Cementation Shotcrete Accident May 23 rd 2011. 2 Accident overview Accident Timeline Accident Causation Recommendations Safety Measures Cementation Shotcrete.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHMs commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Lockout/Tagout Awareness Training
L OST T IME I NJURY R EVIEW AND D ISCUSSION 15 July, 2014: At approx. 11:45 hrs the crew was just finishing up in the TM 850 D3 East Sill and preparing.
Northern Ontario Hockey Association
Air Powered Tool Safety Danger of getting hit by the tools attachments Never remove a guard Hoses & connections can fail Use whip restraints or quick connections.
2 Fire Fighter Qualifications and Safety Skill Drills.
Stanley DS11 Diamond Saw.
General Rules Compressed gases and cylinders must be properly stored, transported and used to prevent injury and accidents. Compressed gases and cylinders.
Safety Gas Plus.
High-Pressure Air Bags 101
LOCKOUT TAGOUT Introduction Each year nearly 150 people die because there was a failure to control energy.
Technical support provided by: Highly Pathogenic Avian Influenza Control Programme SOP Use and Maintenance of High Pressure Washer Machine Market chain.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
MNM Fatal Machinery Accident Machinery Accident January 31, 2009 (Texas) January 31, 2009 (Texas) Alumina Operation Alumina Operation Contractor.
Hydraulic Safety Colorado Mine Safety Training Program John Barton CMSP.
Boiler Mountings.
Accident Investigation State of Florida Loss Prevention Program.
Nail Gun Safety. Employer –Responsible for safe condition of tools Employee –Responsible for properly using and maintaining tools.
Isolation of Hazardous Energy Understanding the Requirement of Lockout Tagout 29 CFR
Lockout/Tagout Authorized Employee. What Is Hazardous Energy? –Often invisible –Can be hydraulic or mechanical –Live or stored –Moving machine or equipment.
FILTERING MDP. Safety and Safety Gear  When filtering from a fermentation vessel you should never use carbon dioxide to push the beer through the filter,
Lockout/Tagout Training for Authorized Employees Murray State University.
PROCEDURES TO USE A CHAIN SAW PPT PPT Procedures Refer to Owner’s Manual for important instructions. Locate and obey safety precautions.
High Pressure Lifting Bags
Lockout/tagout Authorized employees
Lockout/Tagout Affected Employees. © Business & Legal Reports, Inc Session Objectives You will be able to: Recognize hazardous energy sources Carry.
Lockout/Tagout Authorized Employee Slide Show Notes
Lockout/Tagout for Affected Employees Understand the Basics.
Ontario Mine Contractor’s Safety Association Incident Review September 18, 2014.
Our Road to Zero Young Davidson Getting to ZERO. Presentation agenda Fall From Scissor Deck  Review of incident  Action taken  Explanation of Green.
Contact with a Stored Energy Source 1 Feb 2012 Summary of events Contributing factors Moving forward, What did we learn and do.
Peoplefirst-us.com. Photos shown in this presentation may depict situations that are not in compliance with applicable OSHA/MSHA/FHWA requirements.
Control Of Hazardous Energy
High Potential Risk Incident Compressed Air-Face / Eye Injury
MNM Fatal Fall of Person Accident Fall of Person Accident April 14, 2009 (Missouri) April 14, 2009 (Missouri) Cement Operation Cement Operation.
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Working at Height Scissor lift, Boom lift and Vehicle mounted platforms Design Specifications.
Cementation #1 Shaft Incident July 6th Incident overview Incident Timeline Incident Causation Recommendations Cementation #1 Shaft Incident.
MNM Fatal Fall of Back Accident Fall of Back Accident April 21, 2008 (Nevada) April 21, 2008 (Nevada) Gold Operation Gold Operation Mechanic Mechanic.
In December of last year (2011) a supervisor in the prep lab was crushing ore samples with a rolls crusher. Oversized material became jammed in- between.
What tests are necessary to make sure your kegs are being cleaned, sanitized and filled correctly By Andrew J. Brewer
Pennsylvania Bureau of Deep Mine Safety Lockout/Tagout Program.
Lockout/Tagout.
MNM Fatal Machinery Accident Machinery Accident February 19, 2009 (Puerto Rico) February 19, 2009 (Puerto Rico) Crushed Stone Operation Crushed.
MNM Fatal /14 Fall of Material Accident Fall of Material Accident August 12, 2010 (Nevada) August 12, 2010 (Nevada) Underground Gold Mine Underground.
HOT-LOADING SAFETY TRAINING FOR THE NEPTUNE BAE 146.
ACCIDENT / INCIDENT REPORTING (Employee Version).
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
Klondex Midas Operations, Inc. Midas Mine Elko County, NV April 28, 2014 Machinery.
© BLR ® —Business & Legal Resources 1408 Lockout/Tagout Authorized Employee.
Striving For Safety Excellence HunterDouglas Corporate Environmental, Safety, Risk Management Lock Out Tag Out Affected Employees.
KIRBY MORGAN HELMET MODELS
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS UAW-GM SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS Copyright © UAW-GM Health & Safety.
Lockout/tagout for authorized employee
MACHINE OPERATION.
Energy is a good servant but a cruel master.
14 Refrigerant Recovery, Recycling, and Recharging.
SAFETY COMMON MACHINE SHOP HAZARDS
air cycle cooling systems
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
Flammable and Combustible Liquids
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Lockout/tagout Refresher Training
Section 4 – Safety in the Laboratory
Compressor Operating Instructions
Bella Vista Fire Department Procedures on Sprinkled Buildings
Click anywhere to get started…
Presentation transcript:

