The Project Schedule and Budget

Slides:



Advertisements
Similar presentations
Chapter 3 Managing the Information Systems Project
Advertisements

Scheduling the Project
MEM 612 Project Management Chapter 5 Scheduling the Project.
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
1 Project Management Principles ΥΠΕΥΘΥΝΟΣ: Θ. ΜΑΝΑΒΗΣ Lecture 3 – Planning and Scheduling.
Project Scheduling: Networks, Duration estimation, and Critical Path.
SW Project Management Project Schedule and Budget
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Information Technology Project Management
Project Time Management
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management.
Project Cost Management
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Chapter 6 Introduction to Microsoft Project
Information Technology Project Management
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Edward B. Farkas, Managing Director, Project Management Practice
Information Technology Project Management By Denny Ganjar Purnama, MTI Universitas Pembangunan Jaya April 2014.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
1-1 Information Technology Project Management by Jack T. Marchewka Power Point Slides by Richard Erickson, Northern Illinois University Copyright 2003.
Lecture 5 Title: Project Time Management By: Mr Hashem Alaidaros MIS 434.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
EGNR 300 Project Management Planning & Scheduling ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport,
Project Schedule and Budget 1. T HE P ROJECT P LANNING F RAMEWORK 2.
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Chapter 17 Project Tracking. Objectives Identify, develop, and use project management tools to track project progress: Schedules Gantt Charts Toll Gate.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
PMP, CAPM, PgMP, PMI-SP, PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services.
Advanced Project Management Project Time Management Ghazala Amin.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Project Scheduling Software
Project Management in Practice
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
Chapter 3 Managing the Information Systems Project
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
MEM 612 Project Management Chapter 5 Scheduling the Project.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 8 – Scheduling.
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Information Technology Project Management – Fourth Edition By Jack T. Marchewka Northern Illinois University Power Point Slides by Gerald DeHondt Grand.
Lecture 3 Part 1 Managing the Information Systems Project.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Managing the Information Systems Project Cont’d
Business System Development
Plan Schedule Management
The Project Schedule and Budget
The Project Schedule and Budget
The Project Schedule and Budget
Information Technology Project Management – Fifth Edition
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
Information Technology Project Management
Project Time Management
Project Management: A Managerial Approach
Information Technology Project Management – Fourth Edition
Project Time Management
CIS 210 Systems Analysis and Development
Project Time Management
Project Time Management
Project Time Management
Presentation transcript:

The Project Schedule and Budget Chapter 7 Copyright 2012 John Wiley & Sons, Inc.

Learning Objectives Describe the Project Management Body of Knowledge (PMBOK®) area called project cost management. Develop a Gantt chart. Develop a project network diagram using the activity on the node (AON) technique. Identify a project’s critical path and explain why it must be controlled and managed. Develop a PERT diagram. Describe the concept of precedence diagramming and identify finish-to-start, start-to-start, finish-to-finish, and start-to-finish activity relationships

The Importance of Project Cost Management IT projects have a poor track record for meeting budget goals A 2011 Harvard Business Review study reported an average cost overrun of 27 percent. The most important finding was the discovery of a large number of gigantic overages or “black swans”

Examples of how not to mange costs The U.S. government (e.g. IRS) The United Kingdom’s National Health Service IT http://www.bbc.co.uk/news/uk-15014288 http://www.bbc.co.uk/news/uk-politics-24130684 http://www.hsj.co.uk/news/technology/rising-cost-of-nhs-it-fiasco/5063357.article#.UlbD8NKsh8E

Project Cost Management Processes Process Group Cost Management Process Major Output Planning CP1: Planning Cost Mgmt Cost Management Plan CP2: Estimating Costs Activity Cost Estimates CP3: Determining the Budget Cost Performance Baseline Monitoring and Controlling MC1: Controlling Costs Work Perf. Measurements Budget Forecasts

What is Cost and Project Cost Management?

Project Cost Management Processes Scope Baseline Schedule Baseline Estimate bases Project Funding Req. Determine Budget Control Costs Estimate Costs Activity Cost Estimates Cost Baseline

PMBOK® Project Cost Management Estimate Costs Focuses on the processes to estimate the monetary resources needed to complete the project work or activities. Determine Budget Aggregating the individual cost for each of the project activities or work package components to determine the cost baseline or overall project budget. Control Costs Updating the project’s status while monitoring the project’s budget and managing any changes to the baseline plan.

The Project Planning Framework

Budget and Schedule Development

Developing the Project Schedule Project Management Tools

Gantt Chart for Planning

Gantt Chart Reporting: Project’s Progress

Project Network Diagram: Activity Analysis for AON Description Estimated Duration (Days) Predecessor A Evaluate current technology platform 2 None B Define user requirements 5 C Design Web page layouts 4 D Set-up Server 3 E Estimate Web traffic 1 F Test Web pages and links C,D G Move web pages to production environment D,E H Write announcement of intranet for corp. newsletter F,G I Train users J Write report to management H,I

Activity on the Node (AON) Network Diagram

Possible Activity Paths Possible Paths Path Total Path 1 Path 2 Path 3 Path 4 Path 5

Critical Path

PERT

Activity Analysis for PERT Predecessor Optimistic Estimates (Days) Most Likely Estimates (Days) Pessimistic Estimates (Days) Expected Duration A None 1 2 4 B 3 5 8 C D 6 E F C,D G D,E H F,G I 9 J H,I .5

Activity Analysis for PERT

Possible PERT Activity Paths Possible Paths Path Total Path 1 Path 2 Path 3 Path 4 Path 5

Precedence Diagramming Method - PDM Based on 4 fundamental relationships

Lead and Lag times Lead is starting the next task before the first task is complete Lag (or negative lead) is the adding of a buffer of time before the next task begins

Critical Path Analysis (with slack time)