Ollie Ollewagen 7 August 2013 NFS Portal Testing Progress.

Slides:



Advertisements
Similar presentations
Online Tenant Request System Reliable and accurate, the IMPAK online tenant request system significantly reduces telephone time and paperwork.
Advertisements

Page 1 Page 2 Our Service Area We are powered by an enthusiastic team of skilled and professional staff, which enables redeployment.
SeaDataNet Services monitoring Angelos Lykiardopoulos SeaDataNet-2 Training Course July 2012, Oostende, Belgium.
Application Server Based on SoftSwitch
A Successful Help Desk Process for all IT Support
ServiceDesk Plus MSP Product Overview. Why ServiceDesk Plus - MSP? Capability of Managing Multiple Client’s in one Help Desk Stop Juggling with multiple.
Major Incident Process
ProFM Helpdesk Effective Web Based Maintenance Management System.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
Network Redesign and Palette 2.0. The Mission of GCIS* Provide all of our users optimal access to GCC’s technology resources. *(GCC Information Services:
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Introduction <Header Title> Last saved: YYYY-MM-DD
1 No More Paper, No More Stamps: Targeted myWSU Communications Jack Alilunas, Lavon Frazier October 20, 2004.
Interim Text to Information & Training for TelecommunicatorsInformation & Training for Telecommunicators Version 2 August 26, 2013.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
CASE STUDY: Implementing and Administering SAS® Enterprise Guide® Across the Enterprise As a Solution for Data Access Security Ulf Borjesson Evangeline.
Solution Overview for NIPDEC- CDAP July 15, 2005.
Process, Tools, Evaluation
Module CC3002 Post Implementation Issues Lecture for Week 4 AY 2013 Spring.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
© 2006 Avaya Inc. All rights reserved. Avaya Services Michael Dundon Business Development Manager.
Microsoft ® Official Course Module 10 Optimizing and Maintaining Windows ® 8 Client Computers.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
CERN IT Department CH-1211 Genève 23 Switzerland t Service Management GLM 15 November 2010 Mats Moller IT-DI-SM.
Working with the LiveOps Help Desk
CUSTOMER INTERACTION MANAGEMENT SOLUTION FOR RANDSTAD INDIA June 2015 Confidential.
Utilities, Customers & SMS Rudi Leitner. Who in this room has a mobile phone? Who in this room has ever sent a text (SMS) message?
Welcome to the official tour of TrainingEvals.com SM !
GroupLink’s everything HelpDesk Help Desk Best Practices and Trends Que Mangus Marketing Manager Gus Hytonen Senior Account Manager.
A Web Based Workorder Management System for California Schools.
1 Warranty and Repair Management For Infor XA Release 7 WARM Denise Luther – Sr. XA Consultant WARMS Technical Manager CISTECH, Inc. Rod Fortson – Sr.
Technische Universität München Application Performance Monitoring of a scalable Java web-application in a cloud infrastructure Final Presentation August.
User creates problem ticket on Web tool? User has Problem End user requests asst. via , phone, in person. No ticket created Helpdesk staff decides.
 Advanced Metering Working Group (AMWG) Update to RMS 1 August 5, 2014.
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
Scott Butson District Technology Manager. Provide professional to all district staff Professional development has been provided on a regular basis to.
By Anthony W. Hill & Course Technology 1 Help Desk Operation Beisse.
Configuring Workflows Module 4. Overview  Understanding Workflows  Using Default Workflows  Creating Workflow Instances.
Cctv Management Solution - CMS From – Intelitech Solutions Pvt. Limited. [ ITSPL Group ]
8/22/2006 TPTF MIS Update Kate Horne Pat Harris. TPTF8/22/2006 Agenda Review proposed site map Discuss role of MIS task force Obtain clarification on.
1 Local Readiness Team Lead Meeting June 6, 2007.
IT Priorities Minimize CAPEX Maximize employee productivity Grow the business Add new compute resources real- time to support growth Meet compliance requirements.
CRS Helpdesk Software Presented By The Systems House Inc.
How to Build a NOC. Identify Customers –Who are your customers? Understand Customer Expectations –What are your user expectations? –SLA’s? Support Service.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 1 CustomerSoft ESP Contact Operations.
Axios Systems IT Service Management Solutions TM Information Management Good Information Makes the Users Efficient and Positive Brian.
JD Edwards Support & Tools Gillian Boshell Product Service Advisor, Oracle Australia.
Compliance NFS Test Portal Results System Performance Issues & Resolutions Targets Enhancements System Availability YTD (Severity 1) = 99.51% Target for.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
U.S. Department of Agriculture eGovernment Program May 26, 2004 eGovernment Working Group U.S. Department of Agriculture eGovernment Program.
Introduction to ITSM processes. CONFIDENTIAL Agenda Problem Management  Overview  High Level process Change Management  Overview  High Level process.
Software Maintenance1 Software Maintenance.
Gaspar Modelo-Howard NEEScomm Cybersecurity Software Engineer Saurabh Bagchi NEEScomm Cybersecurity Officer.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Call Center Support Process Web Support & Maintenance for BGC Partners Version 1.1 June 3, 2016 Notice: The enclosed material is proprietary to TRIZE Consulting.
LHC T0/T1 networking meeting
Incident Management Incident Management.
Presented by Jon Pastuszynski, Lead M&D Engineer
BA Continuum India Pvt Ltd
Solution Summary Business Service Management Solution on AIX® 6.1.
ITIL: Why Your IT Organization Should Care Service Support
ITIL: Why Your IT Organization Should Care Service Support
IS&T Project Reviews September 9, 2004.
Simplified Development Toolkit
ITIL: Why Your IT Organization Should Care Service Support
Presentation transcript:

Ollie Ollewagen 7 August 2013 NFS Portal Testing Progress

Problems Identified © Telkom 2011 | NFS Portal Feedback | 2 Stability of solution IRTMS Helpdesk not available Fault Reporting cumbersome No feedback on items Reported Test Heads maintenance issues

© Telkom 2011 | NFS Portal Feedback | 3 Web Portal Application EAI – Enterprise Application Integration Clarify Customer Info Warehouse Fault History CBS Network Info / update TaskMate II Testing IRTMS xAct LoopCare DSL_INFO Xsuite ITBM_INFO Xsuite IP Activator Internet authentications Portal User Tech NFS Portal System Flow Diagram SMS Gateway SMS messaging T-Agent EN update / reset xAct DSLAM update / reset

Stability of solution © Telkom 2011 | NFS Portal Feedback | 4 ITS Have done the following The server was spilt from 1 to 4 to manage additional load Memory and tread leaks on the Application were identified and resolved In-&-out bound Interface (EAI) problems were resolved Implement “Fog-light” to monitor and report major incidents ITS created a task team for the NFS Portal to ensure stability and manage incidents, the IT Executive responsible is immediately notified by the monitoring tools when the service degrades The development team did a complete code re-write in the application to handle the load Developed a method to provide better messages to technicians Continuously monitoring the application for improvements ITS enhanced test results to discriminate between Test head failures and Soft failures also providing better instructions to the technician on actions required. – 19 July 2013 Conditional Pass on test head failures with No retry Will Indicate which failures require a manual retry

IRTMS Helpdesk not available © Telkom 2011 | NFS Portal Feedback | 5 Part of ANTC and have long answer times due to staff also performing other functions ANTC staff do not have system skills to analyse problems Support Function moved to NFS System Support – 1 August 2013

Fault Reporting cumbersome © Telkom 2011 | NFS Portal Feedback | 6 Technicians can only telephonically report faults Call centers have no means of Reporting faults. –Implemented a with automatic tracking and feedback. - Done –Implement a reporting function via IPPACMAN - Done –Logged CR to provide function from NFS Portal screen - Waiting for impact study and delivery date from ITS Developed a report that can be extracted indicating all network and test head failures. - Done Investigate the possibility to use Foglight for identification of Network and test head failures – To complete investigation in next month Fault management process implemented between NFS and NCO –Continues improvement will apply to improve repair of Test heads

No feedback on items Reported © Telkom 2011 | NFS Portal Feedback | 7 Technicians never received feedback on faults reported. With move to NFS System Support technicians will receive updates via . Have logged CR for a notice board functionality to give technicians updates on events and highlight problems – Waiting for ITS to do impact study and to provide feedback Have logged CR document distribution to assist techs to get hold of documents to assist them – Waiting for ITS to do impact study and to provide feedback

Test Heads not functional or maintained © Telkom 2011 | NFS Portal Feedback | 8 IRTMS repair takes long due to spares availability –Have implemented an escalation and tracking process No formal Fault management process did exist for LoopCare. –Process now implemented with NNOC and NCO Work on effective routine maintenance on test heads to reduce faults. –Proactive monitoring –Identify problematic sites for investigation –Doing of regular 6 month routine on test heads

Testing Availability © Telkom 2011 | NFS Portal Feedback | 9 IRTMS / LoopCare testing integrated in the following systems –Unibase –NFS Portal –CPH – Clarify for Call Centers All MSAN equipment is implemented with LoopCare testing capabilities.

Implementation © Telkom 2011 | NFS Portal Feedback | 10 OPS Managers trained on how to use NFS Portal fully Technicians trained by OPS Managers Included in Functional MSAN training Included in CoE and ADSL refreshing material Training material developed for Call Centers Call Center Staff trained to use Upfront testing

Call Center LoopCare Training Stats © Telkom 2011 | NFS Portal Feedback | 11 Loopcare Total Target P/RTotal trained In MarchIn AprilIn MayIn JuneIn JulyIn AugustBy Target date NER WR ER CR GR SR Grand Total None Pitch

© Telkom 2011 | NFS Portal Feedback | 12

© Telkom 2011 | NFS Portal Feedback | 13

Next Steps © Telkom 2011 | NFS Portal Feedback | 14 Implement improvement drive for stability and up time for the test heads. Improve proactive reporting process to identify problems before it impacting operations.

Thank You! Ollie Ollewagen