Wickwire Gavin, P.C. Minnesota Department of Transportation November 29, 2000 Michael C. Loulakis, Esq. Design-Build: Understanding the Basics.

Slides:



Advertisements
Similar presentations
? Design/Build What do consultants think?. A piece of the puzzle D/B/O/FD/B/BC/M D/B/ODesign/BuildPM D/B/O/MOthers.
Advertisements

Construction Engineering 221
Organization of Primary Entities
Managing Construction Risks
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Project Procurement & Contract Administration Jiwei Ma
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
1 Basics of Government Contracting. Federal Procurement Background The U.S. Government is the world’s largest purchaser of goods and services 2.
A Match made in Heaven? Connecting you with a builder.
Your Deliver Method... …Pick it Early
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
CTC-470 Construction Administration Project Management Concepts.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
Construction Engineering 380 Professional Design Services Chapter 12 Appendix G.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Planning & Delivery Systems Construction Engineering 380 Engineering Law.
Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.
Honoraria for Design Build Projects Methodology Assessment Matrix.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
P ROJECT D ELIVERY M ETHODS. EFCA … is the sole association representing the engineering consultancy and related services industry in Europe represents.
Chief Legal Counsel, OSFC
Project Delivery Options in the California Construction Market CSI Fresno Chapter - February 16, 2010 PROJECT DELIVERY OPTIONS in the CALIFORNIA CONSTRUCTION.
Construction Contracts and Project Delivery Methods
TOPIC-9- PROJECT ORGANIZATION
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
TOPIC-9- PROJECT ORGANIZATION
You passed the Bond or secured some funds What do we do now? 2014.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
1 Chapter two ROAD TO DESIGN BUILD. 2 ROAD MAP  THE COST PLUS GUARANTEED MAXIMUM PRICE CONTRACT (GMP)  CM  PM  DB IS THE LATEST STAGE: NEW PERSPECTIVE.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Construction Management At Risk Process
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Progressive Design-Build: Examining the Structure, Procurement and Contracting Principles Michael C. Loulakis, Esq., DBIA Capital Project Strategies, LLC.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
CHANGING PROJECT DELIVERY SYSTEMS
Nepal administrative staff college
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Lease-Leaseback Project Delivery Method
Value-Based Contracting- It’s Not Just Price Anymore
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
PROJECT DELIVERY METHODS
Progressive Design-Build: Examining the Basics
CHANGING PROJECT DELIVERY SYSTEMS
Nepal administrative staff college
PROJECT DELIVERY METHODS
Design-Build Acquisition and Contract Incentives July 19, 2018
Design-Build Acquisition and Contract Incentives May 9, 2019
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Wickwire Gavin, P.C. Minnesota Department of Transportation November 29, 2000 Michael C. Loulakis, Esq. Design-Build: Understanding the Basics

Wickwire Gavin, P.C. Presentation Overview l What makes design-build different? l How are design-builders selected? l How are design-builders organized? l What are the key design-build contract and risk issues?

Wickwire Gavin, P.C. What Makes Design-Build Different? l Approach is structurally different from other delivery systems l Single point of responsibility l Procurement options l Performance specifications l Role of design professional

Wickwire Gavin, P.C. Design-Bid-Build

Wickwire Gavin, P.C. System Strengths l Lowest initial construction cost l Full design developed before money spent on construction l A/E hired by Owner directly to act in Owners best interest l Owner can be actively involved in design process l Completed plans and specifications as benchmark for performance l Predictable rights & responsibilities

Wickwire Gavin, P.C. System Weaknesses l Linear nature of process l Actual construction cost determined after design completed – little chance to influence design without project delay – no contractor involvement in design or conceptual pricing

Wickwire Gavin, P.C. Cost Influence Curve

Wickwire Gavin, P.C. System Weaknesses (contd) l Challenges in obtaining high quality product l Owner warrants sufficiency of plans & specifications to Contractor l High potential for adversarial relationships l Unrealistic Owner expectations

Wickwire Gavin, P.C. Standard of Care Not Exact Science: Moundsview v. Walijarvi Architects, doctors, engineers, attorneys and others deal in somewhat inexact sciences and are continually called upon to exercise their skilled judgment in order to anticipate and provide for random factors which are incapable of precise measurement. The indeterminate nature of these factors makes it impossible for professional service people to gauge them with complete accuracy in every instance * * * an architect cannot be certain that a structural design will interact with natural forces as anticipated * * * The law has traditionally required, not perfect results, but rather the exercise of that skill and judgment which can reasonably be expected from similarly situated professionals.

Wickwire Gavin, P.C. Owner Design/Builder Professional Subcontractors Trade Subcontractors Suppliers Design Criteria Consultant Design-Build

Wickwire Gavin, P.C. Design-Build Plus

Wickwire Gavin, P.C. System Strengths l Single point of responsibility l Facilitates project financing l Shorter time to develop project l Total cost can be determined very early

Wickwire Gavin, P.C. Team Integration: Scheduling Construction team brought on after design, with open bidding: Prog Dev Prelim Drwgs Final Drawings Bid Construction Award Construction team brought on early, facilitating fast- tracking: Prog Dev Prelim Drwgs Final Drawings Procurement & Construction Cost Established

Wickwire Gavin, P.C. System Strengths l Single point of responsibility l Facilitates project financing l Shorter time to develop project l Total cost can be determined very early

