1 2012 Storm Water General Permit For Construction Activities(OKR10) Stakeholder Advisory Committee Meeting December 15, 2011 Watershed Planning and Storm.

Slides:



Advertisements
Similar presentations
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Soil Erosion.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Regulatory Overview Presented By: Wayne T. Craney, P.E.
Overview of Changes to OKR10
Stormwater Pollution Prevention Plan (SWP3) Requirements
Addition Facts
ZMQS ZMQS
Alaska Association of Harbormasters and Port Administrators Wrangell, Alaska October 26, 2010 Shane Serrano ADEC.
State Waters and Stream Buffers
ABC Technology Project
15. Oktober Oktober Oktober 2012.
Checking & Corrective Action
Buffers and Special Water Quality Protections
We are learning how to read the 24 hour clock
MCM 5 – Post-Construction Runoff Control (DRAFT) YES NO Post-construction stormwater management for that construction activity is in compliance with MCM5.
Post-construction rates and volume of stormwater runoff on-site will be equal to or less than that of pre-development rates and volume of stormwater runoff?
Presented to: Minnesota Chamber of Commerce October 1, 2012.
Watershed Staff Videoconference October 17, 2012.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
November 4,
Addition 1’s to 20.
25 seconds left…...
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Week 1.
1 Unit 1 Kinematics Chapter 1 Day
Stormwater Rulemaking Briefing US Environmental Protection Agency.
Stormwater Regulations and Programs Law Permits Watershed Programs Information available at
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
WYOMING WATER & ENERGY LAW NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
1 Effluent Guidelines for Construction Greg Davis USEPA
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
Stormwater Pollution Prevention Plans
Future of the Construction and Post Construction Water Quality Program
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Env 247 Overview of Stormwater Management March 1, 2011.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Office of Sustainability Presented by Sofia Habity EROSION AND SEDIMENTATION CONTROL.
Stormwater Permitting at Airports Julianne Rantala MPCA, Industrial Division.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Employees can help reduce water pollution by preventing dirt and debris from being washed into the storm drain system during the following activities:
MS4 Permitting Process William Creal Water Bureau Permits Section Chief.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
Erosion & Sediment Control. Wind Erosion Water Erosion.
MDOT Storm Water Management Plan Module 2: Best Management Practices
MS4 Permit Updates May 9, 2014 Jay Hoskins, P.E. Metropolitan St. Louis Sewer District.
New Stormwater NPDES Construction General Permit Effective August 3, 2011 New Stormwater NPDES Construction General Permit Effective August 3, 2011 Samir.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Bureau of Watershed Management Preliminary Regulatory Proposal Chapter 102 Erosion, Sediment and Stormwater Management December 19, 2007.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Pollution Control: For Field Office Construction Sites.
Preventing Storm Water Pollution: What We Can Do Land Disturbances PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S.
Inspector Challenges.
Storm Water Pollution Prevention Plan Development
2018 Stormwater Construction General Permit (CGP) Renewal TXR150000
John Tinger U.S. EPA Region IX
Stormwater Pollution Prevention Plans
INDOT Storm Water Management
Rule 5 and 13 Conversion Impacts
TPDES Construction General Permit Compliance
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Storm Water General Permit For Construction Activities(OKR10) Stakeholder Advisory Committee Meeting December 15, 2011 Watershed Planning and Storm Water Permitting WQD/ODEQ

Storm Water General Permit For Construction Activities(OKR10) AGENDA 1.Welcome / Introduction 2.Reissue Timeline 3.DEQs Identified Issues 4.Other Potential Issues

3

Proposed Timeline for Reissuing Construction General Permit (OKR10) 4 12/15/2011 – 1 st stakeholder advisory committee meeting; 01/19/ 2012 – Preliminary review of 1 st proposed permit and 2 nd stakeholder meeting; 02/16/2012 – Review 2 nd proposed permit and conduct the final stakeholder meeting; 03/01/ Submit final draft permit to EPA; 06/15/2012 – Release final draft permit for public comment; 09/12/2012 – Issue new 2012 permit.

ODEQ Identified Issues – 1. Reorganized to be clear what requirements are non-numeric technology-based effluent limits and water quality-based effluent limits 5 EPA proposed permit: 1.Effluent Limitation Applicable to All Discharges from Construction Sites; 2.Numeric Turbidity Limit and Sampling Requirements; (no numeric limit for turbidity) 3.Water Quality-Based Effluent Limitations issued.; 4.Inspections; 5.Corrective Actions; 6.Staff Training Requirements.

