NOvA APD Cooling Water Update William Gilbert University of Minnesota.

Slides:



Advertisements
Similar presentations
Air and Water Chiller Basic Class
Advertisements

inFire HTC speed Furnace Webinar
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Components of HVAC System
Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
3U ATCA Shelf October Proprietary and Confidential-
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets ATCA Systems Technology Meeting CERN Genève.
The 30M2 Continuous Miner. Customer Name 30M2 Overview %Heavy duty high power miner for mid-height seams %High productivity from efficient cutting and.
RBX Cooling Dan Karmgard for the HCAL RBX Group. 1 Mar 01 2RBX Production Readiness Review - D. Karmgard, University of Notre Dame Outline Introduction.
QUINCY ROTARY SCREW AIR COMPRESSOR QGL 15-37kW
Installation. Indoor Unit Installation Typical Installation.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
Piping Systems.
2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois1 DHE – Detector Head Electronics Monsoon 80mm Crate Heat Load.
Cooling Update (May 2011) Tim. Overview From last time – Estimate Power Loads Active components Extraneous heat sources – Develop methodology for exploring.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
FIGURE 10-1 A heater and A/C system includes an evaporator, a heater core, a blower motor, and a series of doors to control air flow. (Courtesy of Chrysler.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
HVAC523 Circulator Pumps.
FEASIBILITY OF COMPONENTS CLARA ECHAVARRIA & JONATHON LOCKE.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Cooling: CEDAR PMT & Electronics Tim Jones Liverpool Group.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
2010.
Verigy V93000 Service Training
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Page 1 Updated by: Yap Boon Thiam Technical Engineer Date: 20/6/2012.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 8/7/2015 Simone Coelli For the Milano UT group INFN milano 1 Istituto.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Zoning Hydronic Systems. Zone Control Divides the Space to be Heated 1.Each with its own heating needs and control systems 2.There are several reasons.
INTO A LEarNeR© 7 KIT TO BE USED FOR THE PURPOSE OF LEARNING LENR AND RESULTING IN A USEFUL WATER HEATER POWERED BY A BATTERY 5/7/2012Copyright by Dale.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Esbe Rotary Motorized valves The ESBE Rotary Motorized valves (mixing valves and actuators) are used to control heating and cooling in buildings. We offer.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Uponor for Radiant Cooling Systems 102. Outline Fundamentals review FEA Analysis Case Studies Piping CCN Controls Web Link to Uponor DC Specifications.
6/9/2016 Quick Reference Parts Guide Introduction This Quick Reference Parts Guide is an easy way to locate part numbers to common replacement parts. It.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
FLATPACK Rev.5 September 2002 Updated versions may be available.
REDA Production Systems
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
WBS Readout Infrastructure Craig Dukes University of Virginia Bill Gilbert University of Minnesota CD2/3a DOE Review of NO  A October 23-25, 2007.
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Fan Coil Controller FC/S 1.1
Desert Cooler.
Feedback on transfer line sizing and flow calculations for UT
Update of MVD services and requests
SBN Far Detector integration model overview
FP420 Detector Cooling Thermal Considerations
Quick Reference Parts Guide Introduction
Piping Flow Maintenance
SNS PPU Cryomodule Instrumentation
System Curve Example Design Condition 20 ft.w.c. required each way to deliver design flow to and from the headers at the loads Distribution Pump Bell.
SNS PPU Cryomodule Instrumentation
Presentation transcript:

NOvA APD Cooling Water Update William Gilbert University of Minnesota

Cooling System Zones & Dimensions 4 cooling zones along the length of the detector supplied by chilled water at 48 o F supplied by FESS. ⇒ 3 zones of 8 sections + 1 zone of 7 sections. 12 rows of detectors each face 1 cooling loop per row, per zone, (water from heat exch to APDs) 12 row x 3 face x 4 zones = 144 secondary loops

HEAT EXCH PUMP Reservoir Primary Chill Water Level Switch Flow Switch Temp Probes Auxiliary contact on pump starter relay gives pump status Pump Unit & Instrumentation Remote I/O System RS 485, E-NET Motor Starter Secondary Water to APDs 24VDC PWR 120 VAC Optional valve for control of secondary water temperature Pump Confirm Pump Control

NOVA Cooling Manifold Section 2 versions needed 32 hoses detector top 16 hoses on sides Serving 64 planes ~1” ID pipe, ~12 ft long Ball Valve Union or other flush coupling 1/4” hoses with valved disconnect

Single Loop Heat Calculations 5w per APD module x 217units = 1085w Assume (guess) heat pickup in pipes, etc = 1085w Total = 2170w Loop delta T = Q(watts) / [263 x Flow(GPM)] = 2170w / [263 x 6.87GPM] = 1.2 degC ITD = initial temp difference of fluids entering heat exchanger = (APD water + del T) - FESS chilled water = (15 degC + 1.2deg C) degC = 7.3 deg C Q / ITD for this flow & load = 2170w / 7.3 degC = 297 Compare to high limit value from Lytron chart for this flow rate, is much lower, so this is well within capacity of LL520!

