Www.lirneasia.net Early warning systems in disaster- risk reduction Rohan Samarajiva & Nuwan Waidyanatha IDRC-CIDA workshop 12 July 2007, Moratuwa, Sri.

Slides:



Advertisements
Similar presentations
G.W ICT for risk management FP6 Strategic Objective ICT for Environment Information Society & Media DG European Commission, Brussels Guy Weets Deputy.
Advertisements

13th Meeting of the Regional Interagency Working Group on ICT, 20 November 2009, Bangkok, Thailand 13th Meeting of the Regional Interagency Working Group.
The Anticipated Response: an essential element in end-to-end, community-early warning systems Topics: 1.Frameworks. 2.Trends: operational and institutional.
Confidential: All Rights Reserved Web-based Alerting The International Common Alerting Protocol (CAP) provides for a standardized alerting format for all.
Last-Mile Hazard Warning System in Sri Lanka: Community-based Alerting and Notification Regional Joint Conference on Disaster Relief and Management, Alexandria,
1 IPAWS: The Integrated Public Alert and Warning System.
A Brief Overview of Emergency Management Office of Emergency Management April 2006 Prepared By: The Spartanburg County Office of Emergency Management.
Sameera Wijerathna. Agenda The Need Uniqueness Recognition How it works The Potential.
Emergency Preparedness
Capability Cliff Notes Series PHEP Capability 4—Emergency Public Information and Warning What Is It And How Will We Measure It?
Role of Census of population and Housing on Disaster Management.
Making Communities Disaster Resilient; The Sarvodaya Approach Dr.Vinya S. Ariyaratne Executive Director Sarvodaya Shramadana Movement Sri Lanka.
Use of CAP for Disease Surveillance: Real Time Biosurveillance Program Nuwan Waidyanatha LIRNEasia
An Analysis of The Mobile Market and Location-Based Services What About Wireless…?
Home Networking Jessica Knox. Home Networking is… The collection of elements that process, manage, transport, and store information, Enabling the connection.
© 2009 Research In Motion Limited Methods of application development for mobile devices.
Current Developments & Challenges in Tsunami Warning Systems: Sri Lanka Rohan Samarajiva
Tsunami Early Warning System SRI LANKA
National Public Health Performance Standards Local Assessment Instrument Essential Service:3 Inform, Educate, and Empower People about Health Issues.
NEW DEVELOPMENTS AFTER TSUNAMI SRI LANKA.
Dialog-University of Moratuwa Mobile Communications Research Laboratory Kutila Gunasekera Director, Projects.
Chat and Text: A New Way to Access I&R. What is Text? Text messaging, or texting, is the act of typing and sending a brief, electronic message between.
By Daniel Nanghaka Founder – ILICIT Africa, and EWERDIMA Platform Early Warning Early.
Community-based Hazard Warnings in Rural Sri Lanka: Performance of Alerting and Notification in a Last-Mile Relay Nuwan Waidyanatha, LIRNEasia Gordon A.
Mobilizing ICTs for early warning: Lessons of the 2004 tsunami Rohan Samarajiva.
Determination of Hazard from the National Level: Sri Lanka Experience Natasha Udu-gama 25 October 2007 Dhaka, Bangladesh.
Current Technical Designs for Tsunami Warning Systems: Sri Lanka Rohan Samarajiva.
Media Literacy: Australian context & framework Nerida O’Loughlin General Manager, Outputs Division International Media Literacy Research Forum May 15 th,
Recent Emergencies: Impact on breast feeding – Tsunami and Conflict Experience in Sri Lanka Dr.Vinya S. Ariyaratne Executive Director Sarvodaya Shramadana.
1 1 Creating the Idaho State Alert & Warnings System (ISAWS) Ward Noland, BSEM State/Local Warning Coordinator Idaho Bureau of Homeland Security.
