MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager.

Slides:



Advertisements
Similar presentations
Belarus Denmark Estonia Finland Germany Latvia Lithuania Norway Poland Russia Sweden First level controls - Certification of Expenditure INTERREG IIIC.
Advertisements

This Power Point Presentation is Designed to: Learn/Review To learn how to create/complete and submit an eGrants VISTA Grants Application based on the.
SiteManager Materials Materials Certification. SiteManager Support System SSS Data Base Two Ways To Access Now Useful Information.
SiteManager Materials Division Auditor Meeting January 26, 2007.
SiteManager Materials Materials Certification Process Overview Presented at the Division Auditors Meeting Oklahoma D.O.T. Training Center April 12, 2007.
Welcome to the Online Employment Applicant Tutorial Click here for next screen.
Using State of Utah Purchasing Contracts A Purchasing Tool to Help You Save Time and Money A Dixie State University Training Presentation Revised April,
A Producer’s Guide to Chubb’s SMART Application Platform
It the responsibility of the executive head of your state agency to maintain the property records of those assets under the control of the agency. This.
1 State Records Center Searching and Requesting Inventory  Versatile web address:  Look for any new ‘Special.
Purpose To give guiding instruction and preparation required for the administrative, teacher, and student experience utilizing the Performance Matters.
OneOffice is the basis of recording and documenting all pay quantities. Pay quantities may be entered directly into OneOffice or transferred from other.
Quality Management within the Clinical Research Process
Final/Shipout Inspection Approved for Public Release.
More CMM Part Two : Details.
Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL W912DY-08-D-0020 TO 0012 Pre Construction Meeting Pre Construction Meeting.
Things To Remember About Completing I-9 Forms
ETravel Authorization / Reimbursement Overview SOLAR Financials x 6685 July 8, 2014.
Quality Management System
1. Definition of a Reconciliation 2. Importance of a Reconciliation 3. When to Prepare a Reconciliation 4. Items Needed to Prepare a Reconciliation 5.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
Conducting the IT Audit
ACRIN 6698 Diffusion-weighted MRI Biomarkers for Assessment of Breast Cancer Response to Neoadjuvant Treatment: An I-SPY 2 Trial Substudy Presented by:
Microsoft Office 2007 Access 2007 Chapter 9 Administering a Database System.
1 European Conference on Training Strategies Kieran Cox -NSAI Education & Promotion-
ETID Electronic Turn-in Document
© 2012 IBM Corporation Rational Insight | Back to Basis Series Documents and Record Control Liu Xue Ning.
Komen Grants eManagement System GeMS. Why Online Grants  Reduce the amount of administrative paperwork being completed by applicants and grantees. 
Universal Service Administrative Company Schools and Library Division Web Site Tour and Data Retrieval November 4,
CCG Ordering Information 2014 For Questions, contact the Communications Analyst Alexandra Lazar
CAPPS II: A Case Study of Homeland Security Computer Applications Marcia Hofmann Staff Counsel Electronic Privacy Information Center Computer Freedom &
S oftware Q uality A ssurance Part One Reviews and Inspections.
Oregon Feature Code. Oregon File Member Setup Done at the district level Runs the physical file information for the district Shouldn’t be too concerned.
Eligibility Traditional and Mixed Districts- Stay in Training Room with Katie Full CEP- Conference Room with Cindy McIntosh RCCI’s- Valerie’s Office with.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU. Quality Assurance José Viegas Ribeiro IGF, Portugal SIGMA.
1 School Based Services Medicaid Provider Liaison Meeting Michigan Department of Community Health February 25, 2010.
Job Order Contracting Process Bob Bourg, Claims & Disputes Manager Marlene Anglemyer, Cost Engineer.
2014 © 2014, Battelle for Kids. All Rights Reserved. ROSTER VERIFICATION Teacher Guide.
Access Online Cardholder Transaction Approval Training 1 Client Logo.
October SYS 1 Quality Audit and ISO9000 Quality Standard Kinnison, Chapter 17.
TimeTrex Electronic Signature Process. Welcome to the new totally electronic TimeTrex System The purpose of this presentation is to explain how the electronic.
Warehouse Report. Log into EDS using your Address/User Id and Password. If you have forgotten your password, click on the Forgot Password? link.
Siebel 8.0 Module 5: EIM Processing Integrating Siebel Applications.
State of Kansas Travel Authorizations Statewide Management, Accounting and Reporting Tool Entering a Travel Authorization Navigation: Employee Self Service.
Microsoft Access 2010 Chapter 10 Administering a Database System.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
USAC/Schools and Library Web Site Tour. Web Site Tour – Morning Edition… Navigation on the site – Instructions – Forms – Reference Area – Tools Later.
1 CHAPTER 3 “Status/Repository”. 2 1.Quotes – Policies Look-up – From the “Community Home Page”, click on this option to view an existing quote or a specific.
IRB  Keep IRB information for each protocol in a separate folder or separate by dividers  All IRB approvals for treatment and stand alone companions.
Researcher training for ACAP © Created by Isaac P. E. Mailleue Research Integrity Coordinator University of North Carolina at Greensboro September 2013.
Using Document Collaboration, Integration, and Charting Tools
UNCLASSIFIED – For Official Use Only 1 Contract Load Notification “Fly-in” Action ( Continue to Page Down/Click on each page…) Electronic Document Access.
CIAF Summary Report 2012/13 TPM Software within Good Spirit School Division.
Stability Through Engagement Program STEP. STEP is a Housing First Program It is offered without preconditions, such as employment, income, mainstream.
All Outreach Training Cards Requests will be submitted via the NEW ONLINE OUTREACH TRAINER PORTAL
DLA AVIATION REVERSE AUCTION PROGRAM
Time & effort reporting
Project Applicant Profile
Integrator – Vericred Interface NMMU Perspective Session 30
Utilizing PeopleSoft Tools to Streamline Graduation Processes
Acceptance Process for Manufactured Products by Certification:
Outreach Trainer Portal
To the ETS – Encumbrance Online Training Course
to Receiving Board Training
To the ETS – Encumbrance Online Training Course
THE NATIONAL TREASURY FEEDBACK WORKSHOP ON THE ANNUAL FINANCIAL STATEMENTS FOR FINANCIAL YEAR 2017/2018.
Radiopharmaceutical Production
Katherine Hawthorne, BS, rn, CCRP Program Manager
Planning Services Meeting Client Communications
Presentation transcript:

MATERIALS CERTIFICATION PROCESS Step by Step

Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager Start off in SiteManager Material Certification Process Utility Index Material Certification Process Utility Index Run Reports for a contract Run Reports for a contract Material Certification Letter Material Certification Letter

Before we begin….. Material Certification Process?? Material Certification Process?? Collection of reportsCollection of reports Microsoft Access QueriesMicrosoft Access Queries Summaries of issues related to material sampling and testing activities on a contract.

What Reports are available? Material Certification Letter Material Certification Letter Summary of Failing Samples Summary of Failing Samples Summary of materials on items accepted by Small Quantity Summary of materials on items accepted by Small Quantity Summary of Independent Assurance Summary of Independent Assurance Other Summaries – Looks for errors or documentation problems concerning SiteManager Materials. Other Summaries – Looks for errors or documentation problems concerning SiteManager Materials.

Lets Get Started….. 1.

In SiteManager….

Materials Certification Process Utility Index

Link to the Policies and Procedures Link to the Policies and Procedures The Material Certification Letter The Material Certification Letter Correction Reports Correction Reports Attachments to the Matl Cert. Letter Attachments to the Matl Cert. Letter Additional Tools Additional Tools

Start with……

Contract Specific: Audit Concern Indicator Report Print this

First Indicator to Look at: Pending Change Orders? Approval of a change order can affect Material Sampling & Testing Requirements:

Correction Reports (9) Un-authorized Samples (9) Un-authorized Samples (8) Incomplete templates – (8) Incomplete templates – (No Data Templates indicator.) (No Data Templates indicator.) Identify and correct any missing documentation in sample records.

