FEDERAL AID PLAN DEVELOPMENT

Slides:



Advertisements
Similar presentations
FAA Project - Bidding Phase FAA Recommends.. Consider how you would like to bid the project early on in the design. Due to possible budget constraints.
Advertisements

State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
Presented by Dan Erickson And Colleen VanWagner.
Metro Muncipal Agreement Program
Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Regulatory Signs.
State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Guide Signing.
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
District 4 Local Assistance
City of Eugene Certification Project Case Study. Why Did Eugene Get Certified? Can’t do fund exchange ODOT's Local Agency Program More project control.
DESCRIPTIONDESCRIPTION PROCEDURESPROCEDURES CUT- THROUGH RESTRICTION TRAFFIC- CALMING $200 FINE FOR SPEEDING SIGNS MULTI-WAY STOP (“MWS”) SIGNS THROUGH.
IOWA DOT UPDATE 2014 APWA IOWA CHAPTER FALL CONFERENCE JOHN E. DOSTART, P.E.
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
Permitting and Design Guidelines Working with Regulators Melissa Mormilo, P.E., LEED AP DOWL Engineers.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Plans, Specifications and Estimate (PS&E) Kelli Sparkman Local Agency Liaison, Region 3 January 30, 2009.
State Aid (SALT) prepares the Federal Agreements and the Amendments for  Force Account (FA)  Right of Way (ROW)  Preliminary Engineering (PE)  Construction.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Design Exceptions 101 Ed Fischer, State Traffic-Roadway Engineer Mike Morrow, FHWA Field Operations Engineer Kent R. Belleque, Senior Interchange Engineer.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
3 CDBG Disaster Recovery Program Information Workshop Monday, February 1, 2010.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Allen Hughes State Materials Office
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
Mock State Aid Project County Highway Accountant’s Conference 2015.
State Transportation Bonds. State Aid Bond Programs LBRP – Local Bridge Replacement Program ◦State Bridge Bond Funds LRIP - Local Road Improvement Program.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 13 (Some of these pictures show bicyclists not wearing.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
2012 ACEA MEETING ORANGE BEACH Brad Lindsey, P.E. Assistant State County Transportation Engineer – Pre Construction Alabama Department of Transportation.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
Request For Qualifications (RFQ) Missouri Local Programs How to Complete the RFQ & Get it Advertised.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
FHWA: Revision of Thirteen Controlling Criteria for Design; Notice for Request and Comment. Comments Due: December 7, 2015 Jeremy Fletcher, P.E., P.S.M.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
Community Crossings Matching Grant Fund Program Kathy Eaton-McKalip
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
The Alabama Transportation Rehabilitation and Improvement Program
Construction Oversight
County Highway Accountant’s Conference 2015
Traffic Control Plan Development Course
Acceptance Process for Manufactured Products by Certification:
State Aid Plan Approval Process
State Aid Construction
Completing the State Aid Payment Request
State Transportation Bond Funds
Chapter 7 Signing Plan Sets
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
Technical Committee on Geometric Design
PLAN PREPARATION BASICS GENERAL LAYOUT
State Transportation Bond Funds
PLAN PREPARATION BASICS STATEMENT OF ESTIMATED QUANTITIES (SEQ)
3R Standards Resurfacing, Restoration, & Rehabilitation Note: Need to update based on revisions to Ch 7 of HDM (freeway and non-freeway now covered in.
State Transportation Bond Funds
State Aid Construction
State Aid Project Plan Preparation
Presentation transcript:

FEDERAL AID PLAN DEVELOPMENT

Federal Aid Group

PROCESS OVERVIEW (steps to complete a Federal Aid project) State Transportation Improvement Program (STIP) Project Kick Off Meeting Project Development Report Construction Plan Review and Approval Authorization of Federal Funds Letting, Contract Award, & Approval Contract Administration

State Transportation Improvement Program (STIP) Projects are awarded federal funding Regional Solicitation, High Priority, Safe Routes to School, Non-Motorized All federal funded projects must be listed in or amended into the current approved STIP. Projects added when new STIP is created Formal STIP Amendment 2-3 month approval process

Project Kick Off Meeting Federal Aid Project Manager meets with Local Agency Items for discussion include: Project Schedule/Sunset Date Project proposed vs. project application Type of Project Development Report needed Project Issues R/W 4(f) Historic Railroad Funding; total dollars/local match Regulatory Agencies (CRU, Environmental Serv., DNR)

Project Development Report Initial Review Submit 4 signed, unbound copies to Federal Aid Project Manager Document will be reviewed and comments forwarded to SALT LPA will receive Metro and SALT comments LPA makes corrections Final Review LPA submits 5 copies signed, unbound copies to Federal Aid Project Manager Federal Aid Project Manager submits to SALT for approval.

