Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
Goshen Area Bus Reconfiguration
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Presentation to WECC TSS May 8, 2015
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Subtransmission Reliability Criteria
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting December 16, 2009.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Rocky Mountain Power Five Year Study Kick Off Meeting.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
1 Local Area Planning Update to TRANSAC – Sept 16, 2015 Mitigation Update, Uncertainty Scenarios, VAR Margin Study.
Energy Storage Applications at AEP Emeka Okafor American Electric Power Presentation to SouthWest Electric Distribution Exchange May 7, 2009.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
Jeff Billo Manager, Transmission Planning
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
Voltage Reduction Task Force Update September 25, 2014 Presentation to ERCOT TAC.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
Austin Energy Elevated Requests for High Reliability Service South West Electric Distribution Exchange (SWEDE) May 8, 2015 David Tomczyszyn, P.E. – Distribution.
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Electric Utility Master Plan Update
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
Yale Runback Local Area Protection Scheme
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
Crescent City Study Kickoff
Presentation transcript:

Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013

© 2000 PACIFICORP | PAGE 2 OGDEN UTAH AREA STUDY DECEMBER 2013 Bhavana Katyal/Scott Murdock

© 2000 PACIFICORP | PAGE 3 Ogden Area Study –The study area covers Davis, Morgan and Weber counties in northern Utah.

© 2000 PACIFICORP | PAGE 4 Ogden Area Study –Major communities served Ogden and Layton. –There are about 45 Pacificorp substations and 32 customer owned substations. –Transmission voltages include 230 kV, 138 kV, 46 kV

© 2000 PACIFICORP | PAGE 5 Generation Within the Study Area Two hydroelectric generators feed into the Pioneer 46 kV bus Two hydroelectric generators feed into the Gateway 46 kV bus One hydroelectric generator feeds into the Weber 46 kV bus One hydroelectric generator feeds into the Pine View 46 kV bus. Ogden Area Study

© 2000 PACIFICORP | PAGE 6 Ogden Area Study Main Sources There are five 345 kV lines in the study area: Two Populus -Ben Lomond 345 kV Line Two Terminal-Ben Lomond 345 kV Line One Terminal-Syracuse-Ben Lomond 345 kV Line There are two 230 kV lines in the study area: One Birch Creek-Ben Lomond 230 kV Line One Naughton-Ben Lomond 230 kV Line There are three 138 kV lines in the study area: One Wheelon-Brigham City-Ben Lomond 138 kV Line One Wheelon-Ben Lomond 138 kV Line One Wheelon-Honeyville-Ben Lomond 138 kV Line There is one 46 kV source in the study area: The Honeyville-Pleasant View 46 kV Line

© 2000 PACIFICORP | PAGE 7 Ogden Area Study –Base System Loads (Co-incidental)  Summer 2012: 862 MW  Winter : 571 MW –Growth  Summer: 2.7%  Winter: 3.2% –Projected System Loads (Co-incidental including block loads)  Summer 2017: 995 MW  Winter : 679 MW

© 2000 PACIFICORP | PAGE 8 Ogden Area Distribution Capacity & Losses –Area Distribution Capacity  Summer: MVA  Winter: MVA –Substation Utilization Factor  Summer 2017: 90%  Winter : 57% –Transmission losses ~ 2% of area load in Summer 2012.

© 2000 PACIFICORP | PAGE 9 Recommended Improvements: Ogden Area Study

© 2000 PACIFICORP | PAGE 10 Ogden Proposed Project –West Point Substation – a new 40 MVA transformer and 138 kV line. In service by Nov 1, Estimated cost: $14,000,000. This project addresses capacity issues on Xfmr#1 at Clearfield South and Clinton. –Midland - Install a new 30 MVA kV Xfmr w/LTC. Earlier scheduled to be in service by Nov Estimated cost: $3,000,000. Can be deferred till 2023 with a distribution load transfer between West Roy and Clinton after West Point substation is in service with further distribution upgrades.

© 2000 PACIFICORP | PAGE 11 Operate CB 49 at the Brigham Switch Rack in a normally open position. –Eliminates low voltage conditions and thermal overload of lines under N-1 conditions. –In service by May 1, Estimated cost: $3,000 Ogden N-1 System Improvements

© 2000 PACIFICORP | PAGE 12 Ogden N-1 System Improvements Transfer Fruit Heights to Parrish and reverse automatic throwover scheme: –Eliminates overload of Riverdale Xfmrs during N-1 conditions. –In service by May 1, Estimated cost: $3,000

© 2000 PACIFICORP | PAGE 13 Ogden Area Recommended Construction Schedule

© 2000 PACIFICORP | PAGE 14 Ogden Area Study –Any Questions or Comments?