ICTs in disaster-risk reduction Rohan Samarajiva IDRC-CIDA workshop 12 July 2007, Moratuwa, Sri Lanka.
ITU-T/OASIS Workshop and Demonstration of Advances in ICT Standards for Public Warning Geneva, October 2006 International Telecommunication Union.
Transforming Community Services Commissioning Information for Community Services Stakeholder Workshop 14 October 2009 Coleen Milligan – Project Manager.
Assisted GPS Tian Qiao. What is AGPS Assisted GPS, generally abbreviated as A-GPS, is a system which can improve the startup performance of a GPS satellite-based.
Survivor Centric Emergency Management Integrating the Access and Functional Needs of the Whole Community Before, During and After Disasters August 2015.
U.S. National Tsunami Hazard Mitigation Program 5-Year Review David Green, NOAA Tsunami Program Manager National Oceanic and Atmospheric Administration.
Early Warning Systems Used in Micronesia Chip Guard Weather Forecast Office Guam International Training Workshop on Tropical Cyclone Disaster Reduction.
What have we learned from the tsunami? Rohan Samarajiva.
Content Standard for Last-Mile Alert and Notification Sharing Knowledge on Disaster Warning, with a focus on Community-based Last-Mile Warning Systems.
A National All-Hazards Warning System for Sri Lanka Rohan Samarajiva, LIRNEasia Video News Conference Colombo, Sri Lanka 10 February 2005.
Learning from the tsunami Rohan Samarajiva
 2007, Verizon. All rights reserved. Advanced Emergency Network Capabilities & Communications Solutions Presentation to The Joint Advisory Committee on.
NETWORKING FUNDAMENTALS. Network+ Guide to Networks, 4e2.
Elements of a community-based warning system* Rohan Samarajiva Presentation at Workshop on Sharing Knowledge 5 March 2008, Jakarta *
17 th of July timeline and AP assessment of preparedness Rohan Samarajiva.
Evaluation of Last-Mile Hazard Warning Information & Communication Technology Hardware and Software Systems Peter Anderson Simon Fraser University Vancouver,
Expert Consultation: Early Warning System for Dam Related Hazards Rohan Samarajiva, LIRNEasia Distance Learning Centre, SLIDA Campus 20 May 2005.
Effective use of telecom & electronic media in disaster-risk reduction Rohan Samarajiva Presentation at meeting convened by Ministry.
The Integrated Public Alert and Warning System (IPAWS) Antwane Johnson, Director.
Making communities disaster resilient Rohan Samarajiva Global Knowledge 3 11 December 2007, Kuala Lumpur Findings from work on preparing.
Responsive Innovation for Disaster Mitigation Gordon A. Gow University of Alberta.
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
Disaster Risk Management Concepts and Applications Southern Province of Sri Lanka 1.
11 S I A M E M B E R C O M P A N I E S Satellite Industry Response to 2005 Hurricanes Satellites = Redundancy, Ubiquity, Interoperability.
Community and business resilience
Integrated Public Alert and Warning System
WHY VIDEO SURVELLIANCE
Early Warning in Sri Lankan Landslides
Regional Joint Conference on Disaster Relief and Management,
Florida Public Service Commission’s 2007 Storm Preparedness Workshop
Chapter 1- Introduction
Satellites = Redundancy, Ubiquity, Interoperability
What Happened in Sri Lanka? And why it won’t be so bad next time
Ali Umar FRCSI EMDM FCEM
World Meteorological Organization 2008 December 10 Geneva, Switzerland
WorldSpace Satellite Radio
UN Office for the Coordination of Humanitarian Affairs (OCHA)
WHY VIDEO SURVELLIANCE
DEWN Disaster and Emergency Warning Network
Presentation transcript:

Early warning systems in disaster- risk reduction Rohan Samarajiva & Nuwan Waidyanatha IDRC-CIDA workshop 12 July 2007, Moratuwa, Sri Lanka

Agenda  Disaster risk reduction: what must be done  The LIRNEasia-Sarvodaya community-based approach to early warning  Pilot project research design Different communication technologies ERP [Emergency Response Planning] training v no training Organized villages vs. less organized villages  Findings Efficacy of Hazard Info Hub at SCMDC Reliability of technologies Reliability of systems Training Organizational development Women

Physical world where hazards occur Symbolic world where action originates Mediated interpersonal Sri Lanka on December 26 th, 2004 With a few insignificant exceptions, a world without ICTs One in 500 died in Sri Lanka without one minute of official warning

Physical world where hazards occur Symbolic world where action originates Mass media Mediated interpersonal Warnings How ICTs should be deployed More time to run; more lives saved

Who should act?  Early warning is a classic public good Government must supply  Early warning is based on incomplete, probabilistic information and judgment Government must take the responsibility  75% of tsunami warnings in the Pacific are false; false warnings can be dangerous  Community preparedness (e.g., “tsunami ready” designations in the US) is vital  But if government appears unready to act... Second-best options must be explored

Early warning chain (standard form) Citizens National early warning center First responders Media

Early warning chain (community based; applicable to Last-Mile HazInfo project) ERP1 National early warning center Villagers SCDMC ERP4 ERP3 ERP2 ICT Guard ians From domestic & international sources ERP1 National early warning center Villagers SCDMC ERP4 ERP3 ERP2 ICT Guard ians

Pilot project design, 32 villages With ERP TrainingNo ERP Training Sarvodaya Stage1, 2, 3 VSAT Urawatha (Galle) MoP Nidavur (Batticalo) FxP Thirukadalar (Trincomale e) AREA Moratuwella (Colombo) MoP Meddhawatha (Matara) MoP Thambiluvil (Kalmunai) FxP Oluville (Kalmunai) AREA Maggona (Kalutara) AREA + RAD Modarapallas sa (Hambantota ) AREA + FxP Wathegama North (Matara) AREA + MoP Palmunnai (Batticalo) Control Village Abeyasinghepu ra (Ampara) AREA + RAD Thondamanar (Jaffna) AREA + FxP Karathivu (Kalmunai) AREA + MoP Munnai (Jaffna) Control Village Modara (Colombo) SarvodayaStage 4 VSAT Modaragama (Hambantota ) MoP Diyalagoda (Kalutara) FxP Periyakallar (Batticalo) AREA Panama North (Ampara) MoP Satur- kondagnya (Batticallo) MoP Samodhagama (Hambantota) FxP Indivinna (Galle) AREA Brahamana- wattha (Galle) AREA + RAD Kalmunai II (Kalmunai) AREA + FxP Samudragam a (Trincomalee AREA + MoP Valhengoda (Galle) Control Village Mirissa South (Matara) AREA + RAD Venamulla (Galle) AREA + FxP Kottegoda (Matara) AREA + MoP Thallala South (Matara) Control Village Thalpitiya (Kalutara) AREA: Addressable Radio for Emergency Alerts, Class B configuration of WorldSpace System MoP: Java enabled Mobile Phone, Dialog-Microimage innovation MiDews application RAD: Remote Alarm Device, Dialog-University-of-Moratuwa Innovation FxP: CDMA Wireless Fixed Phones with 1xRTT functions, Sri Lanka Telecom VSAT: Very Small Aperture Terminals coupled with Internet Public Alerting System Innovative- Tech & Solana Networks

Research questions  What technology is best for reaching the community?  What emergency response plans are best for saving lives of villagers? How important is training? How significant is the level of organization in the village?  How does the intervention affect women?  Will the ICTs be integrated into everyday life?

CDMA Fixed Phone GSM Mobile Phone Remote Alarm Device Addressable Radios for Emergency Alerts Very Small Aperture Terminals ICTs used in reaching communities

Reliability is the difference between the time it takes HIH Monitor to issue the CAP message and the time the message is received by the ICT Guardian. Reliability is the difference between the time it takes HIH Monitor to receive message and the time the message is received by the Community. Reliability of technologies & systems

Early warning chain (community based; applicable to Last-Mile HazInfo project) ERP1 National early warning center Villagers SCDMC ERP4 ERP3 ERP2 ICT Guard ians From domestic & international sources HIH

