25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, 2012 25: SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.

Slides:



Advertisements
Similar presentations
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
Advertisements

1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) GSE Timothy Quinn.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
1 PFP MSR, 8/21/2012 Particles and Fields Package Monthly Status Review (MSR) August 21, 2012 Dave Curtis, PFP PM.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
Server Virtualization: Navy Network Operations Centers
1 PFP MSR, 11/15/2011 Particles and Fields Package Monthly Status Review (MSR) November 15, 2011 Dave Curtis, PFP PM.
From Research Prototype to Production
18-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Package Dave Curtis, PFP Package Manager Mars.
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
1 PFP QSR, 10/18/2011 Particles and Fields Package Quarterly Status Review (QSR) October 18, 2011 Dave Curtis, PFP PM.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
1 PFP QSR, 10/9/2012 Particles and Fields Package Quarterly Status Review (QSR) October 9, 2012 Dave Curtis, PFP PM.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Monthly Status Review Wednesday, January 18, 2012 LPW/EUV Jim Westfall PM & Will Thompson SE Laboratory for Atmospheric and Space Physics University of.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
10-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : EMC Dave Curtis Mars Atmosphere and Volatile EvolutioN.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
1 PFP MSR, 9/18/2012 Particles and Fields Package Monthly Status Review (MSR) September 18, 2012 Dave Curtis, PFP PM.
March 28, 2011 MAVEN SWEA instrument Pre-CDR Peer IRAP March 28-29, IRAP Management MAVEN SWEA Instrument Pre-CDR Peer Review IRAP, March.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
SWEA Product Assurance SWEA Peer Review March 28-29, 2011 IRAP, Toulouse.
FIELDS Mission Assurance Manager University of California, Berkeley
Accelerator Readiness Review October 31, 2006
EFW DFB Systems Assurance
EFW DFB Systems Assurance
Solar Probe Plus FIELDS MEP i-PER Safety and Mission Assurance
FIELDS Mission Assurance Manager University of California, Berkeley
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
THEMIS Mission Assurance
THEMIS INSTRUMENT SUITE
ISUAL Product Assurance
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
FIELDS Mission Assurance Manager University of California, Berkeley
FIELDS Mission Assurance Manager University of California, Berkeley
Particles and Fields Package Quarterly Status Review (QSR)
0.0 Instrument Suite Name Presenter’s name
Integration and Test Organization Chart
Presentation transcript:

25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission

25-2 MAVEN IPSR October 30,31, 2012 PSR SMA - Summary EIDP (including GSFC, IRAP, LASP) flight travel books have been reviewed, all open items are identified by SSL and GSFC and are tracked – cont. Hardware and Software are in good shape Configuration Control is in place and working No parts or materials issues No major issues during built-up – Exception: SWEA No major non-compliance exists – Exception: SWEA PFR’s: Jorg Fischer Testing and Verification: David Curtis Software code Status & GSE: Peter Harvey SSL Safety: Jorg Fischer, Safety: LM

25-3 MAVEN IPSR October 30,31, 2012 SMA SUMMARY Workmanship -SMA supported PMB, PWA fabrication, assembly modifications, tuning efforts, repair/rework, box integration, and training (training at JPL, RMV, and informal in-house) Configuration Management -FHW – Checked FLT Binder documentation and PFR status to confirm readiness, before start of testing -FSW – ongoing support of informal and formal reviews, walk-throughs, and monthly reports -Documentation Control – Performed FLT document reviews, and updates Work Order Management -Travelers – Reviews performed by SSL QA and GSFC QA -Procedures – Performed procedure reviews -Inspections – Ongoing - Performed by SSL QA and GSFC QA.

25-4 MAVEN IPSR October 30,31, 2012 SMA SUMMARY Metrology & Calibration -Performed the monthly checks (Tools and Certifications) – no issues. Scanned 100% of all certifications for EIDP delivery. Training -Performed certifications review – no issues -Cleanroom, PP, ESD, and Documentation training – no issues -Held SSL Safety Training Meetings -LM Training for SSL team members to meet LM in-house requirements might be necessary. Contact with C. Love - in progress. -LL: Suspect counterfeit awareness training is planned for SMA and purchasing personnel - NA-HQ PFR-NCR SPR-SCR System -PFR-NCR database revised and updated, documentation - in progress -SPR-SCR list revised and updated, documentation - in progress

5 SMA SUMMARY Quality -Inspections of all FLT unit assemblies, PWA, boxes, and harnesses – ongoing. All issues are documented in PFR System. -Testing - Provided support for offsite testing, such as, EMC, Vibration testing setup and testing. Supported In-house testing, such as, TVAC set-up and testing of the instruments -Supported of LASP EUV efforts at SSL -Continuous inspections of Flight assembly, cleanroom, and test areas by SSL and GSFC QA -Supported PW board modifications/tuning and rework/repair -Supported integration and de-integration activities of the Instrument Stacks (PFDPU, SWEA, SWIA, SEP, LPW, STATIC)

6 SMA SUMMARY ESD Control -Implementation, equipment, maintenance, measurement, and training are addressed in the SSL ESD Control Plan (Rev. B) -Supported the annual independent ESD Control verification and performed the monthly survey – no issues -SSL MAVEN team ESD training was performed, as required Material Processes and Parts Control -Updated EEE parts, Flight fastener, and Materials databases -As-built BOM documentation. ABPL for all instruments are complete -Alert response reports (GIDEP) – Provided disposition and updated the alert response database – no issues (ref. GIDEP slide) -Polymerics – Updated mix record database. Performed polymeric witness sample testing, filing, inspections, and documentation.

