Regulatory Overview Presented By: Wayne T. Craney, P.E.

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

Jamie Petersen Administrative Assistant - Stormwater Front Desk: (402) Michael Crisco Program Specialist – Storm.
Storm Water General Permit For Construction Activities(OKR10) Stakeholder Advisory Committee Meeting December 15, 2011 Watershed Planning and Storm.
Overview of Changes to OKR10
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Alaska Association of Harbormasters and Port Administrators Wrangell, Alaska October 26, 2010 Shane Serrano ADEC.
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
The Urban Connection: NPDES and Storm Water in the State of Delaware Sandra M. Goodrow, Ph.D., C.F.M. Environmental Scientist IV Surface Water Discharge.
Phase II Municipal Separate Storm Sewer System (MS4) Permits Patricia Foran & Cindy Hooper Storm Water & Pretreatment Team.
Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Stormwater Rulemaking Briefing US Environmental Protection Agency.
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
1 Effluent Guidelines for Construction Greg Davis USEPA
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
Arkansas Storm Water Program Arkansas Update On Construction, Industrial & Small MS4.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Stormwater Regulations
MUNICIPAL STORMWATER PERMITS Water Quality Partnership May 19, 2005.
Pretreatment, Pollution Prevention and Storm Water Committee California’s Storm Water Program Bruce A. Fujimoto State Water Resources Control Board February.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Regulations that Protect Clean Water Jocelyn Mullen, P.E. PART 2 OF PRESENTATION Presented at The Water Course January 27, 2010 Mesa County Water Association.
City of Puyallup Planning Commission Presentation February 8, 2012.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
New Boise Area MS4 Permit Boise City Council Budget Workshop August 15, 2012.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
EPA’s Stormwater Rulemaking: How Potential Changes in the NPDES Stormwater Regulations Could Impact the Design of Stormwater Controls Rachel Herbert USEPA/OW/OWM/WPD.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
Stormwater Regulations NC Division Of Water Quality DPPEA Technical Sharing Session May 25, 2004.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
MWCOG Water Resource Workshop “Preparing for Regulatory Change” February 20, 2004 Track 2: Panel #4 - Storm Water MS4 Regulation Paula Estornell, USEPA,
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
An Overview of our Community’s Stormwater Management Program
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Public Workshop: RIPDES Draft Phase II Storm Water Regulations RI Department of Environmental Management RIPDES Storm Water Program July 25, 2001 Contacts:
0 Montana Department of Environmental Quality Permitting and Compliance Division Water Protection Bureau Water Quality Discharge Permits Section Storm.
Training Approach and Expectations 2/6/20161 Training Approach and What to Expect.
Urban Runoff Greg Gearheart Christine Sotelo Eric Berntsen State Water Resources Control Board.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
The Clean Water Act (1977, 1981, 1987) By: Jonas Szajowitz.
Northern Virginia Regional Commission MS4 Workgroup March 17, 2011.
Pollution Control: For Field Office Construction Sites.
Sacramento County Stormwater Quality Program
EPA Public Meeting Dallas, Texas May 10, 2005
John Tinger U.S. EPA Region IX
Rule 5 and 13 Conversion Impacts
MS4 = Municipal Separated Storm Sewer System
Wastewater Permitting Updates
Sacramento County Stormwater Quality Program
Wastewater Permitting Updates
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Regulatory Overview Presented By: Wayne T. Craney, P.E. Engineering Manager Industrial Wastewater Enforcement Section Water Quality Division Department of Environmental Quality

Outline Regulatory History ODEQ Delegation Types of Permits in Oklahoma OKR10 History Future Regulatory Issues

Regulatory History Clean Water Act Passed in 1972 Focus on point source discharges Pipes, drains, other easily identified points of discharge Established the National Pollutant Discharge Elimination System (NPDES) Amended in 1987 Addressed more diffuse sources of pollution, such as stormwater discharges

Regulatory History Stormwater Regulations Phase I Promulgated in 1990 Required the following to be permitted: Medium and large municipal separate storm sewer systems (MS4s) – generally with populations ≥100,000 Construction activities disturbing ≥5 acres Industrial activities

Regulatory History Stormwater Regulations Phase II Established December 8, 1999 Required the following to be permitted: Small and medium MS4s and those within urbanized area Construction activities disturbing ≥1 acre or part of a larger common plan of development

Regulatory History Delegation of NPDES Programs to ODEQ November 19, 1996 Permitting and enforcement of municipal and industrial wastewater September 9, 1997 Stormwater discharges associated with construction and industrial sites Industrial pretreatment

Stormwater Programs DEQ has regulatory authority over the following stormwater discharges: From MS4s From industrial activities From construction activities Through the requirements of individual permits or OKG11 (concrete batch plants)

MS4s

Oklahoma’s MS4 Permits Phase I (2 permittees) Phase II (43 permittees) Individual permits City of Oklahoma City City of Tulsa Phase II (43 permittees) General permit 34 Cities 5 Counties 4 Non-Traditional Entities (e.g. Tinker AFB, OU) ODOT will be permitted when OKR04 is reauthorized

Oklahoma’s Phase I MS4 Permits Individual Permits Oklahoma City first issued September 1, 1995 Tulsa first issued April 1, 1997 Both are co-permittees with ODOT and OTA Pollution Prevention Approach Stormwater Management Program (SWMP) Developed by MS4 Spells out how MS4 will address/manage stormwater discharges