Construction Plan Submittal Initial Review Unbound Copies of the plan (please keep the originals) 1 copy for Project Manager review 1 additional copy if Storm Sewer is proposed 1 additional copy if project includes a RR crossing 1 additional copy if bridge is proposed 15 additional copies if project contains a Trunk Highway endpoint or x-ing

Construction Plan Submittal Initial Review (continued) DCP Form 01 Plan Review Checklists (State Aid and Federal Aid) See Samples Engineers Estimate Laboratory Testing Services Form Parking Resolutions Drainage Area Maps & Computations R Value/ESAL documentation (pavement design calcs) SJRs and/or Warrant Analysis

Construction Plan Submittal Final Review and Approval (DCP 02 Form) Signed original plan and 3 copies Revised Engineer’s Estimate R/W Certificate #1 and checklist or #1A Utility Relocation Certificate Permits Special Provisions Resolution for City Approval (County projects) Required if City signature is not on plan

Plan Review and Approval Log plan into data base Route to TH functional areas if applicable Route to State Aid Hydraulics, RR or other agencies if applicable Compare plan to Project Development Report Project Termini Construction Elements/Scope Typical Section Project Cost Significant increases in cost may require a formal STIP Amendment

Plan Review and Approval Review Preliminary Plan Format and Plan Content Conformance to State Aid Rules/Standards Hierarchy: State Aid Rules, Road Design Manual, AASHTO Federal Eligibility (see handouts) Check for required Permits/Documentation Forward R/W Certificate for Review and Approval Prepare Review Letter and/or Red Line Prints and Send to Designer or Local Agency for plan revisions

Plan Review and Approval Review Final Plan Verify all Comments have been addressed Request DBE Goal Check for Required Documentation Revised Eng. Estimate, R/W Certificate, etc. Obtain State Aid Engineer Signature for Approval Request Federal Authorization

Plan Format Title Sheet (see sample) Minnesota Department of Transportation Construction Plan For Work description (pay item level of detail) Located on ___________ from _______ to _________ SP # lower right corner Minn. Proj. No. in upper right corner Length Blocks for each roadway Length must agree with stationing on index map Bar Scales Sheet numbers in lower right corner Numerical sequencing

Plan Format Title Sheet (continued) Index Map Label major roadways Begin and end SP and stationing Proposed Signals and Bridges Unless a general layout is included in the project Governing Specifications Note Utility Quality Level (see handout) Index of Sheets List A & B sheets separately Include “This plan contains XX Sheets” below index

Plan Format Title Sheet (continued) Design Designation Block (roadway) Must match Approved Proj. Development Report Present (year to be let) and 20 year projected ADT Design Speed and exceptions (must be in approved PDR) Structural Design Strength Soil Factor and HCADT or R Value and ESAL (must match supporting documentation) Number of Traffic Lanes (thru lanes only) Number of Parking lanes or shoulder width

Plan Format Title Sheet (continued) Design Designation Block (bikeway) Must match approved Proj. Development Report Design Speed Height of Eye/Height of Object Design Exceptions (must be in approved PDR) Plan Preparation Certification Required on all sheets except x-sections Required on Standard Plan sheets that have been modified

Plan Format Title Sheet (continued) Signature Block (see handout) County Signature – County Funds City Signature – City Funds Agency receiving funds if not City or County Mn/DOT Signatures if Trunk Highway Funded Signature or permit required if project impacts another agencies R/W State Aid Signatures

Plan Format Statement of Estimated Quantities TRNS*PORT list Match item numbers and units; descriptions vary Trunk Highway funded; match TRNS*PORT exactly Funding Columns All federal participating items in one column Separate column for Storm Sewer Separate column for federal non-participating (but CSAH or MSA eligible) Separate column for Local Funds (not state aid or federal aid eligible.

