This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written.

Slides:



Advertisements
Similar presentations
Air Transport System JTI CLEAN SKY
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Presented by: Presented By: MIL-STD 881 Update: NDIA PMSC Neil F. Albert MCR, LLC 12 May 2010.
Airpower: the Industry Vision
1 CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002 Barry Billmann Federal Aviation Administration Presentation GNSS 3.2.
INNOCON Innovative solutions to the modern real time Arial surveillance challenges.
SECURITY AND DEFENCE SOLUTIONS Peter Carlqvist, Senior Regional Director Americas 23 March 2011 Saab Global Value Chain Seminar, Marriott Halifax Harbour.
Southampton 1 P Bradshaw EDXCW. Commercial Aircraft Conceptual Design - Some Considerations 15 th November 2005 P Bradshaw EDXCW Wing & Aerodynamics Skill.
Project Status Update II R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME)
PROJECT ICARUS by Noah Michael, Student Project Manager & Dr. Nikos Mourtos, Faculty Project Manager AE 170A/B Course Instructor.
© COPYRIGHT ABCONSULTING Understanding Flight Operations For Manufacturers by Antoine BRU.
1 Model 162 SkyCatcher Update Julie Filucci Cessna Pilot Center Manager.
Quality at your service. Key Figures Established December 5th, Subsidiaries in France, and 1 in China Turnover 2.5 M.€ in people at your.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
The program work breakdown structure (WBS) establishes the essential
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
SAE Aero Design West 2008 Information Session. What is the SAE competition? Who - Undergrad and Grad Students (SAE Members) Competition Components - Design.
VESTEL Defence Industry Overview.
John Gruetzmacher, Lockheed Martin
Activities proposed for procurement (EGEP-1st Batch ) 1.RIMS V3 Prototype Development 2.Galileo 2G Phase A/B Satellite Studies 3.Electrical Propulsion.
Defense & Homeland Security Cluster Initiative Project Update Presented by Wayne Freeman, TDA 10/1/09.
Software Project Management
Nova Labs - RhinoHawk Introduction Meeting March 20 th, 2014.
Technology Maturation for the Automated Aerial Refueling (AAR) Project Carol Ventresca SynGenics Corporation Case Number: 88ABW , Distribution:
1 1 Clean Sky : vue d’ensemble Eric Dautriat, Directeur Exécutif Toulouse, 1 er février 2011.
October 2006 NASA Dryden Status Aerospace Control & Guidance Sub-committee Williamsburg, VA October 2006 John Bosworth (661)
Requirements and Operations Team Industry Day Briefing 17 January, 2002.
Jan 2011SFWA ITD Coordination Jens König Airbus Slide 1 Smart Fixed Wing Aircraft –ITD CfP#8 Info Day Toulouse, 1st February 2011.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
Corotweek n°9 - ESTEC December 6th, 2005 COROT PROJECT STATUS 1 COROT PROJECT STATUS Thien LAM TRONG.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Delivering innovative ISTAR solutions SG.E
1 WP4 – System Testbed Trial 2 preparation Barcelona 3/03/05 Marco Bobbio Pallavicini - Carlo Gavazzi Space SpA.
Joint Strike Fighter F-35 An International Collaboration Jon Waldrop
Final report and briefing
1 Galileo Research and Development Activities GALILEO GALILEO 6 th Framework Programme Aeronautics & Space November 2003.
Doris Hamill UAV Business Development Lead NASA Langley Research Center and Hampton Roads First Responders.
CRESCENDO CRESCENDO Philippe HOMSI Paul WEBSTER
FP7/SPACE: Activity Strengthening of Space foundations / Research to support space science and exploration - SPA The research leading.
Flygteknik 2010 The CleanSky “Smart Fixed Wing Aircraft Integrated Technology Demonstrator” (SFWA-ITD): Saab’s participation in Clean Sky and our contribution.
UK Aerial Robotics Team UK IDEA Laboratory Workforce Development: The UK Aerial Robotics Team and the PAX River Student UAV Competition Dale McClure (Matt.
1 DISTRIBUTION A. Approved for Public Release; Distribution Unlimited. 88ABW , 23 May Integrity  Service  Excellence ADT 101: Introduction.
A White Paper on the potential for a small scale airborne system for Threat assessment, Characterization, Monitoring, and Tactical feed-back for deployment.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
ICC Presentation of Ifield Computer Consultancy Limited Delivering safe, reliable mission critical ATC solutions and services.
Collaborating with Europe “The Mecachrome Story” Charles Magnan December 2011.
Critical Design Review (CDR)
Big Data in Airbus Flight Test and Integration Center
FLIGHT TESTING THE GRIPEN NG DEMONSTRATOR Mikael SeidlMattias Bergström Project Test PilotProject Manager Gripen NG Demo 19 October 2010.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Objective 1 Development of NATO integrated R&D Management Concept and Model Presented by Assoc. Prof. Dr Tsvetan Tsvetkov UNWE-DNRS
1 Engineering Integrated Solutions (EIS) Capabilities Overview 2012 An Introduction.
1 -REF Unclassified This document contains proprietary information of Israel Aerospace Industries Ltd. and may not be reproduced, copied, disclosed or.
Data herein presented are under NASA/JSRDA terms and conditions and is proprietary to PMEI, Inc. 1 Airborne Internet and the NASA/SATS Simulation and Integration.
Collaborative & Robust Engineering using Simulation Capability Enabling Next Design Optimisation © This document has been produced under the EC FP7.
1 An Introduction to AIAI Dr. Jessica Chen-Burger Artificial Intelligence Applications Institute School of Informatics University of Edinburgh.
Flygteknik 2010 Oct 19 MIDCAS – Sense and Avoid for UAS Bengt-Göran Sundqvist, Saab AB.
Aero Vodochody Aerospace Leader
Slide 1 PDT Europe 2014, October 2014, Paris 1 AeroSpace and Defence Industries Association of Europe Through Life Cycle Interoperability as developed.
ESA Iris Programme: status
CAD/PAD Development Process
I&T&C Organization Chart
Chris Shaw, EUROCONTROL Experimental Centre
F-18 Hornet and F-18 Super Hornet
Saab ongoing FCS activities
AGNINAYAN S PATIL 1AP07EC004 ECE
Advance Exploration Programs, Thales Alenia Space in Italy
Lockheed Martin Canada’s SMB Mentoring Program
Integration & Test Instrument Operations Coordination
Presentation transcript:

