HWCR, AT-ACR-IN, 12 May 2005 1 Cryogenic Instrumentation & Controls Commissioning Hardware Commissioning Review Juan CASAS.

Slides:



Advertisements
Similar presentations
The Control System for the ATLAS Pixel Detector
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
SCADA SYSTEM CLASSIFICATION
Sensor/Actuator Manager Candidates CPAC/NeSSI Workshop May 5, 2005, Seattle,WA by Softing North America Ken Hoover.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
European Organization for Nuclear Research PLC services Jerónimo Ortolá, Jacky Brahy EN-ICE Workshop 23 April 2009.
1. Commissioning of cryogenic crates using Mobile Test Bench 1. The Mobile Test Bench 2. Cryogenics crates and equipment – types of transducers and actuators.
NeSSI Update An Implementation of the Generation 2 Bus Siemens Activities November 2006.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
Use of Multimedia in Engineering. Mechatronics engineering is based on the combination from three basic engineering field that is mechaninal, electronics.
Juan Casas1 st June 2007 Instrumentation and controls challenges Juan Casas CERN AT.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
SCADA and Telemetry Presented By:.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
LTC Extended days, 03 March’08 J.M. Jimenez, AT Vacuum Group LHC Vacuum commissioning J.M. Jimenez On behalf of AT-VAC.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
CRYOGENICS AND POWERING
Progress Report on CGSE Control System Project Team of SJTU for AMS-02 Yang Yupu AMS JSC, Jan 8-12, 2007.
European Network of Excellence in AI Planning Intelligent Planning & Scheduling An Innovative Software Technology Susanne Biundo.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
An automated diagnostic system to streamline DSM project maintenance Johan du Plessis 15 August 2012.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
AB-CO review Support for Cryogenics. Philippe Gayet AB/CO IS CERN, 20/09/05 Outline Scope Hardware Type, Responsibility sharing, Status Basic software.
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
HC review - 12 May 2005Luigi SERIO - AT/ACR/OP1 SECTOR COOL DOWN AND CRYOGENIC COMMISSIONING L. Serio.
FAIR Accelerator Controls Strategy
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Session 6 - LHC Installation Chamonix XV January 2006 T.Pettersson EDMS: Installation – some issues.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
60kW Thermosiphon control system
Nikolaos TRIKOUPIS, TE-CRG-CI LS1 projects review: feedback on projects and lessons learnt 01/JUN/2015, Indico
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT 1 Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
FCT and CERN Portuguese Trainee Programme Report
ELQA Electrical Quality Assurance
Injectors BLM system: PS Ring installation at EYETS
MPE main activities planned for LS2
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
Presentation transcript:

HWCR, AT-ACR-IN, 12 May Cryogenic Instrumentation & Controls Commissioning Hardware Commissioning Review Juan CASAS

HWCR, AT-ACR-IN, 12 May QRL versus LHC QRLLHC RIO Specs for UNICOSDONEIn Preparation Controls Specs for UNICOSUnder RevisionTime Critical Hardware for ActuatorsIndustrial TypeIdem; Commissioned for QRL? Tunnel HardwareIndustrial Type RadTol: Critical Procurement Schedule LSS8L: Internal production Learning Contingency (50%)Integrated in planningNOT Accepted Instrumentation TasksNo Repairs, Reporting OnlyFull Commissioning FieldbusProfibusProfibus & WorldFIP Sectors8-1 and part of 7-8 All Sectors QRL tasks not included in LHC tasks => extra time…

HWCR, AT-ACR-IN, 12 May QRL & LHC Schedules QRL > 18.5 wks LHC – 41 wks

HWCR, AT-ACR-IN, 12 May QRL Actual Schedule Note that AL Instrumentation Activity not into ACR-IN tasks

HWCR, AT-ACR-IN, 12 May LHC Pre-requisites General Services UPS Tunnel access required during ALL commissioning tasks Safe access “paserelle” to tunnel-wall equipment Controls Networks: –Ethernet PLC – Gateway – Data Server communication Tunnel WiFi access (Technical & NICE) –Profibus & WorldFIP Optical fiber-Copper couplers Gateways Hardware (Data server, SCADA, PLCs, Gateways, etc) Software for PLCs, Gateways and SCADA Logistics MTF –non-conformities referenced and retrievable –Instrument & Host equipment identification (functional and physical) data Interpolation data generator

HWCR, AT-ACR-IN, 12 May LHC Resources & Tasks (per sector) Generic Tools Transport Vehicle Electrician Tools Sensor/actuator simulation devices Ladder Computer with network access Generic Tasks Track test data on MTF Declare & check in MTF for non conformities Crate Connection (CIW CC) Per sector: avg 125 Crates, 10 cables/crate Crew: 2 Technicians Tasks: Cables Harness Crate Positioning Electrical connection at both ends Duration: 10 weeks => 2 crates per working day

HWCR, AT-ACR-IN, 12 May LHC Resources & Tasks (per sector) RadTol Crate stand-alone commissioning (CIW SU) Per sector: avg 125 Crates, 10 cables/crate, 1900 channels Crew: 2 x (1 instrumentation engineer + 1 Technician) Tasks: EMC Cables Test Check Pressure sensors and hydraulic connections Functional Tests on all channels Repair all conforming channels Commission front-end electronics Check Crate Network Configuration Parameters Duration: 2 x 9 weeks => 2 crates per working day WorldFIP Initialization (CIW CE) Per sector: avg 125 Crates, 2 nodes per crate Crew: 1 fieldbus engineer + 1 Technician + AB-CO Support Tasks: Connect Crate onto fieldbus network Verify Global WorldFIP availabiity Check Gateway availability Duration: 8 weeks => 3 crates per working day

