BRIDGE INSPECTION House Transportation Finance November 12, 2008 Dan Dorgan State Bridge Engineer Duane Hill Assistant District Engineer Duluth.

Slides:



Advertisements
Similar presentations
WELCOME BUDGET MANAGERS AND CHIEF FISCAL OFFICERS
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Elements of an Effective Safety and Health Program
1. International Module – 503 Noise: Measurement & Its Effects Day 5.
INTERNAL CONTROLS.
RECORD KEEPING Cooperative Development of Operational
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
for Cabin Safety Inspectors
New York States Apprenticeship Training Program A Review of the Recommendations found in the Internal Process Mapping Report and the External Consultants.
Department of Finance and Administration 1 NASC Annual Conference Friday, March 25, 2011 Phoenix, Arizona The Mississippi Experience.
HIPAA Security Presentation to The American Hospital Association Dianne Faup Office of HIPAA Standards November 5, 2003.
The Managing Authority –Keystone of the Control System
NPA WG : Single and multiple releases
ICAO AVIATION SAFETY PROGRAMMES
Elements of High Quality Preschool Programs New Jersey Administrative Code N.J.A.C. 6A:13A.
Session I Chapters 1-5 Presented by… Lynn Boyer, Ph.D.
Threshold System Presented by Jan Stanley, State Title I Director Office of Assessment and Accountability Fall Title I Directors Conference October 23-25,
GOALS FOR TODAY Understand how to write a HACCP Plan
1 NORTH CAROLINA COUNCIL OF INTERNAL AUDITING October 31, 2007.
Compliance Monitoring Orientation. Monitoring Components Focus Site Review/Fiscal Monitoring SPAM.
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
2007 PAVEMENT MARKING ACTIVITIES AND PERFORMANCE
Title I Site Eligibility Ranking & Serving Schools NCLB Technical Assistance Audio March 28, :30 PM March 29, :30 AM Alaska Department of.
Site Safety Plans PFN ME 35B.
Privacy Impact Assessment Future Directions TRICARE Management Activity HEALTH AFFAIRS 2009 Data Protection Seminar TMA Privacy Office.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Configuration management
© © QA Software Pty Ltd All rights reserved 1 Project Information Management Tools Inspection and Defects Management System for Projects By QA Software.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
TRAIL BRIDGE INSPECTION 101
Housing Notice H Use of New Regulation Section 8 Housing Assistance Payments (HAP) Contracts Residual Receipts to Offset Project-Based Section.
1 Quality Indicators for Device Demonstrations April 21, 2009 Lisa Kosh Diana Carl.
AEMCPAGE Relaunch 1 June 2009.
Yuhwei Ling Replacement Issues A Different Use of Claim Reports Yuhwei Ling Rutgers University Libraries Distributed Technical Services.
Early Childhood Special Education Part B, Section 619* Part C to B Transition by Three Jessica Brady, Noel Cole Michigan Department of Education Office.
January 10, 2008www.infosecurity.ca.gov/1 Role, Responsibility and Authority of New Office Presented by Colleen Pedroza, State Chief Information Security.
VOORBLAD.
Checking & Corrective Action
Evaluation Orientation Meeting Teacher Evaluation System
Privacy Reporting and Investment Certification TRICARE Management Activity HEALTH AFFAIRS 2009 Data Protection Seminar TMA Privacy Office.
IS-700.A: National Incident Management System, An Introduction
Harassment, Intimidation and Bullying NJ State Board of Education February
CMPT 275 Software Engineering
Safety and Health Programs MODULE 7. 2©2006 TEEX Brainstorm  What makes a good safety and health program?  What does a good program do for you?
Visual 5.1 General Staff Functions Unit 5: General Staff Functions.
Visual 6.1 Organizational Flexibility Unit 6: Organizational Flexibility.
Functional Areas & Positions
CALIFORNIA DEPARTMENT OF EDUCATION Jack O’Connell, State Superintendent of Public Instruction California Department of Education Special Education Self-
Visual 3.1 Delegation of Authority & Management by Objectives Unit 3: Delegation of Authority & Management by Objectives.
1 Phase III: Planning Action Developing Improvement Plans.
Teacher Evaluation System LSKD Site Administrator Training August 6, 2014.
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
National Bridge Inspection Standards (NBIS)
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
Office of Highway Safety Bridge Load Rating Dan Walsh.
Snapshot of Member States’ Feedback after the Minneapolis Bridge Collapse - Summary of Information Collected via Recent Surveys Malcolm Kerley, Chair –
Office of Highway Safety Bridge Inspections Dan Walsh.
Overview of Bridge Inspections in Missouri David Koenig Bridge Management Engineer Missouri Department of Transportation Missouri Bridge Conference April.
Office of Highway Safety Gusset Plate Inspection Issues Mark Bagnard.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
NBIS – National Bridge Inspection Standards National standards for the proper safety inspection and evaluation of all hwy bridges NBI – National Bridge.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Inspector's Role and Responsibilities
INSPECTION POLICIES AND, PROCEDURES CLASS A CERTIFICATION REQUIREMNTS
Inspector's Role and Responsibilities
Inspector's Role and Responsibilities
System Safety Regulation
Presentation transcript:

BRIDGE INSPECTION House Transportation Finance November 12, 2008 Dan Dorgan State Bridge Engineer Duane Hill Assistant District Engineer Duluth

2 Focus Today Brief overview of bridge inspection requirements Actions taken in the last year in the bridge inspection area

3 Bridge Inspection Requirements See Appendix for information regarding: Governing Regulations for Inspections Bridge Inspection Frequency Bridge Inspector Qualifications

4 Gusset Plate Reviews January 15, 2008 NTSB urges truss and gusset plate ratings for bridges citing design error in I-35W Bridge. No software or rating methods existed for checking gusset plates MnDOT began developing a checking process for gusset plates in October 2007 MnDOT had already begun the analysis of several bridges

5 Gusset Plate Rating Results By July 1, 2008: 25 trusses rated to verify original design By August 1, 2008: 25 bridge inspections of gussets completed No design deficiencies similar to I-35W found

6 Results of Reviews St. Cloud Bridge – closed and replacement accelerated Blatnik Bridge in Duluth – gusset stiffened to restore full safety factor Winona Bridge – reinforced gusset due to corrosion Hastings Bridge – unsupported edge stiffened to meet code requirements

7 Fracture Critical Bridge Inspection Positions Office of Legislative Auditor in February 2008 recommends MnDOT provide additional funds for fracture critical inspections. MnDOT identifies 8 additional inspection positions Bridge Office: 1 Inspection Engineer position filled 2 Inspector positions filled 3 Engineering positions in process District 6, Rochester and Metro: 2 Inspection Engineer positions in process

8 Governors Inspection Program Governor ordered on August 2, 2007: In-depth inspection of all state and local Fracture Critical Bridges Routine inspection of all state and local structurally deficient bridges Routine inspection of all other state highway bridges Stem to Stern review of MnDOTs Bridge Inspection Program

9 Governors Inspection Program By December 20, 2007 T.H. System: 3,875 Routine and FC Inspections Completed 270 by Consultants Local System: 141 FC Inspections Completed 43 by Consultants 843 Structurally Deficient Bridges

10 17 Critical Findings Identified During Statewide Inspections 6 Bridges Closed Norman County Road 3 Mountain Lake Township Road in Cottonwood County Municipal Street 5 in Russell State Game Preserve Road 222 in Wabasha County Redwood Township Road 185 in Redwood County Municipal Street 18 in the City of Carver 6 Bridges with Load or Lane Restrictions 5 Bridges Repaired, Including 2 State Highway Bridges T.H. 11 bridge over the Red River of the North in Kittson County was closed briefly until repairs were made on a beam that showed cracking T.H. 10 near Little Falls was also closed briefly for repair after inspectors discovered damage to a beam, apparently caused when it was hit by a truck following the bridges previous inspection

PB Americas Inc. Process Review

12 Findings MnDOT is in compliance with NBIS in the areas of: Bridge inspection organization Qualifications of personnel Inspection frequency Inspection procedures Inventory Additionally, MnDOT inspector ratings were consistent with Consultant inspector

13 Recommendations Develop procedures to track maintenance action items resulting from inspection findings Provide more inspection training to Program Administrators Hire more fracture critical bridge inspectors Develop and document inspection procedures for complex bridges Ensure that inspection data is entered into the database within the newly required interval Clarify responsibilities among fracture critical inspectors and agency owners Develop standardized narrative bridge inspection reports

14 Documenting Post-Inspection Bridge Maintenance Office of Legislative Auditor recommended implementing standard procedures to document post-inspection bridge maintenance follow up. A Bridge Inspection/Maintenance Assessment Form has been developed and distributed to Districts. Purpose is to document maintenance actions to be scheduled. By December 2008, a standard Bridge Maintenance Scheduling and Completion Spreadsheet will be adopted to track completion of maintenance actions.

15 Fracture Critical Inspection QA Process - 7 Day Inspection Summary 7 Day Inspection Summary submitted by Inspection Team Leader provided to the Bridge Office gives a quick look at changes and significant findings within 7 days of the inspection: Significant Deficiency noted? New Load Rating recommended? Traffic or Safety Hazard present? Bridge Element Condition summary? Significant findings that may need further review in the next 6 months? Purpose is to identify deficiencies that may require immediate action before the In-Depth Report is written and reviewed

16 Fracture Critical Inspection QA Process - In-depth Bridge Inspection Evaluation Internal structural review by a Bridge Office Engineer of the In-Depth Inspection Report within 30 days of submitting a draft report Were critical findings resolved promptly? Are conclusions logically stated and correct? Is the structure functioning as designed? Should the load rating be re-evaluated? Owner must acknowledge receipt of the report, and concurrence or disagreement with the evaluation and recommendations