7 SMA SUMMARY Facilities / Equipment -Continuous inspections of Flight assembly, vendor and in-house test areas by SSL and GSFC QA -Provided cleanroom support - cleaning of parts, continuous supplies, and maintenance, for all MAVEN cleanrooms -Industrial Safety: Provided support of chemical, hazardous waste inventory and UCB EH&S interaction Delivery Readiness -End Item Data Acceptance Package – ongoing -Reviewed LM AIRR list – ongoing -Support of shipping effort

25-8 MAVEN IPSR October 30,31, 2012 PFR, ECN, Waiver, MUA Overview Anomalies/PFR/NCR 37 NCRs and 82 PFRs issued – STATUS next slides ECN/ECO 18 ECN/ECO issued, All closed WAIVERS, CCR 42 Waivers issued. Closure of all to be confirmed MUA 5 MUAs issued, Closure of all to be confirmed

9 SMA - MRB MRB System -PFR status report list sent to GSFC – weekly -PFR-NCR System will serve as a Lessons Learned System -Provided assistance to SSL engineers with PFR documentation and related item close-out PFR MRB Status (10/25/12): SSL Problem count 124 MRB problems: 82 NCR problems: 37 VOID : 5 Open problems in Review at SSL: 6Problems in Review at GSFC: 8 SSL Total Closed count : 110 Void: 5, Monitor: 3 GSFC Total CLOSED count: 101 Open: 7, VOID: 5, Monitor: 3 Monitor: 3 (SWEA PFR 059 and 122; PFR 115: SWIA Vibration Frequency Shift – expected to close after vibe test

25-10 MAVEN IPSR October 30,31, 2012 SMA - MRB Anomalies/PFR/NCR – STATUS of six (6) open PFRs PFR 105, EUV Temp Sensor Noise is open – LASP EUV - Waiting for thermal test PFR 108, Operational and Actuator CE03 exceedances - PFDPU - Waiting for Waiver to close PFR 109, MAG Heater CE03 exceedance - PFDPU - Waiting for test data with the filters PFR 111, MAG Sensor CS101 MAG susceptibility - PFDPU MAG Sensor FM1,2 - Waiting for test data with the filters PFR 119, STATIC TOF Field Emission Noise - SSL is working to close PFR 124, LASP LPW Cold Anomaly – LASP EUV - Ready to close - FRB

25-11 MAVEN IPSR October 30,31, 2012 PFR ECN Tracking PFRs, ECNs

25-12 MAVEN IPSR October 30,31, 2012 Configuration Control Instrument and Box Level 1.Master sheet Assembly Subsystem Components Cognizant Engineers Serial Numbers and Designators: F1, F2, Spare. Rev Level AS-BUILT Schematics, AS-BUILT BOMs, AS-BUILT Assembly Instructions 2.Master Binder for ECN, PFR, Waiver, MUA (all available electronically)

25-13 MAVEN IPSR October 30,31, 2012 SMA – SPR-SCR System

25-14 MAVEN IPSR October 30,31, 2012 Data Bases – Parts, Materials Approved no issues

25-15 MAVEN IPSR October 30,31, 2012 Data Bases – Alerts and GIDEP Approved no issues

25-16 MAVEN IPSR October 30,31, 2012 GIDEP Alerts & Problem Advisories As of 10/28/12, SSL SMA checked a quantity of 463 alerts As of 10/28/12, SSL SMA closed a quantity of 463 alerts Four (4) impact alerts were mitigated and closed 1.Alert “ from Oscar” Added a note to board drawings that “The use of brominated polyimide is unacceptable.” SMA produced PWA specification for MAVEN – SOW 2.KE1-P-11-02, SOTA, solderable thin film MIL-PRF resistors were produced with defective end terminations. A) Date Codes not used. B) Additional inspections were implemented 3.RS2-P-11-0, Microsemi, diode re-classified as ESD Class 0 – installed ESD class 0 workbench, device installed at JPL. 4.NA-HQ , Checked approx. 400 vendors, - no impact, used MFG authorized vendors only and received certs.

25-17 MAVEN IPSR October 30,31, 2012 FLT Travel Books

25-18 MAVEN IPSR October 30,31, 2012 SMA – Concerns & Observations Concerns – All concerns are well understood and are closely monitored by the SSL and GSFC QA teams. Pending – Expect two red flag PFRs (SWEA PFR 059 and PFR 122) – LM monitoring for both. Communications and working relationship of the experienced MAVEN PFP teams are excellent.