Preparedness / Response Tools for Local OfficialsPage 1 The National Response System Presented by EPA Region 6 Response & Prevention Branch.

Slides:



Advertisements
Similar presentations
Emergency Management Emergency Planning Emergency Preparedness Disaster Management Disaster Recovery Coordination Primary Functions.
Advertisements

Background 40 CFR CFR Established the NRC as the single point of contact for reporting Pollution and.
40 CFR 300. Overview of the NCP Roles and Responsibilities National Response Priorities General Pattern of Response Relationship with the Area Contingency.
A Brief Overview of Emergency Management Office of Emergency Management April 2006 Prepared By: The Spartanburg County Office of Emergency Management.
US&R Planning. US&R Planning Issues Establish authority and responsibility Assess vulnerability and hazards Identify resources Coordination of response.
Prepare + Prevent + Respond + Recover + Mitigate Louisiana State Police Emergency Services Unit.
Presentation to RRT/NWAC Spills Prevention, Preparedness and Response Program Dale Jensen, Program Manager March 10, 2011.
EPCRA Emergency Planning and Community Right-to-Know Suzanne Powers
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration NW Area Committee Meeting Focus on Pipelines PREVENTION & PREPAREDNESS.
Fall “To the extent that a grant is used to train emergency responders, the State or Indian tribe shall provide written certification to the.
Hurricane Katrina: Addressing Impacts on Water Systems and Ambient Waters -- State/EPA Response J. Scott Gordon Water Division Deputy Director U. S. EPA,
Emergency Management Program
Emergency Response: Preparing for Disasters & Emergency Incidents June 2, 2015 Guest Secured Password: rangers!
CLICK TO EDIT MASTER TITLE STYLE TRIPR FLAMMABLE LIQUID UNIT TRAINS 6.0 LOGISTICS AND RESOURCE MANAGEMENT.
Petrochemicals in harbor areas; safety supervision and emergency response Presented by Captain David Murk U.S. Coast Guard Senior Maritime Advisor to the.
CLICK TO EDIT MASTER TITLE STYLE TRIPR FLAMMABLE LIQUID UNIT TRAINS 1.0 PRE-INCIDENT PLANNING AND PREPAREDNESS.
NATIONAL RESPONSE SYSTEM OPA 90. World spills by size Oil Spills Involving More Than 10 Million Gallons Gallons in millions Rank according to total volume.
EPCRA1 The Emergency Planning and Community Right-to-Know Act (EPCRA) The Emergency Planning and Community Right-to-Know Act (EPCRA)
Federal Emergency Management Agency Radiological Emergency Preparedness Program Region I, Boston September 10, 2012.
Presented to: RETA National Conference – Atlanta November 5, 2014 If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us.
National Response Plan Overview [date] [location] [presenter]
EMERGENCY RESPONSE PLANNING 2005 ARIPPA Technical Symposium David B. Binder Tanner Industries, Inc
EPCRA BACKGROUND EPCRA 301 Toxics Release Inventory (TRI)(Form R)/ RMP (Risk Management Program) Federal Forms Tier Two Oreg on has HSIS.
NRNRT The National Response System and the Incident Command System/Unified Command Oceania Alaska Caribbean X VIII IX VII VI V IV III II I.
What is the RRT? Regional Response Teams were created by the Oil Pollution Act of OPA90 has been implemented by regulations found in title 40 Code.
North Central Florida Local Emergency Planning Committee Alachua, Bradford, Columbia, Dixie, Gilchrist, Hamilton, Lafayette, Madison, Suwannee,Taylor,
State Emergency Response Commission SERC January 5, 2009 TENNESSEE EMERGENCY MANAGEMENT AGENCY.
NRT/RRT Co-Chairs Meeting Columbia Shuttle Incident Overview Debbie Dietrich NRT Chair, National Response Team March 4, 2003.
National Rural Transit Assistance Program. Learning Objectives Safety Safety Security Security Emergency Preparedness Emergency Preparedness.
Federal Volunteer Management Policies 1. Background National Response Team “Use of Volunteers Guidelines For Oil Spills” - September 2012 Based on the.