Unauthorized Samples?

Un-authorized Samples Report

Select Contract….

Review Report……

Fix Un-authorized samples Complete any Residency samples (or void them out if not needed) Complete any Residency samples (or void them out if not needed) Contact Materials Division, if they still have any unreported samples. Contact Materials Division, if they still have any unreported samples. Re-run the Audit indicator report and verify column 9 is now un-checked. Re-run the Audit indicator report and verify column 9 is now un-checked.

No Data in Templates?

No Data in Templates Report…

Additional Info…. Policy & Procedure G Policy & Procedure G No Data in Key Contract Test Templates Report No Data in Key Contract Test Templates Report A review of this report prior to issuance of the Material Certification Letter should focus on the following issues: The indicator may not remain on the final Materials Certification Letter Sample records are to be revised and appropriate test results added to remove this indicator from the Materials Certification Letter

Review so far…. No pending change orders. No pending change orders. All correction reports are fixed: All correction reports are fixed: No unauthorized samplesNo unauthorized samples No empty templatesNo empty templates

Next: What Reports do we need to Attach to Material Certification Letter ? Material Audit concern indicator report Material Audit concern indicator report - OR - Material Certification Letter Material Certification Letter Look at the………

Screen shot: a portion of the material cert letter. - OR -

Small Quantities Report Screen shot: a portion of the material cert letter. Screen shot: from Material audit concern indicator report - OR -

Select the Small Quantities Report

Example: Small Quantity Report

Small Quantity Acceptance: Policy and Procedure A Policy and Procedure A Small Quantities Acceptance Report Small Quantities Acceptance Report Anyone responsible for printing or viewing this report, and/or anyone responsible for issuing a Material Certification Letter or auditing a contract shall be familiar with the information in the quick reference guide (QRG); LINK

Small Quantity QRG Do not use this method when you are actually conducting Sampling and Testing on a material. For Example: 1. to avoid the last sample 2. multiple tests on a material 3. Failing materials

Small Quantity QRG Step by step instructions Step by step instructions Screen shots of key points Screen shots of key points

Fail and Accepted Items

Select: Failed and Accepted Report

Example: Failed & Accepted Report

Failed & Accepted Report Review Policy B Review Policy B Failed and Accepted Materials Report Failed and Accepted Materials Report A review of this report prior to issuance of the Material Certification Letter should focus on the following issues: The indicator may remain on the final Materials Certification Letter with this report attached as the required documentation, however: Remarks should be included indicating what failed, and the basis for acceptance. The correct material quantity should be indicated Proper authorization should be indicated. (see additional discussion) Use of material listed as Failed & Accepted should be within the guidelines and policies established in the Residency and Division.

IAS Does Not Compare No report needed for this indicator.

IAS Does Not Compare Example:

IAS Does Not Compare Review: Policy E Policy E IAS Does Not compare fav. Report IAS Does Not compare fav. Report A review of this report prior to issuance of the Material Certification Letter should focus on the following issues: The indicator may remain on the final Materials Certification Letter with this report attached as the required documentation, however: Remarks (General by IAS) should indicate what did not compare Remarks (Disposition by Residency) should indicate how the non-comparison was addressed

Select: Final Outstanding Items

Example: Final Outstanding Items

Select: Final Sampling Checklist

Final Sampling Checklist

Sample/Test Modifications Indicator

Additional Tools Contract Sample summary report: Contract Sample summary report: Can be ran anytime.Can be ran anytime. No filters – shows all project samples.No filters – shows all project samples. Failed Materials Report: Failed Materials Report: Sample status = Fails Sample status = Fails

Material Certification Letter Material Cert Process Utility Index Material Cert Process Utility Index Select Contract and Print Select Contract and Print Review the indicators Review the indicators Verify (look at the indicators): Verify (look at the indicators): No unauthorized samples existNo unauthorized samples exist No material test templates are blankNo material test templates are blank Attach necessary Reports Attach necessary Reports Signed & Sealed by Resident Engr. Signed & Sealed by Resident Engr.

Questions ???