Plan Format Statement of Estimated Quantities Include Traffic Control Item Basis for Estimated Quantities Bituminous mix, tack coat, fertilizer, seed mix Construction Notes Define compaction, tapers through the base material, topsoil stripping and stockpiling

Plan Format Tabulations Standard Plates Consider for fence, trees, removal, storm sewer, and earthwork Quantities on charts must match the EQ Chart Standard Plates These standard plates as approved by the FHWA shall apply. Use current letter designation for each plate number Provide additional construction details for items that do not have a Mn/DOT standard plate (ie: benches, signs, etc.)

Plan Format Typical Sections Must match the proposed roadway section in the Proj. Dev. Report Individual lanes widths labeled Thru Lanes, turn lanes, shoulders, parking lanes Location of the Profile Grade labeled Pavement Cross Slope, Inslope and Backslope Ratio Specification and Depth of Roadway so GE can be verified R/W Width Recovery Area/Clear Zone Topsoil Depth and Seed and Sod Requirements

Plan Format Construction Plan and Profile Horizontal Curve Data Vertical Curve Data Construction Limits Existing and Proposed Right of Way Begin and End Station with SP Numbers Bar scales and North Arrow Superelevation (if applicable) Station Equations (if applicable) Label Removal and Construction Items

Plan Format Cross Sections Cross Sections cover the entire project limits Spacing adequate to compute earthwork quantities. Right of Way and Temporary Easement Lines required Include Centerline and Entrance Culverts Station to Station Limits in lower right corner

Ad for Bid/Letting Date Local Agency Sets Letting Date Schedules Letting Date in Consultation with State Aid State Aid provides Local Agency with required Ad Language Local agency prepares ad Local Agency Submits Ad to State Aid for Review and Approval Upon approval, Local Agency submits ad to Constr. Bulletin and local paper DO NOT PLACE AD UNTIL NOTIFIED BY STATE AID

DCP Packet/Proposal Fed. Aid Project Manager prepares DCP Packet Contains Required Federal Components Do Not add any Special Programs that Contain a Goal or Conflict with any of the Mn/DOT Language Local Agency submits Proposal for Review Federal Aid Project Manager reviews Document for Required Federal Language/Documents Final Proposal Copies Submitted to State Aid 3 Copies for our File and Distribution

Project Award Local Agency notifies State Aid of low bidder/amount Local Agency notifies low bidder to submit Request for DBE Certification to Civil Rights (DCP 03) Local Agency sends Pre-Award Information to Civil Rights (DCP 04) Civil Rights certifies DBE Participation and notifies LPA DO NOT AWARD UNTIL NOTIFIED BY CIVIL RIGHTS OFFICE.

Bikeways State Aid Rules 8’ minimum width (10’ desired) 2’ shoulder/clear zone 20 mph design speed (30 mph for >4% and 500’) 10’ vertical clearance

Bikeways Mn/DOT Bikeway Facility Design Manual Separation between path and roadway (Fig. 5-4) Typically 4’ urban; depends on roadway posted speed Separation/clear zone different material than trail or striping Safety Railing on steep slopes if separation is less than 5 ft (Figure 5-16) 3:1 or greater and drop off is 6’ or more 2:1 or greater and drop off is 4’ or more 1:1 or greater and drop off is 2’ or more

Bikeways Mn/DOT Bikeway Facility Design Manual On Road Facilities (Chapter 4) Table 4-1 and 4-2 for bikeway design ADT and motor vehicle speed determine design selection Dedicated Bicycle lanes Shoulders (at least 4’ in width) Wide Outside Lanes Shared Lanes See Chapter 4 for detailed description and guidance on the selection of on-road facilities.

Signal Justification Reports SJR is required for: New signal installation Complete reconstruction of existing signal Major geometric change at intersection SJL (justification letter) can be used for: Revision to existing signal Addition of EVP ICE (intersection control evaluation) is required if any leg is a Trunk Highway.

Signal Justification Reports SJR Contents Title/Signature Page Index Map Intersection Layout (existing and proposed) Project Description Warrant Analysis and Summary Justification Statement Appendix with counts, studies, etc. SJL Contents Letter of description and justification with signature blocks at the end Warrant Analysis

Helpful Resources State Aid Websites www.dot.state.mn.us/metro/stateaid/home.html www.dot.state.mn.us/stateaid State Aid Manual – Chapter 5.4 Plans & Proposals State Aid Rules DCP Checklist Minnesota Bikeway Guidelines