National Response Plan and DOI Mission Management Briefing for DOI Annual Business Conference Laurence I. Broun Departmental Emergency Coordinator Office.
National Response Center (NRC)  The primary function of the National Response Center is to serve as the sole national point of contact for reporting all.
NW Area Committee Meeting 13 February, 2013 Heather A. Parker U.S. Coast Guard 13 th District Seattle, WA.
National Response Plan and DOI Mission Management Briefing for DOI Annual Business Conference Laurence I. Broun Departmental Emergency Coordinator Office.
IS-804: ESF #4 – Firefighting Firefighting
Linn & Benton Counties Mid-Valley. Mid-Valley LEPC  Today's Presentation: Mid-Valley LEPC – who we are! Grants – Why apply? Emergency Plans – What are.
2004 Co–Chairs Meeting REGIONAL RESPONSE TEAM VII.
More Than 30,000 Environmental Emergencies Occur Each Year Are You Ready? U.S. National Response Team.
1 USCG/NRT Special Teams Workshop CDR Steve Danielczyk, CIH U.S. Coast Guard Headquarters Office of Response (G-MOR)
1 Agreement Between the United States Environmental Protection Agency, the United States Coast Guard, the United States Department of State, and the Panama.
Planning Ahead: NCP, RCP, Area Plans, LEPC Plans, and Homeland Security.
Preparedness, Prevention and Response U.S. EPA Pacific Southwest Region Emergency Prevention and Preparedness November 16, 2006 Kathryn Lawrence.
NW Area Committee and Regional Response Team X. What is an Area Committee? Interagency group charged with pre-planning for oil spills Comprised of any.
Mark Hyland, Operations Director, Maine Emergency Management Agency.
NRT/RRT Co-Chairs Meeting 2003 NRT Initiatives/Accomplishments and Challenges John Gustafson Executive Director, National Response Team.
A Brief Overview of Emergency Management Office of Emergency Management September 2004 Prepared By: Marybeth Solesbee, CEM.
0 FEMA Region 6 Floods: The Response and the Costs Bob Bennett Response Division FEMA Region 6.
2015 USACE Exercise – December 1, 2015 New Madrid Seismic Zone – Earthquake FEMA Mission, Legal Authorities and Regional Capability Overview Gus Wulfkuhle.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Oil Spill Response Plans A History Lesson PHMSA Review and Approval.
LOCAL EMERGENCY PLANNING COMMITTEE The Basics:. Federal Legislation Emergency Planning Community Right-to-Know Act (EPCRA)of 1986; commonly referred to.
2015 San Diego Area Contingency Plan. San Diego FOSC Zone Orange County/San Diego Line Approx. Interstate 5 US/Mexico Border Out 12 NM.
State Fire Marshal’s Office Washington State Fire Marshal’s Office Deputy State Fire Marshal Scott Lancaster.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PREVENTION & PREPAREDNESS May 11, 2016 REGIONAL RESPONSE TEAM.
Oil and Hazardous Substance Contingency Planning Presented By Jeffery Smith Regional Hazmat Coordinator Bureau of Reclamation Lower Colorado River Region.
Exercise Presentation. WELCOME AND INTRODUCTIONS.
TIER 2 REPORTING Bernardine Zimmerman TIER 2 CHEMICAL REPORTING PROGRAM or
1 EPA Region 4 Approach to a New Madrid Earthquake Response Art Smith Federal On-Scene Coordinator EPA Region 4 December 1, 2015.
REGIONAL RESPONSE TEAM NOVEMBER 5, Executive Order: Improving Chemical Facility Safety & Security.
CO Chemical Safety Workshops for Regulated Facilities
IS-810: ESF #10 – Oil and Hazardous Materials Response
North Carolina Hazardous Materials Regional Response Teams
Coast Guard Sector Lake Michigan Area Committee (SLMAC)
Welcome! December 1, 2010.
USCG Roles & Responsibilities During a Ship Fire
Richard Franklin - FOSC
Regional Response Team X
National Response Center (NRC)
An Introduction To VDEM VDEM Director of External Affairs
TRIPR High Hazard Flammable trains
Regional Response Team X
Presentation transcript:

Preparedness / Response Tools for Local OfficialsPage 1 The National Response System Presented by EPA Region 6 Response & Prevention Branch

Preparedness / Response Tools for Local OfficialsPage 2 Why do we need a the NRS? Chief Supply, Haskell, OK –1 employee died, 2 others injured, community evacuation, large community concerns –local volunteer fire dept. not sure of hazards or proper response to fire

Preparedness / Response Tools for Local OfficialsPage 3 Why do we need a the NRS? Panhandle Agri-Co, Stratford, TX –Release of 60,000 pounds of anhydrous ammonia from bulk tank –12 local responders & owner of facility injured, 1,000 community residents evacuated

Preparedness / Response Tools for Local OfficialsPage 4 Where we’re at ?? EPA Notifications per Region ( )

Preparedness / Response Tools for Local OfficialsPage 5 Releases in Region 6 ( ) Where we’re at ??

Preparedness / Response Tools for Local OfficialsPage 6 Consequences of Releases -- reported at time of release ( ) Where we’re at ??

Preparedness / Response Tools for Local OfficialsPage 7 The National Contingency Plan Found at 40 Code of Federal Regulations (CFR) Part 300 The NCP is the blueprint which: –outlines the structure of the National Response System (NRS) –defines the responsibilities for each component of the NRS –provides the mechanism for successful responses to oil and hazardous substance releases

Preparedness / Response Tools for Local OfficialsPage 8 National Response Team Consists of 16 Federal agencies: EPA, USCG, FEMA, HHS, GSA, DOD, DOE, DOI, DOT, USDA, DOJ, DOS, NRC, DOT, DOA, NOAA EPA chaired, USCG vice-chaired Primary responsibilities are planning and preparedness May participate in large, multi-region responses

Preparedness / Response Tools for Local OfficialsPage 9 Regional Response Teams Consist of State and 15 Federal agencies of the National Response Team Co-Chaired by United States Coast Guard (USCG) and EPA Primary responsibilities are planning and preparedness During responses provide assistance and support as requested by OSC

Preparedness / Response Tools for Local OfficialsPage 10 Planning responsibilities include participation in development of: –Regional Contingency Plan (RCP) –Area Contingency Plan (ACP) for assigned area Preparedness responsibilities include participation in drills and exercises conducted by industry, LEPCs, Area Committees, RRT, and NRT. At an incident directs federal containment, removal, and disposal efforts and coordinates other efforts at scene. Federal On-Scene Coordinator

Preparedness / Response Tools for Local OfficialsPage 11 National Response System Concept of Operations

Preparedness / Response Tools for Local OfficialsPage 12 Superfund Technical Assessment and Response Team (START) Emergency Response Planning/Prevention Site Characterization Removal Action Support Start / ERRS Contractor Emergency Response and Removal Services Rapid Deployment Complete Removal and Remediation Capabilities

Preparedness / Response Tools for Local OfficialsPage 13 NCP RCPs ACPs LEPC Plans State Plans LEVEL NRTNATIONAL REGIONALRRTs AREA COMMITTEES PLANS AREA STATE LOCAL SERCs LEPCs MANAGING AGENCY EMERGENCY RESPONSEFIRST RESPONDERS INDUSTRY Plans Supporting the NRS

Preparedness / Response Tools for Local OfficialsPage 14 Activate the federal portion of the National Response System by calling: –National Response Center (NRC) 24 hr: –EPA Regional 24-hr hotline –Nearest USCG unit How to access the NRS

Preparedness / Response Tools for Local OfficialsPage 15 4 th Annual HOTZONE Conference October , 2003 Adams Mark Hotel Houston, TX 9 th Annual Region 6 LEPC Conference November 7 – 13, 2003 Adams Mark Hotel, Houston, TX 17 th International Hazardous Materials Spills Conference May 1 - 6, 2004 San Antonio Convention Center San Antonio, TX For logistical and registration information on all of these conferences, go to:

Preparedness / Response Tools for Local OfficialsPage 16 Available Software

Preparedness / Response Tools for Local OfficialsPage 17 National Response Center Right-to-Know Net EPA’s Chemical Emergency Prevention and Preparedness Office Chemical Safety Board National Response Team Federal Response Plan EPA Office of Emergency Response superfund/programs/er For More Information

Preparedness / Response Tools for Local OfficialsPage 18 Columbia Shuttle Recovery Operations EPA Region 6

Preparedness / Response Tools for Local OfficialsPage 19 Nitrogen Tetroxide Nitrogen Tetroxide Hydrazine Monomethyl- Hydrazine Nitrogen Liquid Oxygen Gaseous Oxygen Liquid Hydrogen Helium Liquid Oxygen Monomethyl- Hydrazine Ammonia Hydrazine Hydraulic Fluid Helium Hazardous Fluids and Gases on Shuttle (Major Tanks & Cylinders) H2 = Hydrogen O2 = Oxygen GHE = Helium N204 = Nitrogen Tetroxide GN2 = Nitrogen MMH = Mono-methyl hydrazine N2H4 = Hydrazine 127 of 167 hazardous materials containers collected 76 % of hazardous materials, 20 % of pyrotechnics accounted for as of 04/30/03 TankTypeContentsSizeTotalTankTypeContentsSizeTotal PRSDAluminumH241.5”9RCSTitaniumN2O439”3 PRSDInconelO233.5”9RCSTitaniumMMH39”3 RCSTI / KevlarGHE18”6 OMS & ENG & GN2 TitaniumGN2 5.5” & 3.5” 4 MPS & ECLTI / KevlarGHE26”12ECL EMU TI or Cress Air6”4 OMSTitaniumN2O449 x 94”2MPS & ECLTI / KevlarGHE12”2 OMSTitaniumMMH49 x 94”2MPS & OMSTI / KevlarGHE40”5 APUTitaniumN2H428”3 AmmoniaTeardropNH317.5”2Total64

Preparedness / Response Tools for Local OfficialsPage 20

Preparedness / Response Tools for Local OfficialsPage 21 Shuttle Material Recovery Ground Search Status 81,965 pieces of shuttle material collected at Kennedy Space Center 48,501 points recovered / catalogued as of April 30, 2003 by EPA million man hours for the ground search million acres searched mile swath from Boston, MA to Seattle, WA 3.680,748 acres ground searched – total feet walked equivalent to Earth to Moon 40 % by weight collected – 20 % originally predicted Roughly the size of Delaware and Rhode Island combined  400+ federal, state and local agencies, volunteer groups and private organizations responded to the incident  25,000 +/- personnel were involved in the recovery project