Highway 19 Mill & Overlay Project. Better Roads for Minnesota.

Slides:



Advertisements
Similar presentations
Piedmont Improvement Program NC Society of Engineers
Advertisements

PUBLIC WORKS DEPARTMENT MILLS ROAD PAVING MSBU PUBLIC HEARING October 30, 2007 PUBLIC WORKS DEPARTMENT MILLS ROAD PAVING MSBU PUBLIC HEARING October 30,
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Accessible Pedestrian Signals (APS)
Detectable Warnings X Correct Placement if X < 5 feet
City of Hubbard Transportation System Plan Update April 25, 2012.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Accessible Pedestrian Signal Features New possibilities for access in the US Janet M. Barlow Accessible Design for the Blind Asheville, North Carolina.
Working with Accessible Pedestrian Signals
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Accessible Pedestrian Signal
Meeting the Needs of All Pedestrians
Comprehensive Pedestrian Enforcement Captain Thomas C. Didone Montgomery County, MD Police Department 1.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.
2009 MUTCD Revisions Part 4 – Traffic Signals Revisions to the 2009 MUTCD.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
ACCESSIBLE PEDESTRIAN SIGNALS Jim Lampe, Control Technologies September 24, 2008.
Accessible Pedestrian Signals Guidelines and Policies Mark Luszcz, P.E., PTOE Assistant Chief Traffic Engineer Delaware Department of Transportation Presentation.
Barriers to Use of Fixed Route Transit Services Janet M. Barlow Certified Orientation and Mobility Specialist Accessible Design for the Blind NCAMPO conference.
Florida Department of Transportation, November 2009
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD CA MUTCD 2012 Revisions to Part 4 – Highway Traffic Signals.
1 Austin Transportation Department Ali Mozdbar, P.E., PTOE Division Manager, Traffic Signals Traffic Signal Features for Pedestrians & Bicyclists.
Bicycle and Pedestrian Funding Overview NYS Bicycle and Pedestrian Advisory Council August 2, 2010 Albany, New York.
Pedestrian rights and responsibility (a) Upon the immediate approach of an authorized emergency vehicle making use of an audible signal meeting.
Cote Saint-Luc Road and Westminster Avenue Presented by Steven Erdelyi.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Asset Management Cindy VanDyke Office of Planning Georgia Department of Transportation.
2009 ACEC/ODOT CONFERENCE ODOT’S 1R PROGRAM Liz Hunt, P.E. ODOT Pavement Services Engineer.
Presented by Dan Dawson, Otak Prepared by Janet M. Barlow
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
Pedestrians with Vision Loss or Blindness. How many people are blind or visually impaired now 4.3 million Americans are severely visually impaired 1.1.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
STA Safety Project PID #76439 December 12, 2006.
Access for Individuals who are visually impaired or blind Janet M. Barlow Accessible Design for the Blind 2015 Walking Summit October 29, 2015.
BLACKWATER HERITAGE STATE TRAIL By Vernon Compton November 13, 2015 Emerald Coast Transportation Symposium.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
Maintenance and Temporary Traffic Control
Indiana MUTCD: for Operations & Maintenance Issues/Solutions – Part II.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
FLORIDA DEPARTMENT OF TRANSPORTATION MAINTENANCE RATING PROGRAM.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Improvements to Stockton Street
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
Public Information Meeting NW 100th Street Reconstruction Project
Transportation Alternatives (TA) Set-aside
Highway 169 Bridge Replacement & Pavement Resurfacing
Issaquah-Fall City Road
SE 12th Street Roadway Improvements February 8, 2005.
Walker Street Reconstruction Project 25% Design Public Hearing
Commissioners Presentation
Safe Routes to School John Schaefer State Coordinator.
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

Highway 19 Mill & Overlay Project

Better Roads for Minnesota

Background More than 700 miles of Trunk Highway in Minnesota are currently in Poor condition. Despite approximately $980 million of planned pavement investments from , the number of miles in Poor condition is projected to increase to 1,900 by the year This will have a significant negative impact on the traveling public, the states economy and our quality of life. It will also dramatically increase the future cost of maintaining paved roads in Minnesota.

Program The Minnesota Department of Transportations Better Roads for Minnesota is a four-year program that will: Significantly improve state highway pavement conditions – the goal is to improve more than 500 miles of roads and reduce Poor pavements Provide pavement-related improvements in the areas of safety, ADA accessibility and other infrastructure like drainage facilities Explore innovative engineering and delivery techniques to get more bang for the taxpayer dollar Provide numerous jobs for Minnesota citizens

Rating Overview Highway 19 Before Highway 19 After

Purpose and Need for Improvements Improve pavement condition and ride quality Enhance safety and flow of traffic with turn lane additions Improvements for curbed-urban section Address Americans with Disabilities Act (ADA) deficiencies Address drainage and erosion issues

Project layout

Project Location Map for SP (TH 56)

Cannon Falls Layout

Accessible pedestrian signals provide directions in alternative formats such as: Verbal messages Audible tones Vibrating surfaces They also provide pedestrians with information about: Existence and location of the pushbutton Beginning of the "WALK" interval Direction of the crosswalk Audible signals Audible signals can be heard six to twelve feet from the pushbutton. Volumes become louder or softer in response to level of traffic noise. Audible signals provide information using: Repeating tone indicating location of pushbutton Tone, click or spoken "WAIT" indicating button was pushed Tone or spoken WALK message providing name of street to be crossed Spoken countdown of remaining crossing time Tactile signals Tactile signals are located at the pushbutton. Tactile signals provide information using: Raised arrow pointing in direction of travel and vibrating during the WALK signal Braille symbols providing name of street Benefits Improve ability of pedestrians with hearing and visual impairments to cross the street safely Allow pedestrians to more accurately judge beginning of WALK interval Reduce crossings begun during DONT WALK phase

Schedule and Next Steps Design Complete - November 15, 2012 Project Letting - January 25, 2013 Construction Begins (anticipated) - August, 2013 Tied to the Highway 56 Construction – August, 2013 Schedule of construction in Northfield - August - October 2013 Completion Date (anticipated) - October 2013

Project awarded to: Crane Creek Asphalt Division of Mathy Construction