HWCR, AT-ACR-IN, 12 May LHC Resources & Tasks (per sector) Controls at Warm (CIW CS) Per sector: 1900 Channels, Crew: 2 x (1 Control Engineer + 1 Technician) Tasks: Channel Coherence checks SCADA to field: –Actuators: Intelligent Valves, ON/OFF Valves & Heaters –Sensors: Pressure, Temperature, Level, Position, etc. Synoptic conformance check Check that physical readout is coherent with ambient conditions Simulate/check logic seuqnces, PIDs, Linearization Duration: 2 x 16 weeks

HWCR, AT-ACR-IN, 12 May LHC Resources & Tasks (per sector) Controls during Cool-Down (CIC CT) Per sector: 1900 Channels, Crew: 2 Control Engineer + 1 Technician Tasks: Check Sensor evolution Diagnostics of non conformities left from Warm” Set appropriate control loop parameters Duration: 10 weeks Controls during Nominal (CIC OP) Per sector: 1900 Channels, Crew: 1 Control Engineer + 1 Technician Tasks: Diagnostics of non conformities left from Cool-Down” Set appropriate control loop parameters Duration: 11 weeks Surface Support Database/Quality Assurance engineer for Thermometer, Parameters (Cabling, configuration, naming, location), sensor calibration (pressure) Instrumentation Engineer to assess and provide support for field teams

HWCR, AT-ACR-IN, 12 May LHC Resources & Tasks (per sector)

HWCR, AT-ACR-IN, 12 May Shortcomings Infrastructure Ethernet connection very cumbersome: –individual modem VDSL + base WIFI => additional jumping onto equipment –Several teams working in adjacent cells Please provide WIFI as a standard infrastructure inside the tunnel during commissioning –Access to BOTH technical and NICE networks Controls Reliability of controls: –Communication Problems hamper operation –PVSS SCADA to be improved –Too many software versions Profibus: Schneider fieldbus configuration tool is far from user friendly Logistics MTF: –Non-conformities instrument retrieval interface for instrumentation required but non-existent –inner triplet data status? –Naming uniqueness MTF interface required for tunnel reporting IS MTF ADEQUATE FOR INSTRUMENTATION COMMISSIONING TASKS Database/Quality Assurance Support shall be very responsive: –Close to end-user –For AT-ACR depends on a temporary unit of personnel (fellow) Automated Test Equipment development: –delayed continuously by on-site (SMI2, AL premises, etc) instrumentation support.

HWCR, AT-ACR-IN, 12 May Shortcomings: MTF data retrieval This quad does have: 1.Cold-mass thermometer 2.Electrical Heater 3.… How do I know that NC No 90 refers to an electrical Heater?

HWCR, AT-ACR-IN, 12 May Shortcomings: MTF data retrieval

HWCR, AT-ACR-IN, 12 May Naming Conventions: How it works Physical Equipment Serial number MTF Slot name + Tag name Serial number LHC Reference DB Slot name Serial number The slot name + tag name used by the Controls/Operation must coincide with the slot name + tag name registered in LHC Reference DB and in MTF. Project engineer Tag name Controls/ Operation Slot name + Tag name

HWCR, AT-ACR-IN, 12 May All machine components MUST be registered in MTF All instrumentation MUST be assigned to machine assemblies in MTF Naming Conventions: How is it used? (1) The tag name (e.g. TT821) MUST be included when the instrumentation is assigned to a machine assembly in MTF

HWCR, AT-ACR-IN, 12 May The slot names MUST be identical MQ.28Li MQ.29Li QRLAA.30Li MQ.27Li QRLAB.28Li MBC...MBA.29LiMBC...MBA.28Li MQ.28Li MQ.29Li QRLAA.29Li MQ.27Li QRLAB.27Li MBC...MBA.29LiMBC...MBA.28Li AT/ACR name (used by Controls/Operation) Official name (used by MTF) Naming Conventions: How is it used? (2)

HWCR, AT-ACR-IN, 12 May D4.6R7 Q5R7 QRLIA.2R7 Q6R7 QRLEA.6R7 D3.6R7 … …… DFBM.6R7 D4.6R7 Q5R7 QRLIA.6R7 Q6R7 QRLEA.6R7 D3.6R7 … …… DFBM.6R7 Naming Conventions: How is it used? (3) The slot names MUST be identical AT/ACR name (used by Controls/Operation) Official name (used by MTF)

HWCR, AT-ACR-IN, 12 May Naming Conventions: Summary QRLAA.30L8QRLAA.29L8 What??? QRLAA.29L8 is not on MTF!!!

HWCR, AT-ACR-IN, 12 May Major Shortcomings Missing Manpower Cryogenic commissioning consist of a set of specialized tasks: –Will there be a good match between professional qualifications & tasks? –Is training required? If YES: additional resources shall be already at CERN 3-6 month seem the strict minimum LHC schedule show activities in up to 3 sectors at the same time –1 team (warm commissioning) would then be missing ACR-IN tasks planning does not foresee support for external teams –Additional manpower autonomous from day 1; otherwise work can be significantly delayed Is it possible to consolidate critical know-how/ressources: Database/Quality Assurance support relies on temporary personnel Additional process control engineers is required Various No contingency allocation!

HWCR, AT-ACR-IN, 12 May