? Design/Build What do consultants think?. A piece of the puzzle D/B/O/FD/B/BC/M D/B/ODesign/BuildPM D/B/O/MOthers.

Slides:



Advertisements
Similar presentations
Wickwire Gavin, P.C. Minnesota Department of Transportation November 29, 2000 Michael C. Loulakis, Esq. Design-Build: Understanding the Basics.
Advertisements

CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Solving Challenges Others Cannot Statutory Frameworks for Public Private Partnerships HMFA Lone Star Chapter 2009 Winter Institute Dallas, TX Christopher.
Managing Construction Risks
Portfolio Management Initiative
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
DPS 304 : Procurement Management Purchasing Role in a Business System
Understanding Public Private Partnerships in Canada John Gamble, CET, P.Eng. OSPE Policy Series June 1, 2011.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Alternative Project Delivery
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Industry and Competitive Analysis
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Chapter 1: Creating Business Advantage with IT
Exploring Corporate Strategy 8e, © Pearson Education The Focus of Part 1: The Strategic Position  How to analyse an organisation’s position in.
1 Chapter 1 Introduction To Purchasing IDIS 424 Spring 2004.
PROJECT DELIVERY SYSTEMS
Organization Development and Change
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
1 PMIG PUBLIC SECTOR PROCUREMENT BEST PRACTICES & LESSONS LEARNED Kevin James Barrie Kroukamp.
Chapter 5 Initiating and Planning Systems Development Projects
The Importance of the Qualifications Based Selection (QBS) Process
Honoraria for Design Build Projects Methodology Assessment Matrix.
Initiating and Planning Systems Development projects
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
The Best Practice: Selecting a Professional Consultant Canadian Public Procurement Forum October 6, 2010 FIDIC Resources.
Solving Challenges Others Cannot Virginia’s Public Private Partnership Law Toyo University Tokyo, Japan Christopher D. Lloyd September 29, 2008.
Industrial Engineering Roles In Industry
Chapter 5 : Initiating and Planning Systems Development Projects.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
© 2005 by Prentice Hall Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer.
Construction Engineering and Management 1 Cost Benefits Structural Safety Architect Feasibility Assessment of architects Functional Aesthetic constructability.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Quality Based Selection The Best Practice for Selecting Professional Consultants [DATE]
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Solving Challenges Others Cannot Using Public Private Partnerships Parkland Blue Ribbon Panel Christopher D. Lloyd October 22, 2007.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Solving Challenges Others Cannot Statutory Frameworks for Public Private Partnerships NCPPP/AGC Conference Phoenix, AZ Christopher D. Lloyd January 27,
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
Introduction to Project Management.  Explain what a project is?  Describe project management.  Understand project management framework.  Discuss the.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
Locally Administered Federal-Aid Project Initiation Workshop Project Scoping John Condon & Mike Barry November 14,
Improved Project Outcomes through Collaboration and Technology Charles Hardy, CCM Deputy Director, GSA PBS Great Lakes Region - Office of Property Development.
Alternate Project Delivery Systems for Governments.
Office of Major Project Development (OMPD) Overview November 2015.
Construction Management At Risk Process
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
F Designed to give you knowledge and application of: Section B: Key environmental influences & constraints on business & accounting B1. Political.
Nordic transport infrastructure market – modelling and forecasting methods for asset management and business development Markku Riihimäki, Pekka.
Infrastructure Ontario
CHANGING PROJECT DELIVERY SYSTEMS
Nepal administrative staff college
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
PRESENTER Jose A. Galan ▸ Division Director, Internal Services Department, Real Estate Development Division ▸ Current Chair of the Florida Council For.
ACEC INDIANA Environmental Business & Funding Source Conference
PROJECT DELIVERY METHODS
CHANGING PROJECT DELIVERY SYSTEMS
Nepal administrative staff college
PROJECT DELIVERY METHODS
Introduction DEFINATION :-
The Role of Private Sector in Capital Budgeting
Honoraria for Design Build Projects Methodology Assessment Matrix
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

? Design/Build What do consultants think?

