestionnaire du Réseau de Transport d 'Electricité 2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation Experiences and practices.
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
PRR835 – Reactive Power Capability Requirement
CASE STUDY Disturbance event comparing PMU and SE voltage angle difference in ERCOT Prakash Shrestha Operations Engineer Advanced Network Application.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
West to North CSC Location Scenario 3b WMS August 20, 2008.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1Texas Nodal Market Trials Update. 2Texas Nodal LFC Testing Review Review of materials presented at TAC Changes in Market Trials schedule and activities.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
© Property of ERCOT /17/20041 RTCA, CAM, and SFT Presented by: John Adams November 17, 2004.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION Dr. DJORDJE ATANACKOVIC, P.Eng. Engineering Team Leader, Power system Applications, Grid.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
1 State Estimator performance. 2 State of Technology Many metrics have been proposed for measuring State Estimator performance.. PI = min Σ( Z – h i (x))^
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
ECE 476 Power System Analysis Lecture 13: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Voltage Support Service (VSS) for CREZ Region Advanced Network Applications ERCOT.
MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/ TAC3/7/ /22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
1 Nodal Stabilization Market Call December 27, 2010.
Panhandle Renewable Energy Zone (PREZ) Study
Lead from the front Texas Nodal 1 Current Telemetry Dashboards NDSWG March 24, 2009.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Status Update to ROS: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Voltage Control Brad Calhoun Consultant, Sr. Trainer Spring 2016.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
February 17, 2012 Regional Planning Group CREZ Shunt Switching John Adams Principal Engineer.
Nodal Planning Go Live Austin, TX February 3, 2011
Announcements Please read Chapter 6
RTCA Display for Increased Situational Awareness
Barrilla Junction Area Transmission Improvements Project
ECEN 460 Power System Operation and Control
DEC System Voltage Planning - June 2018
ECEN 460 Power System Operation and Control
Presentation transcript:

Voltage Support Service (VSS) for CREZ Region and baseline Power angle ranges post CREZ Bill Blevins Manager Operations Planning

2 O BJECTIVES Identify the purpose for VSS. Identify what system ERCOT uses to operate VSS. Identify control/equipment that is used to manage voltage within VSS. Identify locations VSS is used for. Identify voltage limits that VSS will correct. Identify where VSS is available for TOs. ERCOT PUBLICFEBRUARY 21, 2012

3 MAP OF CREZ REGION ERCOT PUBLICFEBRUARY 21, 2012

4 P HASOR MEASUREMENT U NIT V OLTAGE A NGLE TREND OVER 24 H OURS ERCOT PUBLICFEBRUARY 21, 2012

5 CREZ PROJECT ENERGIZATION ERCOT PUBLICFEBRUARY 21, 2012

6 SE DATA USED FOR THE STUDY ERCOT PUBLICFEBRUARY 21, 2012

7 E XAMPLE COMPARISON OF PMU TO SE DATA ERCOT PUBLICFEBRUARY 21, 2012

8 CAPTURING THE CHANGE IN THE SYSTEM DUE TO CREZ BUILDOUT ERCOT PUBLICFEBRUARY 21, 2012 Largest SE angle into the Valley was % of the time power flows this direction

9 E XAMPLE OF PLOT SHOWING ERCOT PUBLICFEBRUARY 21, 2012

C LUSTER RESULTS ERCOT PUBLICFEBRUARY 21, 2012

11 PAIRS FOR REAL TIME MONITORING WITH UPDATED CLUSTERS ERCOT PUBLICFEBRUARY 21, 2012

12 R EPORT FINDINGS Angles and angle spreads from State Estimator data track well with those obtained with phasor data except for Gonzales and Beeville. Phasor data for these two substations is incomplete or unreliable. Voltage angle fluctuations have been reduced and now they vary over a smaller range. There are only five substations with Max-Min angle spread of more than 60 degrees. The largest angle variations occurred among the substations in the southern part of the state: Railroad with 85.5 degrees (-40.3 to 45.2 degrees), Gulf Wind with 76.8 degrees ( to 47.7 degrees), Penascal with 76.6 degrees (-29.1 to 47.5 degrees) and Airline with 71.2 degrees (-29.9 to 41.2 degrees). Only two substations had a Max-Min angle spread of less than 20 degrees: Jewett (18.5 degrees) and Kendall (19.3 degrees). All other substations have Max-Min spreads in the 21 to 61 degrees range. With the addition of the CREZ lines the voltage angles in the Central and Western part of the state (Odessa, Morgan Creek, Tonkawa, Permian Switch, Rio Pecos, Longshore, Central Bluff, Dermott and Sweetwater East) varied within a range significantly smaller than in The four largest normal condition angles in degrees observed were at Gulf Wind (47.73), Penascal (47.74), Railroad (45.16) and Airline (41.21). The smallest normal condition angles in degrees occurred at Railroad (-40.30) and Laredo (-33.46). ERCOT PUBLICFEBRUARY 21, 2012

13 H OW DID THE SYSTEM CHANGE ERCOT PUBLICFEBRUARY 21, 2012 Table 5 - BASELINING ANALYSIS UPDATE #3 - VOLTAGE ANGLE COMPARISON (February to July months) , 2013 and 2014 # Angle Pair 2012 Median2013 Median2014 Median Difference 1Matador-Killeen Switch Riley-Killeen Switch Edith Clark-Killeen SwN/A 3.51N/A 4Cottonwood-Killeen SwN/A Dermott-Killeen Switch Sweetwater East-Killeen Sw Odessa-Killeen Switch Odessa-Kendall Morgan Creek-Killeen Sw Greenville Ave-Killeen Sw Jewett-Killeen Switch Airline-Killeen Switch Railroad-Marion Hamilton Road-Marion Rio Pecos-Marion Marion-Killeen Sw