Cementation Shotcrete Accident May 23 rd 2011

2 Accident overview Accident Timeline Accident Causation Recommendations Safety Measures Cementation Shotcrete Accident

Accident Overview 3 Events prior to the accident A crew of 5 Cementation Employees arrived on 355 ml Service Rope Drift at the start of nightshift on May 23 rd, 2011 (2 mechanics and 3 shotcrete crew members). The mechanics had to repair the vibrator on the shotcrete machine before the crew could start shotcreting the back and walls. Once the shotcrete machine was repaired, the scissor lift was moved into position, the area was cleaned up and a pre-op check was performed on the shotcrete machine. The nozzle operator positioned himself on the deck of the scissor lift and proceeded to wash the back and walls in the area that required additional shotcrete. The forklift operator positioned a bag of shotcrete above the shotcrete machine and the shotcrete operator filled the hopper of the machine. Once the nozzle operator completed washing, he connected the 1 inch water hose to the shotcrete hose. A crew of 5 Cementation Employees arrived on 355 ml Service Rope Drift at the start of nightshift on May 23 rd, 2011 (2 mechanics and 3 shotcrete crew members). The mechanics had to repair the vibrator on the shotcrete machine before the crew could start shotcreting the back and walls. Once the shotcrete machine was repaired, the scissor lift was moved into position, the area was cleaned up and a pre-op check was performed on the shotcrete machine. The nozzle operator positioned himself on the deck of the scissor lift and proceeded to wash the back and walls in the area that required additional shotcrete. The forklift operator positioned a bag of shotcrete above the shotcrete machine and the shotcrete operator filled the hopper of the machine. Once the nozzle operator completed washing, he connected the 1 inch water hose to the shotcrete hose. The shotcrete operator turned on the air valve to the feed hose and the nozzle operator turned on the water valve and adjusted the water pressure at the end of the shotcrete hose. The nozzle operator then signaled to the shotcrete operator (via cap lamp) that he was ready to receive shotcrete. The shotcrete operator turned on the feed valve to start sending shotcrete to the nozzle operator. The nozzle operator felt the shotcrete coming through the hose, the shotcrete operator saw the pressure gauge on the machine climb to 6 bar and he shut off the air to the machine (normal pressure is 2 – 3 bar). At this time the nozzle operator felt a violent jerk in the hose and lost his grip and was then stuck on the right side of his face and jaw by the shotcrete hose.

