Welcome S.H. 177 in Braman
SH 177 Over East Branch of Dry Creek. Kay County, Oklahoma March 04, 2010 Public Information Meeting
The purpose of this meeting is to inform the public about the Departments plan to reconstruct the SH 177 Bridge over the East Branch of Dry Creek in Bramen, OK. NOTE:
The Bridge over the East Branch of Dry Creek was built in Why this project is needed:
Even with continued maintenance, over time the bridge has become load posted and has deteriorated to a point of structural deficiency and needs to be replaced. Why this project is needed:
What work is being done?
SH 177 over Dry Creek:
SH 177 over Dry Creek OFlow:
SH 177 over Unnamed Creek:
SH 177 over E. Branch Dry Creek:
What will it all look like?
Will there be a Detour? YES
Where will it take me?
When will ODOT start work? Start Construction March/April 2010 Start Construction March/April 2010 Contract is for 100 Days Contract is for 100 Days This project will have a $3750 a day incentive/disincentive This project will have a $3750 a day incentive/disincentive Estimated Project Cost = $1.370 Million Estimated Project Cost = $1.370 Million
Questions?
Thank you for your participation