17 Routine Inspections – Longstanding QA Processes All Inspection Reports reviewed and signed by the Program Administrator, who must be a Registered Engineer Annual Audits conducted by MnDOT and FHWA for NBIS compliance 20 to 25 Counties/Cities/Districts (20% of state total) audited by reviewing records provided to the Bridge Office Of the 20%, 8 to 12 Counties/Cities/Districts receive field review each year to audit inspection procedures, qualifications of inspection staff, inspection files and documentation, and field inspection

18 Audit Rotational Map 2007 Agencies Include: RockNobles PipestoneMurray LincolnLyon RedwoodYellow Medicine RenvilleLac Qui Parle ChippewaKandiyohi SwiftBig Stone StevensPope District 4District

19 Tracking Process for Inspection Completion Began reporting quarterly in Sept, 2008: Number of inspections overdue by 1 and 3 months Number of inspections completed but not entered into PONTIS database within the required 90 days

20 Recurring Inspection Training Training scheduled for 2009: Refresher training to be held at multiple locations statewide to maintain inspector certifications – see Appendix for topics FHWA Bridge Safety Classes to be held at MnDOT Training Center Bridge Safety Class 1 – Engineering Concepts for Bridge Inspectors (1 week class) Bridge Safety Class 2 – Safety Inspection of In- Service Bridges (2 week class) Fracture Critical Inspection Class – Techniques for Steel Bridges (3.5 day class)

21 Technical Memorandums In February 2008, updated the following Technical Memorandums for the most current FHWA requirements: Critical Deficiencies Found During Bridge Inspections – process to address, report and resolve Guidelines for Fracture Critical Inspections of Fracture Critical Bridges, Special Inspections for other Bridges, and Underwater Inspections – procedures, frequency, inspector qualifications, Quality Assurance and reporting

22 Inspection Equipment and Technology Additional ultrasonic testing equipment purchased for expanded Fracture Critical staff Contracting for Ground Penetrating Radar of selected bridge decks for delamination detection Reviewing software and devices for use in electronic field data collection to aid bridge inspectors Ordering additional snooper and trailer-mounted inspection platform for smaller bridges

23 Removal of Potential Concrete Spalls from Bridge Decks Bridge crews have routinely removed loose concrete from older structures Maryland Ave/I-35E incident of July 26, 2008 should not have occurred Information, guidance and reminder to devote resources for identifying and removing potential spalls was sent to Districts on 7/28, 8/4 and 10/23/08 Priorities for underdeck inspection and removal assigned according to deck condition As of November 5, 2008, Districts report removing potential spalls from at least 16 bridges

24 National Involvement and Leadership MnDOT has shared with other states in numerous forums our experiences and learnings from the I- 35W bridge The process MnDOT developed to review the adequacy of gusset plates has been shared nationally and included in our manuals on the web Participating in national research on gusset plate design and analysis Participated in round table discussions of Bridge Inspection practices with Midwest States

25 Bridge Monitoring Installations and Research State of the art bridge monitoring systems installed in I-35W St. Anthony Bridge A monitoring system is included in the Eastbound Wakota Bridge, currently under construction Since the early 1990s, bridge monitoring systems have been used on at least 17 MnDOT bridges University of Minnesota currently conducting research for MnDOT titled Bridge Health Monitoring and Inspection – A Survey of Methods to survey available technologies and assess their capabilities MnDOT and the U of M are also developing a project to monitor an existing bridge

26 Appendix

27 Governing Regulations for Inspections National Bridge Inspection Standards (NBIS) Requirements established via Federal Rulemaking by the Federal Highway Administration American Association of State Highway and Transportation Officials Manual for Condition Evaluation of Bridges Minnesota State Statute and Rules MnDOT Policies

28 Bridge Inspection Frequency Bridge Inspection Cycles – bridges are inspected once every 24 months per National Bridge Inventory System. In Minnesota, if the condition of the deck, superstructure or substructure is rated 4 or less, bridges are inspected annually. Fracture critical bridges get an in-depth inspection at least once every 24 months. Underwater bridge inspections are required every 60 months.

29 Bridge Inspector Qualifications MnDOT has 75 certified inspection Team Leaders that meet State and Federal requirements. Qualifications required for certification include: Professional Engineering license or 5 years of experience performing inspections Successful completion of 3 week FHWA approved inspector training Passing a proficiency field exam (MN requirement) Attending refresher training to maintain certification

30 Bridge Safety Inspection Seminars – Refresher Training 2008 Topics Railroad Bridge Inspections 2007 Statewide Bridge Inspection Effort – Governors Mandate I-35W Bridge Collapse and Investigation Critical Findings Process PONTIS Online Demo for Inspection Date Entry Bridge Scour evaluation and documentation Structural Inventory Reports information and updating 2009 Topics (proposed) Fracture Critical Inspections I-35W Bridge Collapse and Investigation Bridge Railings and Guardrail inspection and coding instructions PONTIS Online Demo for Inspection Date Entry Inspection note-taking and proper documentation of findings Measuring section loss Load ratings Bridge Inspection Manual Updates Gusset plate elements Scour and channel cross sections Hinge bearings Work Zone Safety during Bridge Inspections