Oklahoma’s Phase II MS4 Permits General Permit, OKR04 Effective February 8, 2005 Pollution prevention approach Uses Stormwater Management Plan (SWMP) Must address six minimum control measures Select BMPs Identify “Measurable Goals” Evaluate effectiveness Update SWMP

Industrial Stormwater

Oklahoma’s Multi-Sector General Permit, OKR05 Only applies to certain industrial activities Defined by the Standard Industrial Classification (SIC) code Listed in Table 1-2 of permit by sector Only those industrial activities with SIC code in Table 1-2 need to have permit coverage Can cross-reference SIC code with NAICS code

Oklahoma’s Multi-Sector General Permit, OKR05 Requirements: Stormwater pollution prevention plan (SWP3) Best management practices (BMPs) Quarterly visual monitoring Regular site inspections No Exposure Criteria requirements No permit required if facility meets these requirements Essentially all possible pollution sources are kept under cover and not exposed to precipitation

Construction Stormwater

EPA’s Construction Stormwater General Permit (CGP) Applies where EPA is permitting authority i.e. Indian Lands First CGP issued in 1992 Current CGP issued on February 16, 2012 Effective for 5-year period Includes new requirements to implement Effluent Limitation Guidelines and New Source Performance Standards for Construction and Development point sources – aka C&D Rule

C&D Rule Requires construction site operators to meet restrictions on erosion and sediment control, pollution prevention, and stabilization Included a numeric turbidity limit for certain larger construction sites Turbidity Limit = 280 NTU Stayed by EPA on January 4, 2011 Not required to be incorporated in current construction stormwater general permits by EPA or delegated states

Oklahoma’s Construction Stormwater General Permit, OKR10 Is Oklahoma’s version of EPA’s CGP Effective for 5-year period Includes non-numeric effluent limitation guidelines from C&D Rule

Oklahoma’s Construction Stormwater General Permit, OKR10 Applies to construction activities that disturb an acre or greater or are part of a common plan of development that disturbs an acre or greater Requirements SWP3 Regular site inspections BMPs Buffers

Oklahoma’s Construction Stormwater General Permit, OKR10 Current permit development process Reviewed EPA’s current CGP Developed draft of DEQ CGP Conducted Stakeholder Advisory Committee and DEQ Work Group meetings to discuss proposed changes Issued CGP on August 13, 2012 Effective September 13, 2012

Local Construction Permits Each MS4 has its own construction stormwater permitting requirements Required as part of MS4 program Can be more stringent than state requirements Some require permits for sites disturbing less than one acre Be sure to check with local authorities to ensure you have the appropriate permits and are meeting all local stormwater regulations

Stormwater Enforcement Stormwater is the second largest category of complaints. Compliance with CWA provisions is the goal. The responsiveness of the RP determines if enforcement is necessary. If enforcement is necessary, it will be taken. Enforcement will require an administrative penalty.

Enforcement Orders Inspections (14 day compliance period) Notice of Violation (NOV) Expedited Consent Order (ECO) Consent Order (CO) with Penalty/Supplemental Environmental Project (SEP) Administrative Compliance Order (ACO) with Penalty/SEP

Enforcement Data FY 2010 FY 2011 FY 2012 33 NOVs issued, 9 Orders issued $72,800 in penalties/SEPs were collected FY 2011 14 NOVs issued, 7 Orders issued $34,500 in penalties/SEPs were collected FY 2012 13 NOVs issued, 4 Orders issued $30,750 in penalties/SEPs were collected

Future Regulatory Issues EPA Stormwater Rulemaking Rule to be proposed by June 10, 2013 Most apply to MS4s Of general note: Exploring options for establishing specific requirements for transportation facilities; and Evaluating additional provisions specific to the Chesapeake Bay watershed Not applicable in Oklahoma

Future Regulatory Issues EPA Stormwater Rulemaking Of note for construction industry: Develop performance standards from newly developed and redeveloped sites to better address stormwater management as projects are built Would require the implementation of post-construction best management practices to retain the runoff from a certain size storm event onsite

Future Regulatory Issues EPA Stormwater Rulemaking Of note for MS4s: Explore options for expanding the protections of the MS4 program; Evaluate options for establishing and implementing a municipal program to reduce discharges from existing development (aka “Retrofit”); Evaluate establishing a single set of minimum measures requirements for regulated MS4s.

Future Regulatory Issues Construction Effluent Limitation Guidelines Numeric Turbidity Limit Currently under review by EPA Additional treatment performance data from construction and development sites being sought Will propose limit in future May require construction site operators to sample and analyze stormwater discharges

DEQ Stormwater Contacts Permitting Mark Derichsweiler – (405) 702- 8188 Karen Milford – (405) 702- 8191 Permit Administration Matt Pace - (405) 702- 6209 Amber McIntyre - (405) 702- 6167 Matt Johnson- (405) 702- 6182 Compliance/Enforcement Wayne T. Craney - (405) 702- 8139 Bob Giger (North) - (405) 702- 8112 Michele Loudenback (West)– (405) 702 - 8116 Joe Willingham (South) - (405) 702- 8129

Questions, Comments, Discussion