Wickwire Gavin, P.C. System Strengths (contd) l Design innovation more readily achieved l High level of accountability can result in higher quality l Potential construction cost savings l Reduced conflict

Wickwire Gavin, P.C. CII Quality Study Start Up Call Backs Op&Mt. ERSF InSp&Lo Environ Equip DB DBB

Wickwire Gavin, P.C. System Weaknesses l Time & cost of implementing competitive process l Overly involved Owner may impact Design-Builder l Price provided before design documents completed l A/E doesnt work directly for Owner

Wickwire Gavin, P.C. System Weaknesses (contd) l Constraints with public procurement laws l Antiquity of licensing laws l Unrealistic Owner expectations l Lack of substantial judicial precedent

Wickwire Gavin, P.C. How Are Design-Builders Selected? l Direct design-build l Competitive negotiation l Best value proposals l Low price proposals

Wickwire Gavin, P.C. Negotiated Design-Build Procurement l Short-list l Interviews l Selection based upon: – teams experience – financial capability – key people – current & projected workloads – similar projects – pricing: fee & general conditions

Wickwire Gavin, P.C. Competitive Design-Build Procurement l Short-list l Selection based upon: – weighted criteria – adjusted low-bid – equivalent design/low-bid – fixed budget/best design – meets criteria/low-bid

Wickwire Gavin, P.C. Weighted Criteria Example * award to proposer with highest total score

Wickwire Gavin, P.C. Adjusted Low-Bid Example Note: The adjustment of the bid is for selection only. The firms price proposal is the actual contract amount.

Wickwire Gavin, P.C. Procurement Challenges l Remembering the design-build difference l Using consultants l Bridging/detailed design l Establishing qualitative criteria l Objectively analyzing criteria

Wickwire Gavin, P.C. Procurement Challenges (contd) l Stipends l Using information of unsuccessful proposers l Keeping A/E involved throughout project l Integrating procurement laws into solicitation

Wickwire Gavin, P.C. Balancing the Structural Framework of the Project l Project delivery systems l Procurement methodology – Negotiated – Competitive l Contracting approaches – Lump sum – Cost plus (GMP) – Unit Price

Wickwire Gavin, P.C. How Are Design-Builders Organized? l Integrated Design-Build Firm l Contractor as lead l A/E as lead l Joint Venture l Developer as lead

Wickwire Gavin, P.C. What Organizational Structure Works Best? l Owners needs & comfort level are key drivers l Nature of project l Licensing requirements l Relationship among team members

Wickwire Gavin, P.C. Owner Design-Builder (Integrated) Suppliers Integrated Design-Build Trade Subcontractors Consulting Engineers

Wickwire Gavin, P.C. Owner Design-Builder (General Contractor) Suppliers Designer Trade Subcontractors Contractor-Led Design-Build

Wickwire Gavin, P.C. Owner Design-Builder (Designer) General Contractor Trade Subcontractors Designer-Led Design-Build Suppliers Consulting Engineers

Wickwire Gavin, P.C. Owner Joint Venture (General Contractor & Designer) General Contractor Trade Subcontractors Joint Venture/LLC Design-Build Suppliers Designer Consulting Engineers

Wickwire Gavin, P.C. Design-Build (Developer Model)

Wickwire Gavin, P.C. What are the Key Design-Build Contracting Issues? l Standard form contracts l Identifying scope of work l Ownership of documents l Owner's rights to review design l Changes of law l Establishing the GMP

Wickwire Gavin, P.C. Current U.S. Standard Form Design-Build Contracts l AGC (1999) l DBIA (1998) l AIA (1997) l EJCDC (1995)

Wickwire Gavin, P.C. What are the Key Design-Build Contracting Issues? l Standard form contracts l Identifying scope of work l Ownership of documents l Owner's rights to review design l Establishing the price

Wickwire Gavin, P.C. Key Contracting Issues (cont'd) l Changes of law l Permits l Site conditions l Time extension issues l Changes

Wickwire Gavin, P.C. Key Contracting Issues (cont'd) l Limitations of liability l Performance guarantees l Acceptance criteria l Warranty and design liability

Wickwire Gavin, P.C. Unique Contract Issues: Design-Builder and Designer l Designing to budget l Role of contractor during design l Duties during construction administration l Financial considerations – Contingencies – Bonus/penalty – E&O coverages

Wickwire Gavin, P.C. Unique Contract Issues: Design-Builder/Subcontractor l Design-build vs. trade subcontractors l Bidding on incomplete plans & specs l Determining when subcontractor becomes involved Wickwire Gavin, P.C.

Major Design-Build Risk Areas l Single point of responsibility l Design liability l Fair business dealings l Ownership of documents l Contract formation l Licensing Wickwire Gavin, P.C.

A/E vs. D/B Claims Frequency Per 100 Firms Source: Victor O. Schinnerer Company

Wickwire Gavin, P.C. Why Does History Show a Reduction of Liability Exposure? l Merger of design & construction promotes cooperation l Professional attitudes l Quality players l Owner fear of process l Partnering approach Wickwire Gavin, P.C.

Where is Design-Build Liability Heading? l Owner's role with design development & review l Business deal & scope of work l Procurement disputes Wickwire Gavin, P.C.

Where is Design-Build Liability Heading? (contd) l Subcontractor - prime disputes l Contingent liability for performance breaches l Magnitude of dollars when something goes wrong

Wickwire Gavin, P.C.