A piece of the puzzle D/B/O/FD/B/BC/M D/B/ODesign/BuildPM D/B/O/MOthers

ACEC Support Member of coalition in mid 1990s for design/build Federal legislation Supported two-step process

Two-Step Process Step 1 Predesign Step 2 Design/Build Design (advisor) oversight

ACEC Now Supports Value Based Delivery Systems (VBDS) Design/build Its a piece of the puzzle

A piece of the puzzle D/B/O/FD/B/BC/M D/B/ODesign/BuildPM D/B/O/MOthers

Value Based Delivery System Concepts Select the most appropriate, not the best (there is no best) Multiple systems need to be available

Founding Principles of VBDS Communication Responsiveness Quality Integrity Look for best value

Broader View of Asset Management American Infrastructure Consortium Infrastructure delivery Operations and maintenance Rehabilitation and replacement Financial and legal impacts Social and economic impacts In this view, D/B is an element only, a piece of a bigger puzzle.

Asset Management Puzzle Infrastructur e Delivery Rehabilitation and Replacement Financial and Legal Impacts Social and EconomicImpacts Operations and Maintenance

Procurement Process Issues Competitive bids Competitive proposals Areas of Concern –Quality –Openness Scoping Report for NB US-23 Over Middle Branch Macon River Structure No. BO2-1 of Developing Bridge Repairs Alternatives (Bridge Scoping) University Region - Seven Bridges Michigan Department of Transportation JN-M84216 October 13, 2000

American Bar Association Code for Design/Build Allows both Competitive proposals allows negotiations based on ethical business practices, no auction Owners need technical advice through entire process

Design Requirements Needed per ABA Code Features, functions, characteristics, qualities and properties that are required by the State Anticipated schedule, including start, duration, and completion Estimated budgets (as applicable to the specific procurement) for design, construction, operation and maintenance The design requirements may, but need not, include drawings and other documents illustrating the scale and relationship of the features, functions, and characteristics of the project.

Key Issues to be Considered Quality –Qualifications based selection Initial price Life-cycle price Schedule Permitting Financing

Advantages Single source of quality responsibility Possibly less change orders Shorter in-service time

Disadvantages Less control of details –Design –Construction –Materials and equipment –Design life Early commitment to total project Owner changes can have bigger impact Faster expenditure of funds Variance of qualifications across a team

Threat of Substitute Products or Services Threat of New Entrants Competitive Forces Bargaining Power of Suppliers Bargaining Power of Buyers Advanced Technology International Firms/Management Firms (D/B/F/O, D/B/O, D/B/O/M) DOTs/Public Owners/ Utilities/Private Owners Design-Builders, CM, Program Managers Rivalry Among Existing Competitors

The VBDS Approach D/B/BD/BC/MD/B/O/FD/B/O/MOther Method 1 Method 2 Method 3 Selected Delivery Method Process Criteria VBDS Foundation Principles Project Characteristics STEP #3: Technical Advisor applies VBDS Foundation Principles. Identifies method that meets Owners Outcome/Best Value Goals. STEP #2: Owner engages technical advisor to identify appropriate delivery method based on project characteristics. STEP #1: Available Delivery Approaches

Design/Build Engineering Opportunities Design/builder (lead or member of a joint venture) Consultant to design/builder Responsible for developing the project design within budgetary constraints Responsible for developing the construction documents to be used by the design/build team

Design/Build Risks Liability will vary depending on the role of the engineer As a lead or member of joint venture, engineer may take on full responsibility and liability for the project As consultant to the Design/Builder, engineer may take on the same liability or less than under Design/Bid/Build If not lead, no direct commitment to owner

Design/Build Benefits Coordination between parties Control over budget and schedule Conflicts are internalized