Readout electronics for the MUV detectors R. Fantechi 28/3/2012.

Slides:



Advertisements
Similar presentations
LAV trigger primitives Francesco Gonnella Photon-Veto Working Group CERN – 09/12/2014.
Advertisements

Status of the LAV electronics G. Corradi, C. Paglia, D. Tagnani F. Gonnella, M. Raggi INFN LNF F. Gonnella, M. Raggi INFN LNF Photon Veto WG CERN 13/12/2011.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
LKr readout: present and future R. Fantechi 30/8/2012.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Cabling and connectors for future LAV stations Mauro Raggi LAV working group CERN 26/10/2009.
Inter TEL62 communication M. Raggi, M. Piccini, F. Gonnella 16 th October 2013 TDAQ Working Group Meeting.
Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.
AnDY Hardware. Run 12 Layout Detector set: – ZDCs, BBC-Y, BBC-B, PreShower phase 1, Ecal phase-1, Hcal phase-2.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
“Status of TDAQ for the 2012 runs” Gianluca Lamanna (CERN)
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
“TDAQ for 2012 runs” Gianluca Lamanna (CERN) Annual review meeting
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Hi-pT Board Hi-pT ASIC Board Type Endcap-wire Endcap-Strip Forward Chikara Fukunaga (TMU)
Peter-Bernd Otte - 8 th March 2010 CB collaboration meeting, Mainz.
TALK, LKr readout and the rest… R. Fantechi, G. Lamanna 15/12/2010.
Status of NA62 straw electronics Webs Covers Services Readout.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
Overview, remarks, lamentations, hope and despair M. Sozzi TDAQ WG meeting CERN - 4 June 2013 Introduction, news and appetizer.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Possible solutions for the future CHOD Mauro Raggi LNF MUV and CHOD CERN 13/07/
The Patti Board Gianluca Lamanna (INFNPisa) TEL62 workshop – Pisa –
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
“Planning for Dry Run: material for discussion” Gianluca Lamanna (CERN) TDAQ meeting
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Straw electronics status  Signal generation and formation in straw  Webs + Cover  Backend  TTC  Services + DCS  New engineer on VIA program Georgios.
Talk board status R. Fantechi, D. Gigi, G.Lamanna TDAQ meeting, Mainz
Status of the NA62 network R. Fantechi 23/5/2012.
NewCHOD Firmware Chris Parkinson, University of Birmingham 16 th December
TDAQ news and miscellaneous reports M. Sozzi NA62 TDAQ WG meeting CERN – 13/7/2011.
PROPOSAL FOR A MUON VETO SYSTEM BEHIND THE HADRONIC CALORIMETER (MUV-3) Problems and requirements:  Expected total rate for 9.25 < R < 120 cm: 12.1 MHz:
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
L0 trigger update Bruno Angelucci INFN & University of Pisa.
Many LAV stations in digital trigger Francesco Gonnella Photon-Veto Working Group CERN – 03/02/2015.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
“CHEF board” Gianluca Lamanna & Riccardo Fantechi (CERN) TDAQ meeting
High Multiplicity FVTX Trigger Toru Nagashima, Yomei Fukushima (Rikkyo University) Shoichi Hasegwa (J-Parc) Itaru Nakagawa RIKEN and FVTX Group 1.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
Gianluca Lamanna TDAQ WG meeting. CHOD crossing point two slabs The CHOD offline time resolution can be obtained online exploiting hit position.
LKr status R. Fantechi.
LAV front-end and readout status
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
G.Lamanna (CERN) NA62 Collaboration Meeting TDAQ-WG
PMT cabling Gian Luca Raselli INFN Pavia
TDCB status Jacopo Pinzino, Stefano Venditti
Electronics for RPC Upscope
Pierluigi Paolucci - I.N.F.N. Naples
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

Readout electronics for the MUV detectors R. Fantechi 28/3/2012

MUV1&2 electronics – Not the real expert, however… Use LAV electronics + TDCB Cables coming in the back of EB24 Patch panels taken/refurbished from NA48 LAV type of cables TEL62 crate common with MUV3 Standard readout firmware

MUV3 electronics Cables – HV Reuse AKL cables: enough and of right lengths, 16 cables/bunch with SHV connectors Need some work: cut in half, free the conductors, put together the internal connectors of two cables into one Radiall 32 pin connector for the CAEN boards Estimated length: between 8 and 12 m, depending on which sector HV power supplies rack on the floor of ECN3 – Signal Going to the EB (see later) Estimated max length 20 m, effective length to be determined 296 RG58 cables. BNC at both ends, to be prepared AKL patch panel available Constant fraction discriminators – Reuse of the old AKL CFD 288 channels available Few more boards should be produced, however not urgently – The existing boards have been checked to have all the channels ok with a basic go-nogo test Indeed using two counter and their coincidence and moving one of the two cables from one channel to another Outputs are ECL

MUV3 Electronics Level adapters – Needed to convert from ECL, flat cable connector to LVDS, TDCB connector Relatively simple boards, only take care of line impedance and to have all the channels with connections of the same length To be built in Mainz, elaborating a first design by Gianluca and myself Implementation in VME 6U, needs one 6U crate, which will be useful also for choke/error OR board

ECL/LVDS translator “TRAM” (TRAnslator for Muon veto) Implement controlled Z lines and all tracks of the same length

MUV3 Electronics TDCB and TEL62 – 1 TEL62 and 3 TDCB needed – Firmware to be developed Readout of hit times is available Work needed for trigger primitive generation – Pieces under development possibly available from CHOD and LAV

Electronics layout EB24EB23 EB23 doesn’t have heat exchanger: good to pass 300 cables from the back CFD crate Cable patch panel Level adapter crate TEL 62 crate MUV1 and 2 patch panels to be installed in the back of EB24