ODEQ Identified Issues – 2. Including Corrective Actions 6 Corrective Actions are any actions you take to: Repair, modify, or replace any storm water control used at the site; Clean up and dispose of spills, releases, or other deposits found on the site; and Remedy a permit violation.

ODEQ Identified Issues – 3. Including numeric effluent limits for discharges from asphalt batch plants 7 1. Numeric effluent limits (MSGP Sector D) TSS: 23 mg/l, daily max., 15 mg/l, 30 day avg.; Oil & Grease: 15 mg/l daily max., 10 mg/l, 30 day avg.; pH: S.U. 2. Addendum E Monitoring and Reporting Requirements for Asphalt Batch Plants

ODEQ Identified Issues – 4. Eliminating calls to the USFWS 8 If a proposed construction or land disturbing activity is within the listed sensitive water or watershed, and cannot meet any criteria in Part E You must contact ODEQ for alternative requirements; Add Addendum F Buffer Guidance to evaluate alternatives.

ODEQ Identified Issues – 5. Adding new provision for practice of engineering 9 If any part of the SWP3 involves the practice of engineering, then those engineering practices and designs are required to be prepared by a registered professional engineer. Include Definition of practice of engineering - the Statutes and Rules of Oklahoma State Board of Licensure for Professional Engineers & Land Surveyors, Section 472.2

ODEQ Identified Issues – 6. Adding new technology-based effluent limits which are proposed by the EPA 10 Non-numeric Limitations 1.Minimize sediment discharges from the site by using perimeter control and stabilized entrance (50ft); 2.Provide and maintain natural buffers around surface waters, direct storm water to vegetated areas to increase sediment removal and maximize storm water infiltration, unless infeasible.

ODEQ Identified Issues – 7. Including a copy of the inspection form 11 Include an inspection form as one of the required elements of the SWP3

ODEQ Identified Issues – 8. Clarifying responsibilities of multiple builders and provide examples ??? 12 Examples provided by Arkansas or Texas permit Clarify responsibilities where there are multiple operators on one site. Primary Operator vs. Secondary Operator

ODEQ Identified Issues – 9. including a reference to the EPAs BMP list ODEQ Identified Issues – 9. including a reference to the EPAs BMP list 13 EPAs website

ODEQ Identified Issues – 10. Adding a new NOI item for project purpose to identify those project ODEQ does not have jurisdiction 14 What type of project will you be constructing on this site? Enter the appropriate name to indicate the type of project. For example, residential subdivision, commercial building, road and bridge, wind farm, etc

ODEQ Identified Issues – 11. Adding buffer requirements for those discharges to Outstanding Resource Waters 15 Illinois River Lee Creek/Little Lee Creek Watersheds Mountain Fork River Watershed

16

ODEQ Identified Issues – 12. Adding requirements for the application fees and permit fees for renewal 17 Application fee $100 Annual permit fee $330 Fee schedule established in OAC 252:606 Located on ODEQs website at

ODEQ Identified Issues – 13. Adding new sediment basin requirements for disturbing land of 5 acres or more within sensitive water and watershed and outstand resource water ??? Small sediment basin or any equivalent controls, such as sediment trap, vegetated buffers ; 2. Calculated volume of runoff from a 2-year, 24- hour storm or 3,600 cubic feet of storage per acre.

ODEQ Identified Issues – 14. Consider reducing 40 acre SWP3 review threshold acres ?? 20 acres??

ODEQ Identified Issues – 15. Including Alternatives for straw bales/hay bales as erosion controls 20 Some alternative practices recommended by EPA For Perimeter controls – Silt fence; For Check dams – Rock checks or fiber rolls; For Slope protection – Geotextiles or Compost blankets; For Storm drain inlet protection – Filter fabric, gravel bags, and other designs For concrete washout structures – Prefabricated concrete washout containers

ODEQ Identified Issues – 16. Adding new requirements for 303(d) sediment listings ??? 21 EPAs proposed permit: Benchmark monitoring for disturbing 10 acres or more for turbidity, nitrogen and phosphorus; Recording and reporting Corrective actions; Stabilization – 7 days Site inspection –weekly and daily visual inspection

Other Potential Issues ?

The next meeting will be January 19 th at 1:30pm, here at the DEQ office Thank You!