14 V OLTAGE C ONTROL C HALLENGES IN CREZ Maintain voltages within operational limits –Weak grid in the panhandle with no large synchronous generators to provide stability –Long, highly compensated 345KV transmission lines to load centers in the north –Extreme variability of wind power outputs and transfers –Coordination between different Transmission Service Providers and the ERCOT Control room –Minimize continuous variation and switching of control equipment

15 VOLTAGE SUPPORT SERVICES (VSS) VSS is a tool built into the Alstom EMS Application VSS application is designed to resolve voltage violations by solving an optimization problem Uses following controls –Shunt Capacitors/reactors –Generators –Transformers Solves for both base case and post-contingency conditions. Runs every five minutes along with State Estimator and Contingency Analysis VSS application will be used to manage voltage violations in CREZ

16 VSS R ESULTS F OR TSP S VSS results will be made available to all the TSPs using the SOTE application TSPs will see the same displays available to ERCOT operators in the control room thus helping in communications between ERCOT and TSPs Dashboard and Overview displays provided to improve CREZ TSPs’ situational awareness and system overview Tabular displays to provide detailed information about the neighboring TSPs’ reactive device statuses and outputs, voltages and suggested control actions

17 A CCESS S YSTEM O PERATIONS T EST E NVIRONMENT (SOTE) AND VSS A PPLICATIONS Login to System Operations Test Environment (SOTE) –Login into ERCOT Citrix using –Click on the SOTEEMS icon to open the SOTE system Once the SOTE application is open, click on the “VSS” icon in the toolbar on top of the window.

18 CREZ D ASHBOARD D ISPLAY

19 CREZ D ASHBOARD D ISPLAY (C ONTINUED ) Graph – Shows the PU voltages for all buses in the CREZ stations –Hover mouse on the dots to display the Station name and Bus PU voltage Tabular display – Shows Owner, Station, Voltage PU, Voltage KV etc.. –Highlights voltages above and below the limits

20 A PPLICATION RUNTIMES ERCOT PUBLICFEBRUARY 21, 2012 SE, CA and VSS timestamps show the last successful runtime for these applications Helps in identifying upstream application issues during failures

21 A CTIVATE VIOLATIONS TO VSS - B ASECASE ERCOT PUBLICFEBRUARY 21, 2012 Click on the “Basecase Voltage Violations” button to view the violations activated to VSS for resolution ERCOT Operator has the option to activate / deactivate violations to the VSS application

22 A CTIVATE VIOLATIONS TO VSS – C ONTINGENCY A NALYSIS ERCOT PUBLICFEBRUARY 21, 2012 Click on the “Contingency Voltage Violations” button to view the Contingency violations activated to VSS for resolution ERCOT Operator has the option to activate / deactivate violations to the VSS application

23 CREZ O VERVIEW D ISPLAYS Click “CREZ Region” button –Shows 5 regions that the CREZ stations have been divided into

24 CREZ O VERVIEW D ISPLAYS (C ONTINUED ) Click on any of the regions – Example “WEST” –Shows the stations in the zone and the connectivity between the stations

25 CREZ O VERVIEW D ISPLAYS (C ONTINUED ) Click on any of the stations – Example “BITTER” –Shows the station online for the selected station –Same displays used by the ERCOT control room

26 CREZ C APACITOR / R EACTOR STATUS – E XAMPLE C APACITORS Click on “Capacitors in service” button –Shows the CREZ region Capacitors that are switched in Click on “Capacitors Available” button –Shows the CREZ region Capacitors that are switched off but available to turn on

27 VSS R ESULTS Click on “VSS Results” button –Shows the violations activated to VSS by the ERCOT Operator –Shows the Control Actions suggested by VSS

28 VSS C ONTROLS Click on “VSS Controls” button –Shows all reactive devices that can provide voltage control in the CREZ region

29 I NITIAL L IST OF S TATIONS I DENTIFIED A S CREZ R ELATED

30 T EST QUESTIONS 1.What is the purpose of VSS? a) VSS application is designed to resolve voltage violations by solving an optimization problem b) Reactive testing c) Day Ahead Market ERCOT PUBLICFEBRUARY 21, 2012

31 T EST QUESTIONS 2. What ERCOT system is VSS provided from? a)VSS is a tool built into the Alstom EMS Application. b)ABB Market system c)Siemens Network Model d)Outage scheduler ERCOT PUBLICFEBRUARY 21, 2012

32 T EST QUESTIONS 3. What control/equipment that is used to manage voltage within VSS. a)Shunt Capacitors/reactors, Generators, Transformers b)Generators c)Transformers d)Line switching e)Distribution ERCOT PUBLICFEBRUARY 21, 2012

33 T EST QUESTIONS 4. What locations VSS is used for? a)CREZ b)Coastal c)Local TO area ERCOT PUBLICFEBRUARY 21, 2012

34 T EST QUESTIONS 5. What voltage limits that VSS will correct? a)Solves for both base case and post-contingency conditions. b)RAPs c)Mitigation Plans ERCOT PUBLICFEBRUARY 21, 2012

35 T EST QUESTIONS 6. Where VSS is available for TOs? a)VSS results will be made available to all the TSPs using the SOTE application b)MIS c)ERCOT.com ERCOT PUBLICFEBRUARY 21, 2012