HIH Monitor Message Relay Process VarianceAverage Expected value = 95% Download was quick because the simulation was staged within a defined three-hour time period. Acknowledgement was rare, possibly because they knew it was a drill. Event of Interest step was time consuming (2-page form) and needs improvement. Approval was instantaneous because the SCDMC Director was on premises during drills. Issue of alert took time because Each ICT required its own interface to issue the alert. Evaluation of Hazard Info Hub (HIH) actions

What is being measured...  difference between the time it takes HIH Monitor to issue the CAP message and the time the message is received by the ICT Guardian

Coupled ICTs performed better than individual ICTs with the AREA + FXP combination being most reliable. Of the stand alone devices AREA is the most reliable with 13 of 16 working; The community had difficulty in installing and maintaining the MiDews Java applet on their MOPs and 7 of 10 participating MOPs failed; RADs were not tested as stand alone devices. FXP and MOP failed in North- East due to services being deactivated due to war. Reliability of technology connecting HIH to ICT Guardians (inner circle)

Early warning chain (community based; applicable to Last-Mile HazInfo project) ERP1 National early warning center Villagers SCDMC ERP4 ERP3 ERP2 ICT Guard ians From domestic & international sources

What is being measured...  difference between the time it takes HIH Monitor to receive message and the time the message is received by the Community

Reliability of systems (outer circle) AREA alone is unidirectional. S tand-alone AREA, RAD, and VSAT score low because alerts received in English only; all other ICT configurations accommodate three languages. Using a combination of FXP or MOP coupled with one-way Satellite communication device AREA is most effective because it - Provides larger geographic coverage with Satellite covering GSM and CDMA shadow areas - Increases bi-directional capabilities of communities to report local events to the Hub - Language diversity reduces ambiguity in messages

All 28 ICT Guardians received training. Only 16 of 32 Community ERP Coordinators received ERP Training. ICT Guardians were coached during live-exercises; random events over longer period would show different results. ERP Coordinators were also coached therefore results are not accurate. Still could not reach the required level. Effects of training of ICT Guardians & ERP Coordinators

Effect of organizational level of villages Organizational capacity is unimportant in the adoption of existing technologies such as Mobile and Fixed Phones. This is also evident from the Control Villages, which used their own Mobile Phones and Fixed Phones. Organizational capacity is important when adopting new technologies such as AREA. Unfortunately RAD was not tested in less organized villages. It is easier to organize disaster preparedness activities in organized villages.

72% of adult participants were female because the simulations were conducted between 0900 and 1200hrs when most men were out of the home. The women showed enthusiasm and willingness to participate in disaster management activities. High participation of children occurred because the mothers brought their children along as they could not be left at home alone.

Integration of ICTs into everyday life  Expected to get data from Diaries that had been provided From use records  Both failed because Dairies were not maintained Use was very low  In some cases, District Sarvodaya Offices has reclaimed the phones for use in urgent IDP activities Appeared that people thought we did not want them to use the ICTs for other purposes and did not volunteer information such as listening to BBC on AREA sets

Conclusions  Critically important to get SCDMC running as a 24/7 operation and to have disaster risk-reduction embedded as a central element of the worldview of all at Sarvodaya Need to integrate management of all disaster projects Think beyond project horizon (has already started through strategic planning process)  Robust early warning for community-based approach (as opposed to direct-to-citizen approach) requires Bidirectionality of media, for local reporting and acknowledgement  No stand-alone AREA sets CAP compliance and ability to send long messages in multiple languages  AREA sets in combination with other media Mobile has potential, after software problems solved, but script limitations make it a distinct also-ran

Conclusions  A community-based approach requires Training, both for ICT Guardians and for ERP Coordinators Higher organizational levels  No conclusive evidence, but training through periodic simulations may be more effective than conventional training  No conclusive evidence, but integration into everyday activities may not be very important in the case of AREA+  No conclusive evidence, but women are unlikely to be marginalized from community-based approaches in Sri Lanka

Project-specific conclusions  Pilot projects on truly novel problems require imagination and flexibility Example: change from strict adherence to “no- training” condition in the face of demands from villages Substitution of ham radios by other technologies  Those closest to the action know best Project Director and IDRC Task Managers gave the main players the freedom to run the project