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 1 NEURON Unmanned Combat Aerial Vehicle Jonas Hamberg Flygteknik 2010

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 2 Contents Overview of the Neuron Programme The Neuron UCAV Concept Where we are right now

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 3 The Neuron Programme

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 4 Development of strategic know-how  Mastering UCAV technologies  Maintaining the European knowledgebase & key technologies  Preparing future European Combat Aircraft A Project for the European Defence Industry

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 5 Programme milestones Europe’s UCAV technology demonstrator A French MoD initiative launched at Le Bourget 2003 Unveiled at Le Bourget 2005 Contract in February 2006 First flight 2012 Budget  400 M€

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 6 Demonstration Goals – a single demonstrator Low level signature  Radar  Infrared Air to Ground mission, with ground station connected to a C4ISR/NCW network  Air to Ground weapon delivery from internal bay with the possibility to replan the mission during flight Search for innovative technologies to reduce cost  Airframe  Avionics  COTS

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 7 NEURON Proprietary Information Volvo Aero RRTM Selex-Galileo Av. Thales Industrial Organization

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 8 Neuron Partners

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 9 Swedish work share Low Observability Exhaust Assembly Design Design and Manufacturing of Landing Gear doors Lead for Avionics Computers and Equipment Mission Software Autonomy Functions Airframe Design and Manufacture of Front & Middle Fuselage Fuel System Design and Manufacture of the Fuel System Aerodynamics Participation in the aerodynamic shaping team Windtunnel testing General Activities Program Management General Design Airworthiness Critical part of Ground Control Station Testing Flight test in Sweden (LO tests & weapon release) Particiaption in Rig and Ground Tests

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 10 ITALY: Perdasdefogu Test Range SWEDEN: Vidsel Test Range FRANCE: Istres Test Centre Flight test locations

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 11 The Neuron UCAV Concept

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 12 Configuration and shape Main characteristics: Fuselage length  9 m Wing span  12.5 m 2 Weapon Bays MTOW  7000 kg Engine: RRTM Adour Mk951H Main performances: Max. Mach < 0.9

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 13 The Neuron System Ground segment GPS NCW/C4I Systems Data Link GCS Flight Test Room

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 14 NEURON Proprietary Information MISSION Casa Alenia DAv Saab FCS DAv Alenia GCS CasaAlenia Saab System Workshare

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 15 Kritisk del i markstationen Består av 2 delar Nominal VSMCBkritisk SDCBicke kritisk Funktionalitet – VSMCB Visa kritiska varningar Ge möjlighet att mata in kritiska kommandon Validering av kommandon från SDCB och markstation Funktionalitet – SDCB Visa FTI kommandon Ge möjlighet att mata in FTI- kommandon Hårdvara Säkerhetskritisk dator Display + knappar Vehicle Safety Mission Control Box

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 16 Where we are right now October 2010

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 17 TF : Feasibility Phase TC1 : Definition Phase TC2 : Development Procurement/ Manufacturing Final assembly TC3 : Integration Rig Pre-flight ground tests Ground & Flight demos First Flight : Spring 2012 E 2 E 3 E1 D3 D2 D1 C1 C2 B2 B1 A3 ISR5 ISR6PFSR ISR7 ISR8QR ISR5ISR4 CDR 3 rd update 2 nd update 4 th update Time Schedule Fuselage delivery

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 18 Strategy for Design and Manufacturing The manufacturing will be jig-less to a large extent Flexible tooling for assembly Model Based Definition is used throughout the project to minimize the use of drawings

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 19

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 20 Neuron Assembly with Flexapods

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 21 Installation of the Airduct

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 22 Assembly snapshots

This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent. Saab Aeronautics 23