Use Macroflow? Innovative Research, Inc Harbor Lane N, Suite 300 Plymouth, MN 55447, USA Tel:(763)

Macroflow example Electronic cooling system via manifold distribution 30 elements X 4 rows, reverse return

Macroflow example part 2 Looks very similar

Loop Volume Using 1” dia manifolds, pipes, and 25k ton dimensions, Single loop water volume = 2960 cu in = 12.8 gal = 107 lb Weight of water system, guess at 2x this, ~200lbs Total length of system is ~100 feet, so 2lbs/ft, 24lbs/span But, it’s just plastic, so we will need several supports along the span, probably every 3-4ft. Total water volume, 144 loops, = 1843 gal = lb

Old Loop Cost Estimate SWAG cost estimate for loops on detector top, side loops a bit lower: 1Pump 1/25hp bronze cast$ 150$ 150 1Heat Exchanger (~LytronLL520)$ 200$ Top manifold assembly$ 830$ Fluid Reservoir$ 50$ 50 1Fluid level switch(float, capacitive, other)$ 80$ 80 2Temp probes, RTD in welded SS fitting$ 50$ 100 1Flow switch (~Omega FST-211-SPST )$ 160$ 160 1enclosure $ 200$ 200 6Remote I/O channels(2 temp, 1flow, 1 level, 1 pump status, 1 pump control)$ 200$ 1200 xMisc pipe, wire, cable$ 100$ man-hours assembly: mount 8 manifold sections make 512 quick connects mount & connect pump & other components install wire duct, field wiring, fill, test etc.$ 50$ 1200 Total$ 16720

New Loop Cost Estimate SWAG cost estimate for loops on detector top, side loops a bit lower: 1Pump 1/6 hp bronze cast$ 300$ 300 1Heat Exchanger (~LytronLL520)$ 200$ Top manifold assembly$ 780$ Fluid Reservoir$ 50$ 50 1Fluid level switch(float, capacitive, other)$ 80$ 80 2Temp probes, RTD in welded SS fitting$ 50$ 100 1Flow switch (~Omega FST-211-SPST )$ 160$ 160 1enclosure $ 200$ 200 6Remote I/O channels(2 temp, 1flow, 1 level, 1 pump status, 1 pump control)$ 200$ 1200 xMisc pipe, wire, cable$ 100$ man-hours assembly: mount 8 manifold sections make 512 quick connects mount & connect pump & other components install wire duct, field wiring, fill, test etc.$ 50$ 1200 Total$ 14510

Utilities Version A

Caution – High Voltage Completed Distribution Box Card Cage not shown Power Dist Boxes $362k Distribution Box

Power Backplane Backplane with Cu bus bars

Top Power/Data High Voltage Low Voltage Local redistribution (1.7m avg. cable length) Each Power Distribution Box powers 64 boxes DAQ services along same route from neighbor box ~2”x6” Cable Tray along Detector 2 Blocks — 62 Planes — 409cm 12 modules – 1570cm Power Distribution Box APD readout box

Side Power/Data High Voltage Low Voltage Local redistribution (2.3m avg. cable length) Each Power Distribution Box powers 60 boxes DAQ services along same route Power Distribution Box APD readout box 2 Blocks — 62 Planes — 409cm 12 modules high – 1570cm

IPND Top Power Distribution to 202 modules 202/64=4? Can we drop 10 planes? Better Distribution with 50/50/50/52 –Special channel map for DAQ 2 modules – 260cm 64 Planes — 409cm 10 Planes — 66cm

IPND Side Power Distribution to 303 modules 303/64=5? 60/60/60/63 3 modules – 390cm 40 Planes — 264cm 41 Planes — 271?cm

Cable loading weights Largest weight of cables –DAQ 0.8lb/ft –Power 1.5lb/ft –TOTAL 2.3lbs/ft Cable tray weight –1.4lb/ft (for 2x12 wire mesh) –Tray capacity 8.3lbs/ft Hang H20 from cable trays?

Comments/Questions Nothing here about readout box mounting –Will be working with Tom Chase to define mounts, box and mounting procedures –PLAN for box to fit within the plane of the module, avoiding interference issues How much space between detector and steel How much space around IPND/ND in ALL dimensions, top, side, front, back