4 Accident Overview ( Continued ) The shotcrete operator turned on the air valve to the feed hose and the nozzle operator turned on the water valve and adjusted the water pressure at the end of the shotcrete hose. The nozzle operator then signaled to the shotcrete operator (via cap lamp) that he was ready to receive shotcrete. The shotcrete operator turned on the feed valve to start sending shotcrete to the nozzle operator. The nozzle operator felt the shotcrete coming through the hose, the shotcrete operator saw the pressure gauge on the machine climb to 6 bar and he shut off the air to the machine (normal pressure is 2 – 3 bar). At this time the nozzle operator felt a violent jerk in the hose and lost his grip and was then stuck on the right side of his face and jaw by the shotcrete hose.

Accident Location 355 Service Rope Drift Drift 355 ml

Accident Time line 6 8.Injured worker is taken to surface, assessed by security and the ambulance was called to take him to TDH. 1. Crew receives line up at pre-shift huddle then proceeds to 355 ml via ramp in the Marcotte utility vehicle. 3. Shotcrete crew do pre-ops and position associated equipment to begin shotcreting. 2. Two mechanics repair vibrator on shotcrete machine and leave the level with the supervisor. 4. Nozzle operator adjusts the water flow to the shotcrete hose and signals for shotcrete. 5. Shotcrete operator opens air valve, shotcrete begins to flow, pressure builds to 6 bar, operator closes air. 6. Nozzle operator is struck on the right side of the face and jaw by the shotcrete hose. 7. Partners go to X-lift to check out and help the operator off the X-lift. Supervisor is notified and returns. Data Blocks

Equipment 7

Immediate Causes Accident Causation 8 Blockage occurs in shotcrete hose. Failure to disconnect hose and nozzle to ensure there was no material build up. The residual build up of shotcrete at the hose connections may have caused a flow restriction through the hose.

Build up at connections 9 Nozzle connection Needle valve Water ring connection

Personal Factors Accident Causation Specific training does not include in-house license on the Aliva 252 shotcrete machine. Training to include proper cleaning of hoses and or equipment. Procedure exists, however it does not include taking apart the hose and nozzle connection points during the cleaning cycle to ensure there is no material build up that could cause a blockage in the hose.

Recommendations Modify Shotcrete procedure to include all hose and nozzle connection points must be disconnected and cleaned after each use. Modify Shotcrete procedure to include all hose and nozzle connections to be checked before each use to ensure no build up of material has occurred. Modify Shotcrete procedure to include checking the air flow resistance of an empty hose, ensuring pressure is less than 1 bar. Modify Shotcrete check list to include the first three recommendations. Review modified shotcrete procedure and checklist with all shotcrete operators. 11

Recommendations ( Continued) 12 Check condition of blow off valve to see if it can be adjusted to blow off at a maximum pressure of 4 bar. Ensure all shotcrete operators are signed off on MTCU Module U0086 “Perform Shotcreting” Ensure all operators are signed off on the specific in-house license for each shotcrete machine. Additional Recommendations not directly related to accident Full face respirator to be used by nozzle operator while shotcreting, this is to be included in procedure and checklist. Whip checks are to be utilized on the shotcrete feed hose connections as well as the air feed lines.

Safety Measures 13 The procedure was modified to reflect the addition of dismantling connections, inspecting and cleaning connections after each use. The procedure also details inspection prior to assembly and use at the beginning of the shift. The pre-operational check outlines an airflow check that does not exceed 1 bar prior to operation. The procedure now clearly reflects the use of a full face power respirator for the nozzle man during shotcreting operations. The procedure clearly states that whip checks are required on material feed hose connections. Training in the MTCU module U0086 “Perform Shotcreting” and an in-house module on the specific shotcrete machine is required for all shotcrete operators. The procedure and check list must be reviewed and signed off by all existing operators before further work.

Porcupine Gold Mines 14 CANADA ARGENTINA CHILE DOMINICAN REPUBLIC MEXICO GUATEMALA USA OPERATING MINES DEVELOPMENT PROJECTS Safe Enough for our Family Making Changes at the Hoyle Deep Project, Hoyle Mine as part of Porcupine Gold Mines working with Cementation to ensure we are building mines safely.